Loading...
2021-05-18 CC Agenda Packet - ITEM #9 - PRESENTATION - Parallel Parking Pilot ProjectCITY OF ELSEGUNDO El Segundo Boulevard Parallel Parking Pilot Project Update City Council meeting May 18, 2021 Sight Distance • CalTrans sight distance requirements are not met - 1' y— YP�IV �L SE�lJN%Q 13Li/D.- - - City of El Segundo 1 350 Main St. El Segundo, CA 90245 NI)o 2 Main Issues • 85t" Percentile Speed on El Segundo Blvd is 42 mph hour • Stopping Sight Distance at 40 mph = 300 feet • Posted Speed Limit of 35 mph was utilized for the Pilot Project • Stopping Sight Distance at 35 mph = 250 feet ELSEGUNDO City of El Segundo 1 350 Main St. El Segundo, CA 90245 3 Main Issues • The eye of the driver should be placed 10 feet behind the Stop Bar; where in the Pilot Project analysis the eye of driver was placed 7 feet behind of the front bumper of the vehicle • In the Pilot Project analysis, it was assumed the parked vehicle is 6' wide; where a standard size vehicle requires 9' width for parking from the face of the curb ELSEGU\DO City of El Segundo 1 350 Main St. El Segundo, CA 90245 4 Vehicle "Creep" • In order to make a safe turn onto El Segundo Blvd, vehicles are moving past Stop Bar for needed visibility • Some vehicles are "creeping" into driving lane which is dangerous • "Creeping" vehicles foul the pedestrian crosswalks ELSEGU\DO City of El Segundo 1 350 Main St. El Segundo, CA 90245 5 Recommendation • Remove pylons and parallel parking stalls along El Segundo Boulevard from Main Street to Sheldon Street • Restripe El Segundo Boulevard to its original condition • Develop an alternate pilot parking project (including the conversion of some Smoky Hollow two-way streets to one-way streets and the use of angled parking) and report back with an implementation recommendation by October 5, 2021 ELS6GUYDO City of El Segundo 1 350 Main St. El Segundo, CA 90245 6 Questions ELSEGU\DO City of El Segundo 1 350 Main St. El Segundo, CA 90245 7