Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CONTRACT 5975 Public Works Contract CLOSED
Agreement No. 5975 PUBLIC WORKS CONTRACT BETWEEN THE CITY OF EL SEGUNDO AND PACIFIC TENNIS COURTS, INC. ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 This CONTRACT is entered into this 4th day of November, 2020, by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ("the City") and PACIFIC TENNIS COURTS, INC., a California Corporation ("the Contractor"). 1. WORK. A. The Contractor will provide all work required by the Contract Documents (the "Work"). The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents. B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents; C. The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings. 2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed a total of One Hundred Thirty Four Thousand. Seventy ($134,070.00) for the Work in the manner set forth in the Contract Documents. 3. TIME FOR PERFORMANCE. A. The Contractor will fully complete the Work within Thirty (30) working days (the "Contract Time.") B. The Contract Time will commence when the City issues a Notice to Proceed. Agreement No. 5975 The Contract Documents will supersede any conflicting provisions included on the notice to proceed issued pursuant to this Contract. C. The Contractor may not perform any Work until: The Contractor furnishes proof of insurance as required by the Contract Documents; and ii. The City gives the Contractor a written, signed, and numbered purchase order and notice to proceed. D. By signing this Contract, the Contractor represents to the City that the Contract Time is reasonable for completion of the Work and that the Contractor will complete the Work within the Contract Time. E. Should the Contractor begin the Work before receiving written authorization to proceed, any such Work is at the Contractor's own cost and risk. 4. DISPUTES. Disputes arising from this contract will be determined in accordance with the Contract Documents and Public Contracts Code §§ 10240-10240.13. 5. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third -party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the "Notice" section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third -party claim. 6. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number. 7. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and certificates that may be required in connection with the Work. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the City's property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City's written notice. 9. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Agreement No. 5975 Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification. 10. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor will act as an independent contractor and will have -control of all work and the manner in which is it performed. The Contractor will be free to contract for similar service to be perfonned for other employers while under contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doing the work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only. 11. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents. 12. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: The Citv City of El Segundo -Public Works 350 Main Street El Segundo, CA 90245 Attention: Arianne Bola abola@elsegundo.org (310) 524-2364 The Contractor Pacific Tennis Courts, Inc. 530 Los Angeles Ave., Suite 115-320 Moorpark, CA 93021 Attention: Phil Carter phil@pacifictenniscourts.com (818)991-7445 Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 13. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations under this Contract. Agreement No. 5975 14. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County. 15. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows: A. This Contract; B. The Standard Specifications; and C. Precedence of documents as determined in the Standard Specifications. 16. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect. 17. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract may be modified by written amendment. The City's city manager, or designee, may execute any such amendment on the City's behalf. 18. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 19. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 20. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract. 21. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents. Agreement No. 5975 IN WITNESS WHEREOF the parties hereto have executed this Contract the day and year first hereinabove written. CITY OF SE a O PAC IC TEN "OURTS, INC. Scott tni'Ic... � Name: h i l Carter City Manager Titi , resident. ATTES Taxpayer ID No. 90-0897962 Tracy eavV'e City Clerk Contractor State License No.: 980738 Contractor City Business License No.: 41242 APPROVED AS TO FORM: Q1 -\for Mark D. Hensley, City Attorney Insurance Reviewed by: V Agreement No. 5975 PROPOSAL FOR THE ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Date Auqust 31 .2020 Company Name: Pacific Tennis Courts. Inc. TO THE CITY OF EL SEGUNDO: In accordance with the City of El Segundo's Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and Contract documents therefor, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other Contract documents. Submittal of this bid shall be considered evidence that the BIDDER has satisfied himself regarding the Contract documents, access and any other field conditions which may affect bid prices. If this proposal is accepted for award, BIDDER agrees to enter into a Contract with the City of El Segundo at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a Contract in the manner and time prescribed will result in forfeiture to the City of El Segundo of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the Contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER'S default in executing the required Contract and filing the necessary bonds and insurance certificates within ten working days after the date of the City of El Segundo's notice of award of Contract to the BIDDER, including sending by U.S. Mail a Public Works Contract for signature by the Awardee, the proceeds of the security accompanying this bid shall become the property of the City of El Segundo and this bid and the acceptance hereof may, at the City of El Segundo's option, be considered null and void. I -C-1 Agreement No. 5975 L'U"L �,q "Pi,C Y a� T OPi"OiI'I'"UNI"fV COMl'jA2j-CL BIDDER certifies that in all previous Contracts or Subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFS' IRMA,PYE .ACIMILEyR"1i IFIC;°A" ION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be Subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any Contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the Contract documents. BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the City of El Segundo is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud. I -C-2 Agreement No. 5975 BIDDER'S INFORMATION Company Name; Pacific Tennis Courts„ Inc. BIDDER certifies that the following information is true and correct: Form of Legal Entity (i.e., individual, partnership, corporation, etc.) If corporation, State of Incorporation (i.e., California) California Business Pacific Tennis Courts, Inc. Address 530 Los Anqeles Ave., Suite 115-320 ......Moorpark..m_CA...93.�.2..�............................................................................................................................................................................� Telephone No......... @j8 991-7445 _.......................... Facsimile No. X818) 706-1951 State Contractor's License No. and Class 980738 A, B, C-8 Original Date Issued Expiration Date 1/30/2013 1/31/2021 The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest in this proposal: Phil Carter The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows: N/A All current and prior DBA's, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: N/A I -C-4 Agreement No. 5975 BIDDER'S INFORMATION (CONTINUED) Company Name: Pacific Tennis Courts, Inc. Bidder shall list he. raga e oft a pe soil wiawa attend di fl aaaN Malo are -bid job walk: Name: t Title: o w d I -C-5 Agreement No. 5975 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all a forenamed principals this3i�day of i , 20 20 . BIDDER Pacific Tennis Courts, Inc. 530 Los Angeles Ave., Suite 115-320 Moor ark, CA 93021 Subscribed and sworn to this S\ -0 - NOTARY PUBLIC A notary ttio,�R� LI - L' or W)or nf1'ica�r'r.c mr°agXgc°0.'6r� r 11111 '"P111 rtafrr,, tlrr. uro Luorl"IrWti � Ey of tl)rluvfl�9tir��l `,rfmcr sietrwe19 rhr1a �+r:�o IcBi'r�G,i N°or ��r near to tiv�xkh Phki ceraif o.' +ce us m wlc t'hd;rrr, t and ritir 9'hm 1rruMf qu6r5rp;[, AcCM.Arr c. y,, or valiic Ry of thak�ine'uPo ntl, STATE OFCAUFORNA COUNTYOF Subscribed and sworn to (qr afflrmed) before me on 'this 3t'tdayol %, Z6 by dry 6'ei0r proved to noon basis of satisfactory evidence to be the peraon(s) whoappeared before me. A (Signature of Notary) day of A.'�.M'5� r 20 20 I -C-6 L. P. STCKKA COMM. 2197017 3 FQ NOTARY r fliW1 CAN rF'OR MtaA VENTURAiCOUNTY Agreement No. 5975 BID SCHEDULE ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Company Name: Pacific Tennis Courts„ Inc. Base Bid Items Unit Price Item Total Item Description Estimated (in figures) (in figures) No. Unit Quantity Dollars/Cents Dollars/Cents 1 Mobilization/Demobilization LS 1 20.00 20,000.00 White HDPE - U.V. Stabilized Sheet and all 2 necessary hardware EA 60 300.00 18,000.00 (3/4"x48"x97) (Desert Sand Finish) Yellow Kickplate — U.V. 3 Stabilized and all necessary EA 126 100.00 12 600.00 hardware (3/4"x6"x48") ' (Bullnosed) Straight Blue Topsill — U.V. 4 Stabilized and all necessary EA 88 100.00 8,800.00 hardware (3/4"x5"x48") Radius Blue Topsill — U.V. 5 Stabilized and all necessary EA 36 hardware (3/4"x5"x48") 125.00 4,500.00 (20'-4" radius) Remove and reconstruct 6" 6 concrete slab with footing SF 1,185 20.00 23,700.00 and reinforcement steel Install 2' deep section of 7 crushed miscellaneous base SF 1,185 10.00 11,850.00 (CMB) 8 Remove and reconstruct 4" SF 330 40.00 13,200.00 thick concrete walkway 9 Install 4" subdrain LF 248 55.00 13,640.00 perforated pipe 10 Install 6" PVC pipe LF 70 45.00 3,150.00 (schedule 35) Connect proposed drainage 11 system to existing catch LS 1 4,500.00 4,500.00 basin Repair cracks, depressions, 12 surface defects and uneven LS 1 5,500.00 5,500.00 areas I -C -3a Agreement No. 5975 Two hundred four thousand one hundred ten dollars and 00/100 ----------- I-C-3a Apply concrete roller hockey surface color coating 13 system (2 coats) (prepare SF 11,710 2.00 23,420.00 surface per manufacturer's recommendations prior to application) 14 Replace all roller hockey LS 1 5,500.00 5,500.00 striping per as -built plans Printing and installation of LA Kings logo onto the 15 dashboard (prepare surface EA 6 per manufacturer's 2,000.00 12,000.00 recommendations prior to application) Printing and installation of LA Kings logo onto the center of the concrete 16 hockey rink (prepare surface EA 1 2,000.00 2,000.00 per manufacturer's recommendations prior to application) Printing and installation of LA Kings logo onto the 17 player bench (prepare surface per manufacturer's EA 2 1, 000.00 2, 000.00 recommendations prior to application) Remove and replace chain link fence (approximately 6' 18 high) including necessary poles (approximately 29 LF 95 105.00 9,975.00 poles) at the perimeter of the new concrete rink Remove and replace chain link fence (approximately 19 10' high) on top of the 6' LF 55 100.00 5,500.00 high chain link fence at the goal crease Install perimeter curb 20 (approximately 3" high) at LF 95 45.00 4,275.00 the new concrete rink TOTAL BASE BID FOR ITEMS 1-20 IN FIGURES = ` 204,1 10.00 TOTAL BASE BID FOR ITEMS 1-20 WRITTEN IN WORDS: Two hundred four thousand one hundred ten dollars and 00/100 ----------- I-C-3a Agreement No. 5975 Alternative Bid Items __m_..... . �...................... ..................._.m_..mm._...- — Unit Price Item Total Item Description Estimated (in figures) (in figures) No. Unit Quantity Dollars/Cents Dollars/Cents Remove and replace chain 1 link fence (approximately 6' LF 375 100.00 37,500.00 high) at the perimeter of the existing rink TOTAL ALTERNATIVE BID FOR ITEM 1 IN FIGURES = $ 37,500.00 TOTAL ALTERNATIVE BID FOR ITEM 1 WRITTEN IN WORDS: Thirty seven thousand five hundred and 00/100 -------------- I-C-3a Agreement No. 5975 PACIFIC TENNIS COURM INC, 530 Los Angeles Avenue, Suite 115-320, Moorpark, CA 93021 Phone (818) 991-7445 Fax (818) 706-1951 �PACIFIC TENNIS COURTS, Resolution Pertaining to Corporate Authon'J The Undersigned is the President, Secretary, and Treasurer of PACIFIC TENNIS COURTS, INC. The undersigned certifies that the Board of Directors adopted the following resolution at its meeting on February 26, 2019. WHEREAS, the Corporation negotiates, submits bids, and enters into contracts for construction projects; and NOW, THEREFORE, BE IT RESOLVED, that this Company is authorized to submit bids and proposals, and enter into contracts for construction projects; and RESOLVED FURTHER, that the officers of this Company, and in particular, PHILIP CARTER, as President, Secretary, and Treasurer of the Corporation, is hereby authorized and directed to prepare, and execute on behalf of the Company and necessary documentation, agreements, bids and proposals which may be necessary to complete this transaction. I hereby certify that the foregoing is a true and accurate representation of the resolution adopted by the Board on February 26, 2019. A��'-'41LIP CARTER CONTRACTORS LICENSE NUMBER: CALIFORNIA: 980738 (A, B, C-8) Agreement No. 5975 BIDDING INSTRUCTIONS 1. DEFINITIONS. Unless provided otherwise, the definitions in the Greenbook, Special Conditions, or other Contract Documents are applicable to all Bidding Documents. 1.1 "Addenda" means written or graphic instruments issued by the City before the Bid Deadline that modify or interpret the Bidding Documents by additions, deletions, clarifications, or corrections. 1.2 "Alternate" means a proposed change in the Work, as described in the Bidding Documents which, if accepted, may result in a change to either the Contract Sum or the Contract Time, or both. 1.3 "Bid Deadline" means the date and time designated in the Notice for Bids as the last date and time for receipt of Bids, as may be revised by Addenda. 1.4 "Bidder" means a person or firm that submits a Bid. 1.5 "Bidding Documents" means the construction documents prepared and issued for bidding purposes including all Addenda. 1.6 "Lump Sum Base Bid" means the sum stated in the Bid for which Bidder offers to perform the Work described in the Bidding Documents, but not including unit price items or Alternates. 1.7 "Unit Price" means an amount stated in the Bid for which Bidder offers to perform the Unit Price Work for a fixed price per unit of measurement. 2. BIDDER'S REPRESENTATIONS. By making its Bid, Bidder represents that: 2.1 Bidder read, understood, and made the Bid pursuant to the requirements in the Bidding Documents. 2.2 Bidder visited the Project site and is familiar with the conditions under which the Work will be performed and the local conditions as related to the Contract Documents. 2.3 The Bid is based upon the materials, equipment, and systems required by the Bidding Documents. 2.4 Bidder and all Subcontractors, regardless of tier, have the appropriate current licenses issued by the State of California Contractor's State License Board for the Work to be performed. If Bidder is a joint venture, the Bidder will have a joint venture license appropriate for the performance of the work, and each member of the joint venture will likewise have the appropriate license. Business and Professions Code §§ 7000-7191 establish licensing requirements for Contractors. If a Bidder, that is a specialty Contractor, submits a Bid involving 3 or more specialized building trades, the work of which is more than incidental and supplemental to the performance of the Work for which Bidder holds a specialty Contractor license, Bidder must also hold a General Engineering Contractor "A" license. This requirement is applicable whether or not Bidder lists a Subcontractor for each such trade. 2.5 If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Contractors' State License Board which establishes that the individual or entity MM Agreement No. 5975 bringing the action was duly licensed in the proper classification of Contractors at all times during the performance of any act or Contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2.6 Bidder has the expertise and financial capacity to perform and complete all obligations under the Bidding Documents. 2.7 The person executing the Bid Form is duly authorized and empowered to execute the Bid Form on Bidder's behalf. 2.8 Bidder is aware of and, if awarded the Contract, will comply with Applicable Code Requirements in its performance of the Work. 2.9 The Bidder has paid the City's business license fee(s) 2.10 The Bidder, per SB 854 requirements for public projects, has registered with and paid their annual fee to the California State Department of Industrial Relations. Information about SB 854 and its requirements can be found at this link: http://www.dir.ca.gov/Public-Works/SB854.html 3. BIDDING DOCUMENTS 3.1 Bidders may obtain complete sets of the Bidding Documents from the City's Public Works Department for the sum stated in the Notice for Bids. 3.2 Bidders will use a complete set of Bidding Documents in preparing Bids. 3.3 The City makes copies of the Bidding Documents available, on the above terms, for the sole purpose of obtaining Bids for the Work and does not confer a license or grant permission for any other use of the Bidding Documents. 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS. 4.1 Before submitting its Bid, Bidder will carefully study and compare the various documents comprising the Bidding Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the Bid is submitted; will examine the Project site, the conditions under which the Work is to be performed, and the local conditions; and will at once report to the City's Representative errors, inconsistencies, or ambiguities discovered. 4.2 Requests for clarification or interpretation of the Bidding Documents will be addressed to the City's Representative. 4.2.1 The release of the bid package begins a quiet period for potential Bidders participating in this project. The City of El Segundo realizes it is critical to provide Bidders with a vehicle to ask questions so that quality responses can be prepared. Questions must be submitted in writing to project managers via the City website: https://www.elsegundo.org/government/departments/publ ic- works/request-publ ic-works-bid Responses to all questions will be provided in writing to all Bidders in accordance with the schedule below. We will not identify companies or individuals that pose questions. Potential bidders must not call City of El I -B-2 Agreement No. 5975 Segundo employees to discuss potential projects or ask questions regarding the bid. Questions Due by 5:00 pm, Wednesday, August 12, 2020 Questions Answered by 4:00 pm Friday, August 14, 2020 4.3 Clarifications, interpretations, corrections, and changes to the Bidding Documents will be made by Addenda. Clarifications, interpretations, corrections, and changes to the Bidding Documents made in any other manner will not be binding and Bidders must not rely upon them. 5. PRODUCT SUBSTITUTIONS. Substitutions will only be considered before award of the Contract and as provided for in the Contract Documents. 6. SUBCONTRACTORS. 6.1 Each Bidder will list in the Bid Form all first-tier Subcontractors that will perform work, labor or render such services. The Bid Form contains spaces for the following information when listing Subcontractors: (1) Work Activity; (2) name of Subcontractor; (3) city of Subcontractor's business location. Failure to list any of these items on the Bid Form will result in the City treating the Bid as if no Subcontractor was listed for the Work and that Bidder represents to the City that it is fully qualified to perform that portion of the Work and will perform do so. 6.2 Subcontractors listed in the Bid Form will only be substituted after the Bid Deadline with the City's written consent in accordance with California law. 7. ADDENDA. 7.1 Addenda will be in writing and issued only by the City. Addenda will be mailed or delivered to all who are known by the City to have received a complete set of Bidding Documents and who have provided a street address for receipt of Addenda. 7.2 Copies of Addenda will be made available for inspection at the City's Public Works Department. 7.3 The City will issue Addenda so that they are received by prospective Bidders not later than three (3) business days before the Bid Deadline. Addenda that withdraw the request for Bids or postpone the Bid Deadline may be issued anytime before the Bid Deadline. 7.4 Each Bidder is responsible for ensuring that it has received all issued Addenda before issuing a Bid. 8. PRE-BID CONFERENCE. Bidder will attend a Pre -Bid Conference where the City will discuss the Bidding Documents, answer questions, accept comments, and conduct a Project site visit. The City requires all Pre -Bid Conference attendees to arrive for the meeting on time and to sign an attendance list which is used to determine if Bidders meet this requirement. Any Bidder not attending the Pre -Bid Conference in its entirety will be deemed to have not complied with the requirements of the Bidding Documents and its Bid will be I -B-3 Agreement No. 5975 rejected. 9. FORM AND STYLE OF BIDS 9.1 Bids will be submitted on the Bid Form included with the Bidding Documents. Bids not submitted on the City's Bid Form will be rejected. 9.2 All blanks on the Bid Form will be filled in legibly in ink or by typewriter. 9.3 Bidder's failure to submit a price for any Alternate or unit price will result in the Bid being considered as nonresponsive. If Alternates are called for and no change in the Lump Sum Base Bid is required, enter "No Change." 9.4 Each Bidder must fill out the "Bidders Statement of Past Contract Disqualifications" form stating any and all instances of Contract disqualifications due to a violation of a law or safety regulation. The Bidder must explain the circumstances of each disqualification. The City may reject the bid based on such information. 9.5 Bidder will make no stipulations on the Bid Form nor qualify the Bid in any manner. 9.6 The Bids will be based upon full completion of all the Work as shown on the plans and specifications. It is expressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the Bidder (if awarded the Contract) specifically agrees to construct a completed work ready for the use and in the manner which is intended. In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished must be paid for according to the unit or lump sum price established for such work under the Contract, wherever such unit or lump sum price has been established. In the event no prices are named in the Contract to cover such changes or alterations, the cost of such changes must be covered as extra work. 9.7 The Bid Form will be signed by a person or persons legally authorized to bind Bidder to a Contract. Bidder's Representative will sign and date the Declaration included in the Bid Form. Failure to sign and date the declaration will cause the Bid to be rejected. 9.8 Bids must be submitted in writing on the Proposal forms provided by the City of El Segundo. One (1) set of these Proposal forms is inserted loose herein for use by the bidders. Bidders are required to submit one (1) original set of the proposal forms. All information requested therein must be clearly and legibly set forth in the manner and form indicated. 9.9 Bidders must satisfy themselves by personal examination of the work site, Plans, Specifications, and other Contract documents, and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the work must be performed. No bidder shall at any time after submissions of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies found in the Plans, Specifications, or other Contract documents shall be called to the attention of the City of El Segundo and clarified prior to the submission of proposals. I -B-4 Agreement No. 5975 10. BID SECURITY 10.1 Each Bid will be accompanied by Bid Security, in the amount of 10% of the Lump Sum Base Bid as security for Bidder's obligation to enter into a Contract with the City on the terms stated in the Bid Form and to furnish all items required by the Bidding Documents. Bid Security will be a Bid Bond on the form provided by the City or a certified check made payable to "City of El Segundo." When a Bond is used for Bid Security, failure to use the City's Bid Bond form will result in the rejection of the Bid. 10.2 If the apparent lowest responsible Bidder fails to sign the Agreement and furnish all items required by the Bidding Documents within the time limits specified in these Instructions to Bidders, the City will disqualify such Bidder and select the next apparent lowest responsible Bidder until all bids have been exhausted or the City may reject all bids. In such an event, the disqualified Bidder will be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the Bid Security, between the amount of the disqualified Bid and the larger amount for which the City procures the Work. 10.3 If a Bid Bond is submitted and an attorney-in-fact executes the Bid Bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the Bid Bond. The surety issuing the Bid Bond will be listed in the latest published State of California, Department of Insurance list of, "Insurers Admitted to Transact Surety Insurance in This State." 10.4 The City will retain Bid Security until the occurrence of one of the following: 10.4.1 All items required by the Bidding Documents have been furnished and the Agreement has been signed by the successful Bidder and the City. 10.4.2 The specified time has elapsed during which Bids may be withdrawn. 10.4.3 All Bids have been rejected. 10.5 The Bid Form, Bid Security, and all other documents required to be submitted with the Bid must be enclosed in a sealed opaque envelope. The envelope must be addressed to the City Clerk. The envelope must be identified with the Bidder's name and address, and identify the Project for which the Bid is submitted, as follows: "SEALED BIDS FOR PW 19-13: ROLLER HOCKEY RINK IMPROVEMENTS. DO NOT OPEN WITH REGULAR MAIL." Proposals may be mailed or delivered by messenger. 10.6 Bids will be deposited at the designated location on or before the Bid Deadline. A Bid received after the Bid Deadline will be returned to Bidder unopened. 10.7 Bidder will assume full responsibility for timely delivery at the location designated for receipt of Bids. 10.8 Oral, telephonic, facsimile, or telegraphic Bids are invalid and will not be accepted. 10.9 All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws related to bids for Contracts of this nature whether the same is expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and other Contract documents, and to full compliance therewith. I -B-5 Agreement No. 5975 11. MODIFICATION OR WITHDRAWAL OF BID. 11.11 Before the Bid Deadline, a submitted Bid may be modified or withdrawn. Notice of such action will be given to the City in writing and signed by the Bidder's authorized representative. A change so made will be so worded as not to reveal the amount of the original Bid. 11.12 A withdrawn Bid may be resubmitted up to the Bid Deadline, provided that it then fully complies with the Bidding Requirements. 11.13 Bid Security will be in an amount sufficient for the Bid as modified or resubmitted. 11.14 Bids may not be modified, withdrawn, or canceled within sixty (60) days after the Bid Deadline unless otherwise provided in Supplementary Instructions to Bidders. 11.15 Proposals may not be withdrawn after said Bid Deadline without forfeiture of the proposal guarantee. 11.16 The withdrawal of a proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so. 11.17 No mention shall be made in the proposal of Sales Tax, Use Tax, City Business License, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable. 11.18 No mention shall be made in the proposal of the cost of bonds as all amounts bid will be deemed and held to include any such costs, which may be applicable. 12. OPENING OF BIDS. Bids submitted in the manner required by these instructions and are received on or before the Bid Deadline will be opened publicly. 13. REJECTION OF BIDS. 13.1 The City will have the right to reject all Bids. 13.2 The City will have the right to reject any Bid not accompanied by the required Bid Security or any other item required by the Bidding Documents, or a Bid which is in any other way materially incomplete or irregular. 13.2.1 Unrequested/unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic, or telephonic proposal, modification, or withdrawal will be considered. 13.3 In the event that any bidder acting as a prime Contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to Subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime Contractor. No proposal will be accepted from a bidder who has not been licensed in accordance with the provisions of the State Business and Professions Code. 14. AWARD 14.1 The City may retain all bids for a period of ninety (90) days for examination and comparison, and to delete any portion of the work from the Contract. 14.2 The City will have the right to waive nonmaterial irregularities in a Bid and to accept the lowest responsive Bid as determined by The City. 14.3 The City will have the right to accept Alternates in any order or combination, unless I -B-6 Agreement No. 5975 otherwise specifically provided in the Bidding Documents. 14.4 The City will determine the low Bidder on the basis of the sum of the Lump Sum Base Bid plus all unit prices multiplied by their respective estimated quantities as stated in the Bid Form, if any, plus the Contractor Delay Damages multiplied by the "multiplier" as stated in the Bid Form, plus the amounts of all accepted Alternates. 14.4.1 Inclusion of Contractor Delay Damages within the Bid Form is solely for the purpose of determining the low bidder and establishing the City's maximum daily liability as a result of City delays to Contractor, if any, and City has no obligation to pay any daily Contractor Delay Damages except as provided for in these Contract Documents for Compensable Delays. In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Proposal Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 14.5 The City will select the apparent lowest responsive and responsible Bidder and notify such Bidder within thirty (30) days (unless number of days is modified in Supplementary Instructions to Bidders) after the Bid Deadline or reject all bids. Within ten (10) days after receiving the City's notice that Bidder was selected as the apparent lowest responsible Bidder, Bidder will submit to the City all of the following items: 14.5.1 Two originals of the Agreement signed by Bidder. 14.5.2 One original of the Payment Bond. 14.5.3 One original of the Performance Bond. 14.5.4 Certificates of Insurance on form provided by the City. 14.5.5 Names of all Subcontractors, with their addresses, telephone number, facsimile number, trade on Bidders' company stationery. Evidence, as required by the City, of the reliability and responsibility of the proposed Subcontractors such as statements of experience, statements of financial condition, and references. 14.5.6 Preliminary Contract Schedule. 14.5.7 Selection of Retention Options and Escrow Agreement for Deposit of Securities in Lieu of Retention and Deposit of Retention. If not submitted, the City will withhold retention. 14.5.8 Cost Breakdown. 14.6 Before award of the Contract, the City will notify Bidder in writing, if the City objects to a Subcontractor proposed by Bidder, in which case Bidder will propose a substitute acceptable to the City. Failure of the City to object to a proposed Subcontractor before award will not preclude the City from requiring replacement of any Subcontractor based upon information received subsequent to award, information which cannot be properly evaluated before award due to time constraints, or information relating to a failure to comply with the requirements of the Contract. 14.7 If Bidder submits the original signed Agreements and all other items within ten (10) days after receiving the City's notification, and all such items comply with the requirements of the Bidding Documents, the City will award the Contract to Bidder by signing the Agreement and returning a signed copy of the Agreement to Bidder. 14.8 If the City consents to the withdrawal of the Bid of the apparent lowest responsible Bidder, or the apparent lowest responsible Bidder fails or refuses to sign the I -B-7 Agreement No. 5975 Agreement or submit to the City all of the items required by the Bidding Documents, within ten (10) days after receiving the City's notification, or the City determines that the Bidder is not financially or otherwise qualified to perform the Contract, the City may reject such Bidder's Bid and select the next apparent lowest responsible Bidder, until all bids are exhausted, or reject all Bids. I -B-8 Agreement No. 5975 PROPOSAL GUARANTEE BID BOND ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-1 KNOW ALL MEN BY THESE PRESENTS that, Pacific Tennis Courts, Inc. _ , as BIDDER, and Merchants Bonding Company (Mutual) , as SURETY, are held and firmly bound unto the �, p.............of Bid Amount DOLLARS Ci of El Segundo in the penal sum of Ten Percent ($0 0% of Total Bid ), which is ten (10%) percent of the total amount bid by BIDDER to the City of El Segundo for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to the City of El Segundo for the above stated project, if said bid is rejected, or if said bid is accepted and a Contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City of El Segundo. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this 19th day of August , 20 20 . BIDDER* Pacific Tennis Courts, Inc. to115-3 0 lloc�rp rk, CA 93021 ,r rU rt er, President SURETY* Bonding Company (Mutual) P.O. Box 14498, Des Moines, Iowa 50306-3498 Phone: (800) 678-8171 -- Melinda C rlspn, Underwriter PO 1933 3ry By: Melissa Lopez; Attorney -in -Fact *SEE ATTACHED CALIFORNIA Subscribed and sworn to this da �f 20 ALL-PURPOSE NOTARY PUBLIC ACKNOWLEDGEMENT* *Provide BIDDER/SURETY name, title, address and telephone number and the name, title, address and telephone number for authorized representative. *See Above for Bidder and Surety Contact *Agent: Performance Bonding Surety and Insurance Brokerage, LP 15901 Red Hill Avenue, Suite 100, Tustin, CA 92780 714-505-7000, Jennifer Anaya, Associate Vice President I -C-7 Agreement No. 5975 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 uiA.�"d;`; 4R'M"",•�',�.t:`,e ;'C"{, +�"',;"�;''A".,�z; b':M.iC"m',.qi.h`i:{,"'.tir.^h'"n£''r�':81?.�.''iYe,w{`•^�.�`"d„W'ACS'.4..A°4.M�<.":'ew.^1'n4�h..f�"C,`e",9";w,".ri.�,wAwk,S,.1",�',.'""M1. 4. �"A, r45rw,.A�rC41. a Y •' A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of Orange k On . AUG I I "M before me, Date personally appeared Melissa Lopez Frances Lefler,, Notary Public Here Insert Name and Title of the Officer Name(s) of Signer(s) who proved to me on the basis of satisfactdry evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/theyexecuted the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. FRANCES LEFLER WITNESS my hand and official seal. COMM. # 2325424 0 NOTARY PUBLIGCAUFORNIA N ORANGE COUNTY tV Signature _ Signature MY COMM, EXP, APRIL 23,202 g re of Noir public Place Notary Seal Above ` OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Capacity(fes) Claimed by Signer(s) Signer's Name:.. Corporate Officer — Title(s): Partner — J Limited __ General Individual i=-1 Attomey in Fact Trustee I Guardian or Conservator Other: Signer Is Representing: Document fate - Signer(s) Other Than Named Above: Signer's Name: Corporate Officer — Title(s). . W L. Partner — I Limited LGene. _..._ _ ral Individual Attomey in Fact Trustee Guardian or Conservator Other: Signer Is Representing: -_.• ,,__ ,,,,,,,,,•,�,_ +,"",.:°'`;..w.r✓s;'R"'��nS�a."�;.'¢.srt,'°,:':;;'.w.�;"k,'+,btu".fi„°Jnr.,`r:Baa•'"S.'S"'CM;^'";;"rx,;a,2'coq;ryJra�":;..K(..;%•'.,'k.;,"+.wM�w:°.!'8-'J?.";,:Kr.��1..,M'Gw,.:cCrss+�•'�r.:;�.;,'erg,'.;'"W'��.rdra�Ca_.°.�i 02014 National Notary Association • www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5907 _ME RCNTS Agreement No. 5975 BONDING COMPANY - POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Erik Johansson; Frances Lefler; James W Johnson; Jennifer Anaya; Jessica Hollaender; Melissa Lopez their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 11th day of February 2020 10 44 i16� ^ d��*"� "' fly``' f�0 " » MERCHANTS BONDING COMPANY (MUTUAL) MIERCHANTJS NATIONAL BONDING, INC. Z` w rte" 2003 .. "° 1933 By ,,,p • 'per �yw"' Ar "ywS",y*V,?...DL . • "ii** Pd°e5'P87t STATE OF IOWA ..:...»,.*mow"» COUNTY OF DALLAS ss. On this 11th day of February 2020 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. oy?�tA4 POLLY MASON Commission Number 750576 Z ° ° '' My Commission Expires * January 07, 2023 Notary Public (Expiration of notary's commission does not invalidate this instrument) 1, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 19th day of August , 2020 www w.�w ew�+.a.�w�* w« * * *!Ww�,G Cly* w 2003. ; w " 1933 Secretary *w*�. A. ......... w"» *** Mrjp"" F M,, •"" w* POA 0018 (1/20) �*,**�"*,,.w»w«%"' •*•*.*** Agreement No. 5975 '4" MERCHANTS� BONDING COMPANYIM MERCHANTS BONDING COMPANY (MUTUAL) » P.O. BOX 14498 » DES MOINES, IOWA 50306-3498 PHONE: (800) 678-8171 • FAX: (515) 243-3854 ADDENDUM TO BOND This Addendum is in reference to the bond(s) to which it is attached. Merchants Bonding Company (Mutual) ("Merchants") deems the digital or electronic image of Merchants' corporate seal below affixed to the bond(s) to the same extent as if a raised corporate seal was physically stamped or impressed upon the bond(s). The digital or electronic seal below shall have the same force and effect as though manually fixed to the bond(s). All terms of the bond(s) remain the same. Signed and effective March 23, 2020. MERCHANTS BONDING COMPANY (MUTUAL) 8� Larry Taylor, President 1. 2. 3. Agreement No. 5975 CONTRACTOR'S LICENSE DECLARATION (Business and Professions Code Section 7028.15) BIDDER'S Contractor's License Number is: 980738 Class No.: A, B, C-8 The expiration date of BIDDER'S Contractor License is: January 31 , 20 21 BIDDER acknowledges that Section 7028.15(e) of the Business and Professions Code provides as follows: "A licensed Contractor shall not submit a bid to a public agency unless his or her Contractor's license number appears clearly on the bid, the license expiration date is stated, and the bid contains a statement that representations herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non-responsive and shall be rejected by the public agency." The undersigned declares, under penalty of perjury, that the representations made by the undersigned in this bid proposal are true and correct. Executed on Aua 31 , 20 20, at Moorpa , CA Sign ture Phil Carter Typed Name President Title Pacific Tennis Courts, Inc. Company Name (insert City and State where Declaration signed). I -C-8 Agreement No. 5975 NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ) ss. County of Ventura) Phil Carter , being first duly sworn, deposes and say that he or she is President of Pacific Tennis Courts. Inc. the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed Contract; that all statements contained in the bid are true; and further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof", or the contents thereof, or divulged information or data relative thereto, or paicf,,wiad will not pay, any fee to any corporation, partnership, company association, organ tion, bid depository, or to any member or agent thereof to effectuate a collusive or slia bid. Sign ktUre Phil Carter Typed Name President Title Isis' Pacific Tennis Courts, Inc. Narbe of Bidder/Comp,-ny Name Date Agreement No. 5975 WORKER'S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) Pursuant to Section 1861 of the Labor Code, the BIDDER, in submitting his/her PROPOSAL, shall sign the following certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for tivorkers" compensation or to undertake self- insurance in accordance with theovisioras,ofihat code, and I will comply with such provisions before commencing tVe forrnaiice of the work of this Contract." Signature of Bidder: Title: President Business Name: Pacific Tennis Courts, Inc. Business Address: 530 Los Anqeles Ave., Suite 115-320 Moorpark, CA 93021 Telephone Number: 818 991-7445 Dated this 31st day of August .2o 20. I -C-10 Agreement No. 5975 BIDDER'S CERTIFICATION OF SUBCONTRACTORS ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: 19-03 Company Name: Pacific Tennis Courts. Inc. As detailed in Section 2-3.1 (Page II -B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. __............................ ................................. ,,.__._" ....... � Subcontractor's Description of Contractor License Portion of Name of No. & DIR Work Estimated Subcontractor Address Registration No. Subcontracted $ Amount _ u _. ......... . (Number and Street) (CSLB #) (City, Zip Code) (DIR#) (MakeLigniature es f4his page if additional space is needed) Aug 31, 2020 of Bidder Date I -C- I I Agreement No. 5975 REFERENCES Company Name: Pacific Tennis Courts, Inc. The following are the names, addresses, and telephone numbers for public agencies for which BIDDER has performed similar work as the prime Contractor or major Subcontractor within the past five (5) years: a. Project Title: See attached reference list Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $._.................... Date completed: Amount of work done by my/our firm under Contract $ Did your firm have any financial interest in Project? 2. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $........ Date completed: Amount of work done by my/our firm under Contract $..... ............... Did your firm have any financial interest in Project? I -C-12 Agreement No. 5975 I Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: Date completed: Amount of work done by my/our firm under Contract $ __ITITIT__ Did your firm have any financial interest in Project? 4, Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under Contract $ Did your firm have any financial interest in Project? I -C-13 Agreement No. 5975 5, Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under Contract $ Did your firm have any financial interest in Project? _,_,_ Bidder may attach additional reference pages if necessary. The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance bonds: ��s�� ������*�'G,�' %3 a.-Y®r _ j�,►�t2[ iia'>f ...................... _11.11. ............... .......... I -C-14 Agreement No. 5975 BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Company Name: Pacific Tennis Courts, Inc. Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation. 1. Have you ever been disqualified from any government Contract? Yes ❑ No IR 2. If yes, explain the circumstances: 3. Are you registered in accordance with Labor Code § 1725.5 [Note: failure to register requires the City to reject your bid as nonresponsive]? Yes No ❑ Bidder's Signature Phil Carter, Pacific Tennis Courts, Inc. Name (Please Print) I -C-15 Agreement No. 5975 INSURANCE REQUIREMENTS [MUST BE SUBMITTED WITH PROJECT PROPOSAL] ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Company Name: Pacific Tennis Courts, Inc. To be awarded this Contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: "1"vee of Insurance Limits, Commercial general liability: $2,000,000 Business automobile liability: $1,000,000 Workers compensation: Statutory requirement Commercial general liability insurance must meet or exceed the requirements of ISO -CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name the City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance must be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to the City. Insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by Contractor for the City. Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 0106 92, including symbol 1 (Any Auto). The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A: VII." Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. The City requires Cali fornia Worker's Compensation Coverage with the associated Waiver. Out-of-state coverage will not be accepted in lieu of the California coverage, because the work is being performed in the State of California. By signing this form, the bidder certifies that it has read, c�oadersta� """i tid comply with these insurance requirements if it is selected as the City's consultan&. �� t J yqy & tia� a r°mace will render the bidder's proposal "nonresponsive." August 31, 2020 Date I -C-16 Bidder's Signature Agreement No. 5975 END PROPOSAL SECTION I -C-17 August 6, 2020 Agreement No. 5975 ADDENDUM NO. 1 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for ROLLER HOCKEY RINK IMPROVEMENTS PROJECT PROJECT NO. PW 19-13 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time has changed to Tuesday, September 1, 2020, at 11:00 am. 2. Please use the attached revised bid sheet for bidding and replace Section IV - Measurement and Payment in its entirety with the attached revised Section IV of the Project Specifications. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided and subs it this Addendum with the Bid Proposal. Failure to provide such acknowledger', ent shy render the bid as non-responsive and subject to rejection. Signature: Date: August 31. 2020 Print Company Name: Pacific Tennis Courts, Inc. 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Agreement No. 5975 PACIFIC TENNIS COURTS, INC. 530 LOS ANGELES AVE., STE. 115-320 MOORPARK, CA 93021 818-707-3797 818-706-1951 FAX References 1. City of Fountain Valley 10200 Slater Ave. Fountain Valley, CA 92708 Contact: John Nguyen (Assistant Engineer) Phone (714) 593-4443 john.nguyen@fountainvalley.org Project Name: La Capilla Park Basketball Courts Improvements Project Location: La Capilla Park Scope of Work: New Basketball Courts, Including Walkways, Sidewalks, Project Location: & Curb Ramps. Project Value: $ 138,001.00 Completion: 10/08/2015 2. City of Coronado 1825 Strand Way Coronado, CA 92118 Contact: Katie Odiorne (Project Engineer) Phone (619) 522-2424 kodiorne@coronado.ca.us Project Name: Tennis Court Repair Project Project Location: Various Locations, Coronado, CA Scope of Work: Sixteen (16) Tennis Courts Project Value: $170,913.00 Completion: 09/10/2015 3. Palm Springs Unified School District 980 E. Tahquitz Canyon Way Palm Springs, CA 92262 Contact: Michael Hoch (Sr. Project Manager) Phone (760) 238-6090 Office (949) 212-3523 Email: michaelh@anotherperspectiveinc.com Project Name: 2015 Tennis Court Resurfacing Project Project Location: Cathedral High School, Palm Springs High School, & Desert Hot Springs High School Scope of Work: Thirteen (13) Tennis Court Project Value: $ 91,901.00 Completion: 07/30/2015 CONTRACTORS LICENSE NUMBER: CALIFORNIA: 980738 Agreement No. 5975 PACIFIC TENNIS COURTS, INC. 530 LOS ANGELES AVE., STE. 115-320 MOORPARK, CA 93021 818-707-3797 818-706-1951 FAX 4. City of Mission Viejo 27204 La Paz Road Mission Viejo, CA 92692 Contact: Jerry Hill (949) 470-3085 jhill@cityofmissionviejo.org Project Name: Bocce Ball Courts at Oso Viejo Community Park Project Location: Oso Viejo Community Park Scope of Work: Bocce Ball Courts, including Irrigation System, Landscape, and other site work Value: $ 174,388.00 Completion: 1/25/2016 5. Grossmont Union High School District Post Office Box 1043 La Mesa, CA 91944 Contact: John Foster (619) 572-6417 Jmfoster@sundt.com Project Name: Granite Hills Tennis/Basketball Court Repair, CN -352 Project Location: Granite Hills High School, La Mesa, CA Scope of Work: Repair and Resurface Twelve (12) Tennis Courts and Four (4) Basketball Courts Value: $ 222,222.00 Completion: 1/25/2016 6. Bel Air Bay Club 16801 Pacific Coast Highway Pacific Palisades, CA 90272 Contact: Brennan Cassidy Phone (310) 230-4773 bcassidy@belairbayclub.com Project Name: Paddle Tennis Courts Repair Project Location: Bel Air Bay Club Scope of Work: Repair and Resurface Seven (7) Paddle Tennis Courts Value: $ 29,500.00 Completion: 11/2015 7. City of Avalon 410 Avalon Canyon Road Avalon, CA 90704 Contact: Dan Huncke (310) 912-0447 dhuncke@cityofavalon.com Project Name: Avalon Canyon Fit Trail Project Project Location: Across the street from City Hall 410 Avalon Canyon Road Scope of Work: Install fitness zone Project Value: $229,922.00 Completion: 12/2016 CONTRACTORS LICENSE NUMBER: CALIFORNIA: 980738 Agreement No. 5975 PACIFIC TENNIS COURTS, INC. 530 LOS ANGELES AVE., STE. 115-320 MOORPARK, CA 93021 818-707-3797 818-706-1951 FAX 8. Disneyland Subcontractor for Mission Paving and Sealing, Inc. 1580 S. Disneyland Drive Anaheim, CA 92802 Contact: Mike Miller @ Mission Paving Project Name: Office (626) 452-8200 Cell 626-831-4343 Project Location: Email: mike@missionpaving.com Project Name: Avalon Canyon Fit Trail Project Project Location: Pinocchio Parking Lot Disneyland Scope of Work: Color coating of asphalt Project Value: $40,000.00 Completion: 12/8/2016 9. City of Santa Ana 20 Civic Center Plaza Post Office Box 1988 Santa Ana, CA 92702 Contact: Michael Ortiz, Construction Manager Office (714) 647-5624 Cell (714) 615-0892 Email: mortiz@santa-ana.org Project Name: Riverview, Cabrillo & Windsor Court Resurfacing Project Location: Above three parks in City of Santa Ana Scope of Work: Color coating, new courts, and site work Project Value: $287,417.00 Completion: 01/2017 10. Fritz Burns Park 78107 Avenue 52 La Quinta, CA 92253 Contact: L. R. St. Sauver (760) 777-7048 (C) (760)275-2143 Project Name: Fritz Burns Park- Tennis & Pickleball Court Conversion Project Location: Fritz Buns Park 78100 Francis Hack Ln. La Quinta Scope of Work: Create (2) two full size tennis courts. Convert (1) tennis court into (4) pickleball courts. Resurface/strip (5) tennis courts Project Value: $366,882.44 Completion: 11/2017 CONTRACTORS LICENSE NUMBER: CALIFORNIA: 980738 Agreement No. 5975 PACIFIC TENNIS COURTS, INC. 530 LOS ANGELES AVE., STE. 115-320 MOORPARK, CA 93021 818-707-3797 818-706-1951 FAX 11. Compton USD 429 Oleander St. Compton, CA 90220 Contact: Antonio Villarruel (818) 756-0425 Project Name: New Tennis Court Improvements Centennial High School Project Location: 2602 N. Central Ave. Compton, CA Scope of Work: Install chain link fence & gates. Bleachers. Joint sealants. Playfield equipment. Project Value: $723,039.30 Completion: 11/2017 12. Resource Conservation District of the Santa Monica Mountains 540 South Topanga Canyon Blvd. Topanga, CA 90290 Contact: Mark Abramson (310) 490-0279 Project Name: Construction of Liberty Canyon Wildlife Passage Project Santa Monica, CA Project Location: Liberty Canyon, Agoura Hills Scope of Work: Remove existing fence. Install reclaimed water main line. Install inline drip irrigation. Install step pool. Project Value: $425,500.00 Completion: 11/2017 13. Rancho Simi Community Park Pickleball Court Project 1765 Royal Ave. Simi Valley, CA 93065 Contact: Tom Evans (805) 584-4422 Project Name: Rancho Simi Community Park Pickleball Court Project Project Location: Simi Valley, CA Scope of Work: Tennis Court to Pickleball conversion (8 courts) Project Value: $125,000.00 Completion: 5/2018 14.Sport Court Resurfacing City of Ontario 303 East "B" Street Ontario, CA 91764-4196 Contact: Roberto Perez (909) 395-2627 Project Name: Sport Court Resurfacing City of Ontario Project Location: Bon View Park Ontario, CA. Centennial Park Ontario, Ca. Creekside Park Ontario, Ca, Scope of Work: Resurface repair (5) five tennis courts Project Value: $25,200.00 Completion: 11/2017 CONTRACTORS LICENSE NUMBER: CALIFORNIA: 980738 Agreement No. 5975 PACIFIC TENNIS COURT9, INC. 530 LOS ANGELES AVE., STE. 115-320 MOORPARK, CA 93021 818-707-3797 818-706-1951 FAX 15. City of Santa Ana 20 Civic Center Plaza Post Office Box 1988 Santa Ana, CA 92702 Contact: Michael Ortiz, Construction Manager Office (714) 647-5624 Cell (714) 615-0892 Email: mortiz@santa-ana.org Project Name: Riverview, Cabrillo & Windsor Court Resurfacing Project Location: Above three parks in City of Santa Ana Scope of Work: Color coating, new courts, and site work Project Value: $287,417.00 Completion: 01/2017 16.Griffin Club Los Angeles 3084 Motor Ave. Los Angeles, CA 90064 Contact: John Myers (310) 558-6420 Email: jmyers@griffinclubla.com Project Name: Resurfacing and Fencing Project Location: 3084 Motor Ave. Los Angeles, CA 90064 Scope of Work: Resurfacing of 3 tennis courts, fencing, and windscreens Project Value: $26,000 Completion: 05/2018 17. City of Palm Desert 73-510 Fred Waring Drive Palm Desert, CA 92260 Contact: Diane Hollinger (760) 776-6444 Email: dhollinger@cityofpalmdesert.org Project Name: 2016 Basketball Court Resurfacing Project Location: Freedom Park — 77-400 Country Club Dr, Palm Desert Civic Center Park — 73-510 Fred Waring Dr. Palm Desert Scope of Work: Resurfacing, Color Coating, Site Work Project Value: $63,333 Completion: 07/2016 18. Compton USD 501 S. Santa Fe Ave. Compton, CA 90221 Contact: Antonio Villarruel (818) 756-0425 Project Name: New Tennis Courts at Dominguez High School Project Location: Dominguez High School — 15301 S. San Jose Ave. Compton, CA 90221 Scope of Work: Pour and surface 8 new tennis courts, fencing, site work. Project Value: $1,195,000.00 Completion: 03/2019 CONTRACTORS LICENSE NUMBER: CALIFORNIA: 980738 Agreement No. 5975 PACIFIC TENNIS COURTS, INC. 530 LOS ANGELES AVE., STE. 115-320 MOORPARK, CA 93021 818-707-3797 818-706-1951 FAX 19. City of Bakersfield 1600 Truxton Ave. Bakersfield, CA 93301 Contact: Fidel Gonzalez — 661-326-3268 Project Name: Jefferson Park Basketball Court Project Location: Jefferson Park — 801 Jefferson St. Bakersfield, CA 93301 Scope of Work: Pour and surface new basketball court, site work. Project Value: $378,414.00 Completion: 04/2019 20.County of Ventura Public Works — Hall of Administration L #1600 800 S. Victoria Ave. Ventura, CA 93009 Palmdale, CA 93550 Contact: Salvador Diaz -Ruben 805-650-4066 Project Name: Salvador.diazruben@ventura.org Project Name: Kadota Fig Maintenance Access Improvements Project Location: Simi Valley, CA Scope of Work: Repair of damaged storm drain channel. Excavate old Completion: channel and reconstructed concrete water diversion. Project Value: $ 128,607.00 Completion: 08/2019 21. City of Palmdale Department of Public Works 38250 Sierra Hwy Palmdale, CA 93550 Contact: Lynn Glidden 661-267-5315 glidden@cityofpalmdale.org Project Name: Paloma Vista Fitness Park Project Location: Palmdale Scope of Work: Installation of fitness equipment and rubber surfacing. . Project Value: $ 107,035.47 Completion: 06/2019 22. County of Los Angeles P.O. Box 866001 Los Angeles, CA 90086 Contact: Linda Zhang 323-409-3359 Izhang@isd.lacounty.gov Project Name: LAC+USC Healthcare / LAC+USC Medical Center Project Location: Los Angeles Scope of Work: Installation of pour in place rubber safety surface Project Value: $ 72,762.50 Completion: 07/2019 CONTRACTORS LICENSE NUMBER: CALIFORNIA: 980738 FAITHFUL PERFORMANCE BOND ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Pacific Tennis Courts. Inc. and Merchants Bonding Companv (Mutual) Agreement No. 5975 Bond No. CAC719307 Premium: $3,352.00 Subject to Change Based on final Contract Price. ("PRINCIPAL") , a corporation incorporated under the laws of the State of Iowa and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of One Hundred Thirty I�otat- "Thousand. Seventv ($134,070.00) lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, SPECIFICATIONS NO. PW 19-13, and the public works contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS I. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 19-13, a copy of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING FILE NO. PW 19-13) which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. CITY has estimated the required amount of the bond as shown above. 2. PRINCIPAL's work on the Public Project will be done in accordance with CITY's plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor. 3. PRINCIPAL will guarantee its work against any defective work, labor, or materials on the Public Project for a period of one (1) year following the Public Project's completion and acceptance by CITY. I -E-1 Agreement No. 5975 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 19-13 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -E-2 SIGN �F A 1AD S E�Al, F, �Dc. -i i s 10th day of Flacifi, n S, In , Inc. I)RINUVI-YAL's PRESIDENT -- PR13CIPAL's SECRETARY PRINCIPAL's MAILING ADDRESS: Agreement No. 5975 November r 20 20 —, Merchai)ts Bonding Company (MU, tLI, al) ,pal G 0 Erik Jo iansson, Attomey-in-Fact - ID - 1933 .............. Melissa Lopez, i n S SURETY'S MAILING ADDRESS: 530 Los Angeles Avenue, Suite 115-320 P.O Box 14498, Moorpark, CA 93021 Des Moines, IA 50306-3498 ............... NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. I -E-3 Agreement No. 5975 CALIFORNIA ALL PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that V document. ,STATE OF CALIFORNIA;} COUNTY OF Orange wIOn "Jll , before me, Trances Lefler Notary j 1 Public, (here inert name and title of the officer) personally appeared Erik Johansson who proved to me on the basis of satisfactory evidence to be the person(s) whose name(q) is/s-Fe (subscribed to the within instrument and acknowledged to me that he/shefNtey executed the same in hist authorized capacity(ia&), and that by his/heAghok signature( -t) on the instrument the person(r4, or the entity upon behalf of which the person(-&) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the jforeg,oing paragraph is true and correct. WITNESS my hand and official seal., Of x„� FRANCES LEFLER COMM. # 2325424 ;0 a ° NOTARY PUBLIC•CAUFORNIA N ORANGE COUNTY N MY COMM. EXP, APRIL 23„ 20 Y � i�wi" ♦r r iIii Y +w i. r s. uM Signature: > OPTIONAL ';Description of Attached Document Title or Type of Document: Number of Pages: u_ Document Date: Other: M 4.,1w?I �� �.,_. .,;�.I.:.. iwll„ E Agreement No. 5975 BONDING COMPANY,. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Erik Johansson; Frances Lefler; James W Johnson; Jennifer Anaya; Jessica Hollaender; Melissa Lopez their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power-0f-Attomey is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Atto meys-in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 11th day of February 2020 www www." o. .1 « " ". •..".'„l.” MERCHANTS BONDING COMPANY (MUTUAL) PO+'" MERCHANT NATIONAL BONDING„(INC.. Zo 2003 a * 1933 r' By ««.yF ^ . s *^^1�Mw «^ p� „j exp Pn M.si eld STATE OF IOWA °"wwwwwwwwwwww� °1fM«l i * M «M COUNTY OF DALLAS ss. On this 11th day of February 2020 before me appeared Larry Taylor, to me personally known, who being by me duly swom did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. »"� POLLY MASON 0 Commission Number750576A�� " ° My Commission Expires « /0� « January 07, 2023 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -0F -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 10th day of November . 2020 ♦ ♦ W M^k�C1i'w''1P� )0 • V) 0 y� �� ”_VM � y'�y Le - Q f,,'�Yp��W� ie 'ye>r ' r G -0— 0 b6 '"^w ��✓� AS,v� �w//I� —' •• e• Yp n 2103 ., Secretafy POA 0018 (1/20) Agreement No. 5975 No. 2482-8 STATE OF CALIFORNIA DEPARTMENT OF INSURANCE SAN FRANCISCO Amended Certificate of Authority THIS IS TO CERTIFY that, pursuant to the Insurance Code of the State of California, Merchants Bonding Company (Mutual) of Iowa, organized under the laws of Iowa, subject to its Articles of Incorporation or other fundamental organizational documents, is hereby authorized to transact within this State, subject to all provisions of this Certificate, the following classes of insurance: Surety, Liability, and Miscellaneous as such classes are now or may hereafter be defined in the Insurance Laws of the State of California. THIS CERTIFICATE is expressly conditioned upon the holder hereof now and hereafter being in full compliance with all, and not in violation of any, of the applicable laws and lam ful requirements made under authority of the laws of the State of California as long as such laws or requirements are in effect and applicable, and as such laws and requirements now are, or may hereafter be changed or amended4 / IN WITNESS WHEREOF, effective as of the Is' day of October, 2015, 1 have hereunto set my hand and caused my official seal to be affixed this I" day of October, 2015. Dave Jones Insurance Commissioner By Valerie Sarfaty for Nettie Hoge Chief Deputy NOTICE: Qualification with the Secretary of State must be accomplished as required by the California Corporations Code promptly after issuance of this Certificate of Authority. Failure to do so will be a violation oflnsurance Code section 701 and will be grounds for revoking this Certificate of Authority pursuant to the covenants made in the application therefor and the conditions contained herein, Agreement No. 5975 IF lemmmu K a 13F AA I W&I W MERCHANTS BONDING COMPANY (MUTUAL) - P.O. BOX 14498 - DES MOINES, IOWA 50306-3498 PHONE: (800) 678-8171 ® FAX: (515) 243-3854 ADDENDUM TO BOND This Addendum is in reference to the bond(s) to which it is attached. Merchants Bonding Company (Mutual) ("Merchants") deems the digital or electronic image of Merchants' corporate seal below affixed to the bond(s) to the same extent as if a raised corporate seal was physically stamped or impressed upon the bond(s). The digital or electronic seal below shall have the same force and effect as though manually fixed to the bond(s). All terms of the bond(s) remain the same. Signed and effective March 23, 2020. MERCHANTS BONDING COMPANY (MUTUAL) . '. * 0 0.. o .* G 'tk cNf 1933 By: Larry Taylor, President Aareement No,5p7. a,,,,,,,,,,,,,,,.,,,,,:,, ..... A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. ..... CALIFORNIA JURAT State of California County of Ve'A 1 o .............. . - Subscribed and sworn to (or affirmed) before me on this d / day ................ of DI 20 2-4:,; by i Li I C- o ...................... . ............ . . ............... proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.%00Ek % I I I '1 1, e, R 6 qNN 19 7 5 3'2'4fJN' of PU'6 ate0 INA r OL ft C 41F0 U co ra Signature XP 11111V (Seal) OPTIONAL INFORMATION Although the information in this section is not required by low, it could prevent fraudulent removal and reattachment of this jurat urot to an unauthorized document and may prove useful to persons relying on the attached document. Description of Attached Document This certificate is attached to a document titled/for the purpose of .......... . '�C-11 1-10, containing pages, and dated NOW Method of Affiant Identification Proved to me on the basis of satisfactory evidence: L 0 form(s) of identification 0 credible witness(es) Notarial event is detailed in notary journal on: Page # Entry # Notary contact: Other F-1 Affiant(s)Thumbprint(s) F-1 Describe: LABOR AND MATERIALS BOND ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Agreement No. 5975 Bond No. CAC719307 Premium Included in Cost of Performance Bond. Pacific Tennis Courts. Inc. z as principal ("PRINCIPAL') and Merchants Bonding Company (Mutual) , a corporation incorporated under the laws of the State of Iowa and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of One .l~lttndred Thi illy FOUr Thousand, Seventy ($134,070.00) , lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. This bond is conditioned upon and guarantees payment by PRINCIPAL to contractors, subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL'S subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in ROLLER HOCKEY RINK IMPROVEMENTS, SPECIFICATIONS NO. PW 19-13 ("Public Project"), the public works contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 19-13, and the public works contract executed for such Specifications, copies of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING FILE NO. PW 19-13), which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. 2. PRINCIPAL will pay all contractors, subcontractors, and persons renting equipment. 3. PRINCIPAL will pay for all materials and other supplies, for equipment used in, on, for or about the performance of the Public Project, and will pay for all work and labor I -F-1 Agreement No. 5975 thereon. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 19-13, or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted. 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -F-2 SK)N "1. . D SEA this Pacil cLeann Inc. AL" ENT NCIPAL'S SECRETARY li 0th day of November PRINCIPAL's MAILING ADDRESS: Agreement No. 5975 . 20 20 Merchanty Bonding Company (Mutual) • ; '00 cod Eril, Jol nssojn, Attorney -in -Fact.'"" ` « 1933 Melissa Lopez, '11, ss •* « ."•' •• SURETY's MAILING ADDRESS: 530 Los Angeles Avenue, Suite 115-320 P.O Box 14498, Moorpark, CA 93021 Des Moines, IA 50306-3498 ............... ... .................................................................................................. NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job I -F-3 Agreement No. 5975 CALIFORNIA ALL PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. i ;STATE OF CALIFORNIA COUNTY OF Orange On &1VW X - ) Oil before me, Frances Lefler Notary Public, (here insert name and title of the officer) personally appeared Erik Johansson who proved to me on the basis of satisfactory evidence to be the person(s) whose name(q) is/;afe subscribed to the within instrument and acknowledged to me that he/she/they executed the same jin his/fir authorized capacity(ias.), and that by hist signature(*) on the instrument fthe person(&}, or the entity upon behalf of which the person(&) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the aforegoing paragraph is true and correct. WITNESS my hand and official seal. A �s ar r FRANCES LEFLER " COMM. # 2325424 NOTARY PUBLIC -CALIFORNIA Cl) '* ORANGE COUNTY 'MY COMM. EXP, APRIL 23, 2024 Signature: (Seal.) OPTIONAL e . (Description of Attached Document Title or Type of Document: Document Date: Other: �9ti{"". ,�.�,:��{111 :�. ".'rm9�,N �. ���!`. �","•"-�,`'�`"I, �+�°��'.wh,?i'. � „'�,Bbl.�;'�I N1��i,,'�.�y'9 �'"t,,N� p�.n�°w� .�,,,,,..... r Number of Pages: Agreement No. 5975 MERCHANT'S'%k BONDING COMPANY, POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Erik Johansson; Frances Lefler; James W Johnson; Jennifer Anaya; Jessica Hollaender; Melissa Lopez their true and lawful Attorneys) -in -Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power-of-Attomey is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attomeys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. Nn Witness Whereof„ the C'ompan'ies have caused this instrument to be signed and sealed this 11th day of February 2020 �W,p�p,M Y4,^wM, wfMyl lMsp* *yM%,•�,a•' Co ov Pygr?9 " *nwwrA:^1Y',0"„1r•,, MERCHANTS BONDING COMPANY (MUTUAL) 4 MERCHANT NATIONAL BONDING, INC.. 003 1933 By • "r''° "": Nµ� •.",pliyi°"°r e '' �• President STATE OF IOWA"�"*Trau*aw"' a�•wrawr COUNTY OF DALLAS ss. On this 11th day of February 2020 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. elAt , POLLY MASON 01 Commission Number 750576 a ° � 9My Commission Expires p ,o,y* January 07, 2023 ! Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In WOness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 10th day of November 1 2020 *,o' " pLP0R`" V 'T�rIM'»©; M P0 .' s�,,q"°gip"« !A/ wypr,1A Ch _ - a " 2'I() °. 1933 Secretary #`"rr.,.ur:%w.W+�""*"" POA 0018 (1/20) ''•`!" � „�"� � � . Agreement No. 5975 No. 2482-8 STATE OF CALIFORNIA DEPARTMENT OF INSURANCE SAN FRANCISCO Amended Certificate of Authority THIS IS TO CERTIFY that, pursuant to the Insurance Code of the State of California, Merchants Bonding Company (Mutual) of Iowa, organized under the laws of Iowa, subject to its Articles of Incorporation or other fundamental organizational documents, is hereby authorized to transact within this State, subject to all provisions of this Certificate, the following classes of insurance: Surety, Liability, and Miscellaneous as such classes are now or may hereafter be defined in the Insurance Laws of the State of California. THIS CERTIFICATE is expressly conditioned upon the holder hereof now and hereafter being in full compliance with all, and not in violation of any, of the applicable laws and lawful requirements made under authority of the laws of the State of California as long as such laws or requirements are in effect and applicable, and as such laws and requirements now are, or may hereafter be changed or amended. IN WITNESS WHEREOF, effective as of the Is` day of October, 2015, I have hereunto set my hand and caused my official seal to be affixed this I" day of October, 2015. Dave Jones Insurance Commissioner r ry �h By Valerie Sarfaty for Nettie Hoge Chief Deputy NOTICE: Qualification with the Secretary of State must be accomplished as required by the California Corporations Code promptly after issuance ofthis Certificate of Authority. Failure to do so will be a violation of Insurance Code section 701 and will be grounds for revoking this Certificate of Authority pursuant to the covenants made in the application therefor and the conditions contained herein. Agreement No. 5975 '4" MERCHANTS� BONDING COMPANY, - MERCHANTS BONDING COMPANY (MUTUAL) - P.O. BOX 14498 - DES MOINES, IOWA 50306-3498 PHONE: (800) 678-8171 - FAX: (515) 243-3854 ADDENDUM TO BOND This Addendum is in reference to the bond(s) to which it is attached. Merchants Bonding Company (Mutual) ("Merchants") deems the digital or electronic image of Merchants' corporate seal below affixed to the bond(s) to the same extent as if a raised corporate seal was physically stamped or impressed upon the bond(s). The digital or electronic seal below shall have the same force and effect as though manually fixed to the bond(s). All terms of the bond(s) remain the same. Signed and effective March 23, 2020. MERCHANTS BONDING COMPANY (MUTUAL) By: 7 7- Lar7� ry idezit Agreement No. 5975 -i�he f3ublic or otl-wr officer conipledrig this certificate verifies only fic -erti c.] identity of the indiOdual who signed the Jocument to which this c te at t. is attached, and riot the truthfulness, accuracy, orvaliclity of that clocumen . . . ............. "'I'll -111- CALIFORMA JURAT State of California Co u n.ty of Subscribed and sworn to (or affirmed) before me on this . ......... i'.0 _112_ day k of............................. ............ . 20 2=s�— , by .......... . .... V . ................................ "' proved to me on the basis of satisfactory evidence to be the person (s) who appeared before me. Signature OPTIONAL INFORMATION pADER k % X\ 197532' 0"ar Y P4/,6 0 44 IF0 Co. A f 11 ( al) Although the information in this section is not required by law, it could prevent fraudulent removal and reattachment of this jurat to an unauthorized document and may prove useful to persons relying on the attached document. Description of Attached Document This certificate is attached to a document titled/for the purpose of L a bUy C 04�e4^VVS pages, and dated Method of Affiant Identification Proved to me on the basis of satisfactory evidence: —0 form(s) of identification 0 credible witness(es) Notarial event is detailed in notary journal on: Page # Entry # pM Notary contact: Other Affiant(s)Thumbprint(s) F-] Describe: @Copyright 2007-2014 Notary Rotary, Inc PO Box 41400, Des Moines, 1 A 5031 T-0507. A I I Rights Reserved Item Number 101884 Plea 5e contact your Authorized Rese I I er to purchase copies of this form Agreement No. 5975 Change Order City of El Segundo, Public Works Department Permit No.: Plan No.(S): Project Number:I Change Order No.: 1 PW 19-13 Contractor Name: Pacific Tennis Courts, Inc. Contractor Address: 530 Los Angeles Ave., Suite 115-320 Moorpark, CA 93021 Contractor Phone. (818) 991-7445 Contract No.: File Reference: NA Project Manager Name: Arianne Bola Project Manager Phone: (310) 524-2364 Inspector Name: Arianne Bola Phone: (310) 524-2364 Contract Description: Roller Hockey Rink Improvements Project Description of Changes: All additional labor, material, and work necessary, beyond original scope of work, to: I . Delete the following items from the bid: a. Bid Item 6: Removed and reconstruct 6" concrete slab with footing and reinforcement steel (-$23,700) b. Bid Item 7: Install 2' deep section of crushed miscellaneous base (CMB) (-$11,850) c. Bid Item 8: Remove and reconstruct 4" thick concrete walkway (-$13,200) d. Bid Item 9: Install 4" subdrain perforated pipe (-$13,640) e. Bid Item 10: Install 6" PVC pipe (schedule 35) (-$3,150) f. Bid Item 11: Connect proposed drainage system to existing catch basin (-$4,500) Method of Payment (May Be Combination): ® Contract Unit Prices ❑ Contractor's Quote (see attached) ❑ Time & Materials (Estimated)* REVISED CONTRACT COSTS: REVISED CONTRACT TIMELINE: Original Contract Cost: $204,110.00 Previous Changes: $0.00 Additions/ Deletions to Bid Items Per this CO: -$70,040.00 New Contract Cost: $134,070.00 % Above Original Contract Cost: 0% CITY OF EL SEGUNDO Approved By:' Jj"AQ-- Original Start Date: Original Working Days: 30 Previous Working Days Changes: 0 Current CO Working Days Change: New Total Working Days: New Completion Date: Date: 101,211110 Note: This Change Order is Effective on the date signed by the City Representative. Notify the Project Engineer immediately if there is any disagreement. The Change Order costs indicated on this form represent the complete cost to perform the noted work. No other incidental or related costs are due or will be claimed by the contractor for this item of work without the express written approval from the City. Received: Phil Carter, President /0" r,�i1. 10/20/2020 Print Contractor Name and Title Signature Date Agreement No. 5975 ! 1i CONTRACT DOCUMENTS PLANS & SPECIFICATIONS FOR ROLLER HOCKEY RIND IMPROVEMENTS PROJECT NO.: PW 19-13 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 350 MAIN STREET EL SEGUNDO, CA 90245 310-524-2300 http s://www. elsegundo. org/government/departments/city-clerk/bid-rfp MANDATORY PRE-BID MEETING TUESDAY, AUGUST 4, 2020 AT 9:00 AM AT RECREATION AND PARKS ROLLER HOCKEY RINK 401 SHELDON ST. (END OF CUL-DE-SAC ON SHELDON ST. NORTH OF GRAND AVE.) EL SEGUNDO, CA 90245 BIDS DUE TUESDAY, AUGUST 25, 2020 AT 11:00 AM Agreement No. 5975 BIDS WILL BE RECEIVED UP TO THE HOUR OF 11:00 A.M. TUESDAY, AUGUST 25, 2020 IN THE OFFICE OF THE CITY CLERK CITY HALL 350 MAIN STREET EL SEGUNDO, CALIFORNIA 90245 AT WHICH TIME THEY WILL BE PUBLICLY OPENED 2 Agreement No. 5975 SPECIAL INSTRUCTIONS TO CONTRACTORS Contractors are required to review section 7-3 of the STANDARD SPECIFICATIONS, pages II -B-22 thru II -B-25 "LIABILITY INSURANCE". ONLY CONTRACTORS ABLE TO OBTAIN AND FURNISH THE REQUIRED COVERAGE AND ENDORSEMENT "ISO" FORMS SHOULD CONSIDER SUBMITTING A BID PACKAGE. The Contractor will be required to apply and obtain an Encroachment Permit from the City Public Works Department as well as any applicable Building/Safety Permit from the City Building Planning and Building Safety Department. The permits will be issued on a "no -fee" basis. The Contractor shall be responsible for calling the Building Safety Division for inspections. All noted deficiencies shall be corrected by the Contractor. The project will not be accepted as complete until the Contractor obtains a final sign -off from the Department of Planning and Building Safety. Agreement No. 5975 TABLE OF CONTENTS SECTION I — LEGAL A. NOTICE INVITING SEALED BIDS B. BIDDING INSTRUCTIONS I. DEFINITIONS 2. BIDDER'S REPRESENTATIONS 3. BIDDING DOCUMENTS 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS 5. PRODUCT SUBSTITUTIONS 6. SUBCONTRACTORS T ADDENDA 8. PRE-BID CONFERENCE 9. FORM AND STYLE OF BIDS 10. BID SECURITY 11. MODIFICATION OR WITHDRAWAL OF BID 12. OPENING OF BIDS 13. REJECTION OF BIDS 14. AWARD C. PROPOSAL 1. PROPOSAL, FIRST PAGE 2. BID SCHEDULES a. BASE BID ITEMS 3. BIDDER'S INFORMATION 4. BIDDER AND NOTARIAL ACKNOWLEDGEMENT 5. PROPOSAL GUARANTEE BID BOND 6. CONTRACTOR'S LICENSE DECLARATION 7. NON -COLLUSION AFFIDAVIT 8. WORKER'S COMPENSATION CERTIFICATION 9. DESIGNATION OF SUBCONTRACTORS 10. REFERENCES 11. BIDDER'S STATEMENT OF PAST DISQUALIFICATIONS 11. INSURANCE REQUIREMENTS D. CITY OF EL SEGUNDO PUBLIC WORKS CONTRACT E. FAITHFUL PERFORMANCE BOND PAGE I -A- I TO A-3 I -B-1 TO B-8 I -B-1 I -B-1 I -B-2 I -B-2 I -B-3 I -B-3 I -B-3 I -B-3 I -B-4 I -B-5 I -B-6 I -B-6 I -B-6 I -B-6 to 8 I -C-1 TO C-17 I -C -3a I -C-4 I -C-6 I -C-7 I -C-8 I -C-9 I -C-10 I -C-11 I -C-12 I -C-15 I -C-16 I -D-1 TO D-5 I -E-1 TO E-3 F. MATERIAL AND LABOR BOND I -F -I TO F-3 Agreement No. 5975 SECTION II — GENERAL REQUIREMENTS PAGE A. GENERAL SPECIFICATIONS II -A -I TO A-2 1. REGISTRATION OF CONTRACTORS II -A-1 2. INSURANCE AND CITY BUSINESS LICENSE II -A-1 3. EMERGENCY INFORMATION II -A-1 4. FURNISHING OF WATER II -A-1 5. CALIFORNIA — OCCUPATIONAL SAFETY II -B-1 1-3 AND HEALTH ADMINISTRATION II -A-1 6. SOUND CONTROL II -A-1 7. AIR POLLUTION CONTROL II -A-2 8. WORKER UNIFORMS II -A-2 B. GENERAL PROVISIONS II -B-1 TO B-32 0-0 STANDARD SPECIFICATIONS II -B-1 0-1 GENERAL II -13-1 0-2 NUMBERING OF SECTIONS II -B-1 1-2 DEFINITIONS II -13-1 1-2.1 ADDITIONAL DEFINITIONS II -B-1 1-3 ABBREVIATIONS II -B-2 2-0 SCOPE AND CONTROL OF WORK II -B-2 2-1.1 ACCESS TO PROJECT SITE II -B-2 2-1.2 OWNERSHIP AND USE OF CONTRACT II -B-3 DOCUMENTS 2-3 SUBCONTRACTS II -B-3 2-3.1 GENERAL II -13-3 2-3.2 ADDITIONAL RESPONSIBILITY II -13-4 2-4 CONTRACT BONDS II -B-4 2-5 PLANS AND SPECIFICATIONS II -B-4 2-5.1 GENERAL II -13-4 2-5.2 PRECEDENCE OF CONTRACT DOCUMENTS II -B-5 2-5.5 ACCURACY OF PLANS AND SPECIFICATIONS II -B-5 2-8 RIGHT-OF-WAY II -B-6 2-8.1 ADDITIONAL WORK AREAS AND FACILITIES II -B-6 2-9 SURVEYING II -13-6 2-9.3 SURVEY SERVICE II -B-6 2-9.3.1 CONSTRUCTION SURVEYING II -B-6 2-9.3.2 MEASUREMENT AND PAYMENT II -13-6 3-3.2.2 BASIS FOR ESTABLISHING COSTS II -B-6 3-3.2.3 MARK UP II -B-7 W1 Agreement No. 5975 SECTION II — GENERAL REQUIREMENTS (Continued) PAGE 3-3.3 DAILY REPORTS BY CONTRACTOR II -B-7 3-4 CHANGED CONDITIONS II -B-7 3-5 DISPUTED WORK II -B-8 4-1.3 INSPECTION REQUIREMENTS II -B-9 4-1.3.1 GENERAL II -B-9 4-1.6 TRADE NAMES OR EQUALS II -B-9 5-2 PROTECTION II -B-10 5-2.1 INCORRECT LOCATION OF UTILITIES II -B-10 5-4 RELOCATION II -B-10 5-4.1 RESPONSIBILITY OF UTILITY REMOVAL II -B-10 OR RELOCATION 5-5 DELAYS II -B-10 5-5.1 CALCULATING IDLE TIME II -B-11 6-1 CONSTRUCTION SCHEDULE AND II -B-11 COMMENCEMENT OF WORK 6-1.1 CONTRACT SCHEDULE II -B-11 6-1.2 CONTENT OF CONTRACT SCHEDULE II -B-11 6-1.3 EFFECT OF CONTRACT SCHEDULE II -B-11 6-1.4 COMMENCEMENT OF CONTRACT TIME II -B-12 6-4 DEFAULT BY CONTRACTOR II -B-13 6-4.1 GENERAL II -B-13 6-4.2 TERMINATION OF CONTRACTOR'S II -B-13 CONTROL OVER THE WORK 6-4.3 SURETY'S ASSUMPTION OF CONTROL II -B-13 6-6 DELAYS AND EXTENSIONS OF TIME II -B-14 6-6.1 GENERAL II -B-14 6-6.2 EXTENSION OF TIME II -B-14 6-6.3 PAYMENT FOR DELAYS TO CONTRACTOR II -B-15 6-6.4 WRITTEN NOTICE AND REPORT II -B-15 6-7.2 WORK DAYS AND WORKING HOURS II -B-15 6-7.4 NIGHT WORK II -B-16 6-7.5 WEEKEND AND HOLIDAY WORK II -B-16 6-8 COMPLETION AND ACCEPTANCE II -B-16 6-8.1 GENERAL GUARANTY II -B-16 6-9 LIQUIDATED DAMAGES II -B-16 6-9.1 FAILURE TO COMPLETE WORK ON TIME 11-B-17 6-11 DISPUTES AND CLAIMS; PROCEDURE II -B-17 6-11.1 GENERAL II -B-17 6-11.2 FORM II -B-18 Agreement No. 5975 SECTION II — GENERAL REQUIREMENTS (Continued) 6-11.3 CLAIMS SUBMITTED TO ENGINEER 6-11.4 CLAIMS IS PREREQUISITE TO OTHER REMEDY 6-11.5 DECISION ON CLAIMS 6-11.6 APPEAL OF ENGINEER'S DECISION 6-11.7 MEDIATION 6-11.8 ARBITRATION 6-11.9 WHEN ARBITRATION DECISION BECOMES BINDING 6-11.10 APPEAL TO SUPERIOR COURT; WAIVER OF JURY TRIAL 6-11.10 AB 626 CLAIMS; PROCESS 7-2 LABOR 7-2.3 PREVAILING WAGES 7-2.4 RECORD OF WAGES PAID; INSPECTION 7-3 LIABILITY INSURANCE 7-3.1 GENERAL 7-3.2 INDEMNIFICATION AND DEFENSE 7-5 PERMITS 7-8.1 CLEAN UP AND DUST CONTROL 7-8.1.1 GENERAL 7-8.1.2 WATERING 7-8.6 WATER POLLUTION CONTROL 7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS 7-10 PUBLIC CONVENIENCE AND SAFETY 7-10.1 TRAFFIC AND ACCESS 7-10.2 STREET CLOSURES, DETOURS, BARRICADES 7-10.5 PROTECTION OF THE PUBLIC 7-15 HAZARDOUS MATERIAL 9-2 LUMP SUM WORK 9-3.2 PARTIAL AND FINAL PAYMENTS 9.3.3 DELIVERED MATERIALS 100-1 TERMINATION OF AGENCY LIABILITY iv PAGE II -B-19 II -B-19 II -B-19 II -B-20 II -B-21 II -13-21 II -B-21 II -B-21 II -B-21 II -B-22 II -B-22 II -B-23 II -B-23 II -B-23 II -B-26 II -B-26 II -B-27 II -B-27 II -B-27 II -B-27 II -B-28 II -B-28 II -B-28 1I -B-29 II -B-29 II -B-30 II -B-30 II -B-31 II -B-33 II -B-33 Agreement No. 5975 SECTION III — SPECIAL PROVISIONS PAGE 1-0 GENERAL SCOPE, TIME FOR COMPLETION 1-0. BASE BID ITEMS 2-0. PROGRESS PAYMENT SECTION V — TECHNICAL SPECIFICATIONS APPENDICES APPENDIX A: PROJECT PLANS APPENDIX B: AS -BUILT PLANS v IV -A-1 IV -A-3 AND LOCATION OF WORK III -A-1 2-0. NOTIFICATIONS III -A-1 3-0. MOBILIZATION III -A-2 4-0. WORK SCHEDULE III -A-4 5-0. STANDARDS III -A-4 6-0. EXAMINATION OF JOB SITE III -A-4 7-0. INSPECTION III -A-5 8-0. USE OF PRIVATE PROPERTY III -A-5 9-0. STORAGE OF MATERIALS AND EQUIPMENT III -A-5 10-0. DISPOSAL OF REMOVALS III -A-6 11-0. QUALITY ASSURANCE III -A-6 12-0. COMPLETION III -A-6 13-0. WARRANTY III -A-6 SECTION IV — MEASUREMENT AND PAYMENT PAGE 1-0. BASE BID ITEMS 2-0. PROGRESS PAYMENT SECTION V — TECHNICAL SPECIFICATIONS APPENDICES APPENDIX A: PROJECT PLANS APPENDIX B: AS -BUILT PLANS v IV -A-1 IV -A-3 Agreement No. 5975 NOTICE INVITING SEALED BIDS FOR THE ROLLER HOCKEY RINK IMPROVEMENTS IN THE CITY OF EL SEGUNDO PROJECT NO.: PW 19-13 The City of El Segundo is accepting sealed bids in the City Clerk's office, 350 Main Street, El Segundo, California 90245, until 11:00 a.m. on: TUESDAY, AUGUST 25, 2020 at which time they will be publicly opened. Bids will not be accepted after that time. As described in the Bidding Documents, the bids are for a Public Works project ("Project") which consists of a Roller Hockey Rink Improvements in the City of El Segundo and related work as shown on the plans on file with the City's Public Works Department. The project location is 401 Sheldon Street, El Segundo, CA 90245. Construction shall include but not be limited to the installation of dasher boards, drainage system, concrete and graphics. Work on the Project must be performed in strict conformity with Specifications No. PW 19-13 as adopted by the El Segundo City Council on February 18, 2020, which is filed with the Public Works Department. Copies of the Plans, Specifications, Contract Documents and Engineer's estimate are available from the Engineering Division of the Public Works Department, City of El Segundo, 350 Main Street, El Segundo, California, 90245. Plans and Specifications are alternately available electronically via https://www.elsegundo.org/government/departments/city-clerk/bid-rfp A pre-bid meeting is scheduled for Tuesday, August 4, 2020 at 9:00 AM, at 401 Sheldon St., Recreation and Parks Roller Hockey Rink (end of cul-de-sac on Sheldon St. north of Grand Ave.), El Segundo, CA 90245. Bidders' attendance at this meeting is mandatory. Questions regarding the bid shall be submitted by 5:00 pm on Wednesday, August 12, 2020 to https://www. elsegundo.org/government/departments/public-works/request-public-works-bid The terms and conditions for bidding on the Project are described in the attached Bidding Instructions. This project requires payment of State prevailing rates of wages for Los Angeles County. The Contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at www.dir.ca.gov. The Contractor to whom the Contract is awarded must assist in locating, qualifying, hiring and increasing the skills of minority group employees and applicants for employment, as set forth in I -A-1 Agreement No. 5975 Executive Order 11246 and 11375. Any Contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The City of El Segundo hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of Contract. Note that the Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code §§ 1725.5 and 1771.4, to be non-responsive. Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code ("PCC") § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, any such election will be at the Contractor own expense and will include costs incurred by the City to accommodate the Contractor's request. In entering into a Public Works Contract, or a Subcontract, to supply goods, services, or materials pursuant to a Public Works Contract, the Contractor, or Subcontractor, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the Public Works Contract or the Subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties. Bids must be prepared on the approved Proposal forms in conformance with the Instructions to Bidders and submitted to the City Clerk, 350 Main Street, City of El Segundo, in a sealed envelope plainly marked on the outside: "SEALED BIDS FOR PROJECT NO.: PW 19-13 ROLLER HOCKEY RINK IMPROVEMENTS IN THE CITY OF EL SEGUNDO DO NOT OPEN WITH REGULAR MAIL" The bid must be accompanied by a bid bond, made payable to the City of El Segundo for an I -A-2 Agreement No. 5975 amount no less than ten percent (10%) of the amount bid for the base Contract. No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the State Business and Professions Code. For these projects, those acceptable classes of license shall be "A". The successful Contractor and his Subcontractors will be required to possess the correct license for their project classifications, and valid City Business Licenses from the City of El Segundo. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. Any Contract entered into pursuant to this notice shall become effective or enforceable against the City of El Segundo only when the formal written Contract has been duly executed by the appropriate officer(s) of the City of El Segundo. DATED this 23r6 day of July, 2020. CITY OF EL SEGUNDO, CALIFORNIA Tracy Weaver, City Clerk I -A-3 Agreement No. 5975 BIDDING INSTRUCTIONS 1. DEFINITIONS. Unless provided otherwise, the definitions in the Greenbook, Special Conditions, or other Contract Documents are applicable to all Bidding Documents. 1.1 "Addenda" means written or graphic instruments issued by the City before the Bid Deadline that modify or interpret the Bidding Documents by additions, deletions, clarifications, or corrections. 1.2 "Alternate" means a proposed change in the Work, as described in the Bidding Documents which, if accepted, may result in a change to either the Contract Sum or the Contract Time, or both. 1.3 "Bid Deadline" means the date and time designated in the Notice for Bids as the last date and time for receipt of Bids, as may be revised by Addenda. 1.4 "Bidder" means a person or firm that submits a Bid. 1.5 "Bidding Documents" means the construction documents prepared and issued for bidding purposes including all Addenda. 1.6 "Lump Sum Base Bid" means the sum stated in the Bid for which Bidder offers to perform the Work described in the Bidding Documents, but not including unit price items or Alternates. 1.7 "Unit Price" means an amount stated in the Bid for which Bidder offers to perform the Unit Price Work for a fixed price per unit of measurement. 2. BIDDER'S REPRESENTATIONS. By making its Bid, Bidder represents that: 2.1 Bidder read, understood, and made the Bid pursuant to the requirements in the Bidding Documents. 2.2 Bidder visited the Project site and is familiar with the conditions under which the Work will be performed and the local conditions as related to the Contract Documents. 2.3 The Bid is based upon the materials, equipment, and systems required by the Bidding Documents. 2.4 Bidder and all Subcontractors, regardless of tier, have the appropriate current licenses issued by the State of California Contractor's State License Board for the Work to be performed. If Bidder is a joint venture, the Bidder will have a joint venture license appropriate for the performance of the work, and each member of the joint venture will likewise have the appropriate license. Business and Professions Code §§ 7000-7191 establish licensing requirements for Contractors. If a Bidder, that is a specialty Contractor, submits a Bid involving 3 or more specialized building trades, the work of which is more than incidental and supplemental to the performance of the Work for which Bidder holds a specialty Contractor license, Bidder must also hold a General Engineering Contractor "A" license. This requirement is applicable whether or not Bidder lists a Subcontractor for each such trade. 2.5 If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Contractors' State License Board which establishes that the individual or entity I -B-1 Agreement No. 5975 bringing the action was duly licensed in the proper classification of Contractors at all times during the performance of any act or Contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2.6 Bidder has the expertise and financial capacity to perform and complete all obligations under the Bidding Documents. 2.7 The person executing the Bid Form is duly authorized and empowered to execute the Bid Foran on Bidder's behalf. 2.8 Bidder is aware of and, if awarded the Contract, will comply with Applicable Code Requirements in its performance of the Work. 2.9 The Bidder has paid the City's business license fee(s) 2.10 The Bidder, per SB 854 requirements for public projects, has registered with and paid their annual fee to the California State Department of Industrial Relations. Information about SB 854 and its requirements can be found at this link: http://www.dir.ca.gov/Publie-Works/SB854.html 3. BIDDING DOCUMENTS 3.1 Bidders may obtain complete sets of the Bidding Documents from the City's Public Works Department for the sum stated in the Notice for Bids. 3.2 Bidders will use a complete set of Bidding Documents in preparing Bids. 3.3 The City makes copies of the Bidding Documents available, on the above terms, for the sole purpose of obtaining Bids for the Work and does not confer a license or grant permission for any other use of the Bidding Documents. 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS. 4.1 Before submitting its Bid, Bidder will carefully study and compare the various documents comprising the Bidding Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the Bid is submitted; will examine the Project site, the conditions under which the Work is to be performed, and the local conditions; and will at once report to the City's Representative errors, inconsistencies, or ambiguities discovered. 4.2 Requests for clarification or interpretation of the Bidding Documents will be addressed to the City's Representative. 4.2.1 The release of the bid package begins a quiet period for potential Bidders participating in this project. The City of El Segundo realizes it is critical to provide Bidders with a vehicle to ask questions so that quality responses can be prepared. Questions must be submitted in writing to project managers via the City website: https://www. el segundo.org/government/departments/public- works/request-public-works-bi d Responses to all questions will be provided in writing to all Bidders in accordance with the schedule below. We will not identify companies or individuals that pose questions. Potential bidders must not call City of El I -B-2 Agreement No. 5975 Segundo employees to discuss potential projects or ask -questions regarding the bid. Questions Due by 5:00 pm, Wednesday, August 12, 2020 Questions Answered by 4:00 pm Friday, August 14, 2020 4.3 Clarifications, interpretations, corrections, and changes to the Bidding Documents will be made by Addenda. Clarifications, interpretations, corrections, and changes to the Bidding Documents made in any other manner will not be binding and Bidders must not rely upon them. 5. PRODUCT SUBSTITUTIONS. Substitutions will only be considered before award of the Contract and as provided for in the Contract Documents. 6. SUBCONTRACTORS. 6.1 Each Bidder will list in the Bid Form all first-tier Subcontractors that will perform work, labor or render such services. The Bid Form contains spaces for the following information when listing Subcontractors: (1) Work Activity; (2) name of Subcontractor; (3) city of Subcontractor's business location. Failure to list any of these items on the Bid Form will result in the City treating the Bid as if no Subcontractor was listed for the Work and that Bidder represents to the City that it is fully qualified to perform that portion of the Work and will perform do so. 6.2 Subcontractors listed in the Bid Form will only be substituted after the Bid Deadline with the City's written consent in accordance with California law. 7. ADDENDA. 7.1 Addenda will be in writing and issued only by the City. Addenda will be mailed or delivered to all who are known by the City to have received a complete set of Bidding Documents and who have provided a street address for receipt of Addenda. 7.2 Copies of Addenda will be made available for inspection at the City's Public Works Department. 7.3 The City will issue Addenda so that they are received by prospective Bidders not later than three (3) business days before the Bid Deadline. Addenda that withdraw the request for Bids or postpone the Bid Deadline may be issued anytime before the Bid Deadline. 7.4 Each Bidder is responsible for ensuring that it has received all issued Addenda before issuing a Bid. 8. PRE-BID CONFERENCE. Bidder will attend a Pre -Bid Conference where the City will discuss the Bidding Documents, answer questions, accept comments, and conduct a Project site visit. The City requires all Pre -Bid Conference attendees to arrive for the meeting on time and to sign an attendance list which is used to determine if Bidders meet this requirement. Any Bidder not attending the Pre -Bid Conference in its entirety will be deemed to have not complied with the requirements of the Bidding Documents and its Bid will be I -B-3 Agreement No. 5975 rejected. 9. FORM AND STYLE OF BIDS 9.1 Bids will be submitted on the Bid Form included with the Bidding Documents. Bids not submitted on the City's Bid Form will be rejected. 9.2 All blanks on the Bid Form will be filled in legibly in ink or by typewriter. 9.3 Bidder's failure to submit a price for any Alternate or unit price will result in the Bid being considered as nonresponsive. If Alternates are called for and no change in the Lump Sum Base Bid is required, enter "No Change." 9.4 Each Bidder must fill out the "Bidders Statement of Past Contract Disqualifications" form stating any and all instances of Contract disqualifications due to a violation of a law or safety regulation. The Bidder must explain the circumstances of each disqualification. The City may reject the bid based on such information. 9.5 Bidder will make no stipulations on the Bid Form nor qualify the Bid in any manner. 9.6 The Bids will be based upon full completion of all the Work as shown on the plans and specifications. It is expressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the Bidder (if awarded the Contract) specifically agrees to construct a completed work ready for the use and in the manner which is intended. In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished must be paid for according to the unit or lump sum price established for such work under the Contract, wherever such unit or lump sum price has been established. In the event no prices are named in the Contract to cover such changes or alterations, the cost of such changes must be covered as extra work. 9.7 The Bid Form will be signed by a person or persons legally authorized to bind Bidder to a Contract. Bidder's Representative will sign and date the Declaration included in the Bid Foran. Failure to sign and date the declaration will cause the Bid to be rejected. 9.8 Bids must be submitted in writing on the Proposal forms provided by the City of El Segundo. One (1) set of these Proposal forms is inserted loose herein for use by the bidders. Bidders are required to submit one (1) original set of the proposal forms. All information requested therein must be clearly and legibly set forth in the manner and form indicated. 9.9 Bidders must satisfy themselves by personal examination of the work site, Plans, Specifications, and other Contract documents, and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the work must be performed. No bidder shall at any time after submissions of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies found in the Plans, Specifications, or other Contract documents shall be called to the attention of the City of El Segundo and clarified prior to the submission of proposals. Agreement No. 5975 10. BID SECURITY 10.1 Each Bid will be accompanied by Bid Security, in the amount of 10% of the Lump Sum Base Bid as security for Bidder's obligation to enter into a Contract with the City on the terms stated in the Bid Form and to furnish all items required by the Bidding Documents. Bid Security will be a Bid Bond on the form provided by the City or a certified check made payable to "City of El Segundo." When a Bond is used for Bid Security, failure to use the City's Bid Bond form will result in the rejection of the Bid. 10.2 If the apparent lowest responsible Bidder fails to sign the Agreement and furnish all items required by the Bidding Documents within the time limits specified in these Instructions to Bidders, the City will disqualify such Bidder and select the next apparent lowest responsible Bidder until all bids have been exhausted or the City may reject all bids. In such an event, the disqualified Bidder will be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the Bid Security, between the amount of the disqualified Bid and the larger amount for which the City procures the Work. 10.3 If a Bid Bond is submitted and an attorney-in-fact executes the Bid Bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the Bid Bond. The surety issuing the Bid Bond will be listed in the latest published State of California, Department of Insurance list of, "Insurers Admitted to Transact Surety Insurance in This State." 10.4 The City will retain Bid Security until the occurrence of one of the following: 10.4.1 All items required by the Bidding Documents have been furnished and the Agreement has been signed by the successful Bidder and the City. 10.4.2 The specified time has elapsed during which Bids may be withdrawn. 10.4.3 All Bids have been rejected. 10.5 The Bid Form, Bid Security, and all other documents required to be submitted with the Bid must be enclosed in a sealed opaque envelope. The envelope must be addressed to the City Clerk. The envelope must be identified with the Bidder's name and address, and identify the Project for which the Bid is submitted, as follows: "SEALED BIDS FOR PW 19-13: ROLLER HOCKEY RINK IMPROVEMENTS. DO NOT OPEN WITH REGULAR MAIL." Proposals may be mailed or delivered by messenger. 10.6 Bids will be deposited at the designated location on or before the Bid Deadline. A Bid received after the Bid Deadline will be returned to Bidder unopened. 10.7 Bidder will assume full responsibility for timely delivery at the location designated for receipt of Bids. 10.8 Oral, telephonic, facsimile, or telegraphic Bids are invalid and will not be accepted. 10.9 All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws related to bids for Contracts of this nature whether the same is expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and other Contract documents, and to full compliance therewith. I -B-5 Agreement No. 5975 11. MODIFICATION OR WITHDRAWAL OF BID. 11.11 Before the Bid Deadline, a submitted Bid may be modified or withdrawn. Notice of such action will be given to the City in writing and signed by the Bidder's authorized representative. A change so made will be so worded as not to reveal the amount of the original Bid. 11.12 A withdrawn Bid may be resubmitted up to the Bid Deadline, provided that it then fully complies with the Bidding Requirements. 11.13 Bid Security will be in an amount sufficient for the Bid as modified or resubmitted. l l .14 Bids may not be modified, withdrawn, or canceled within sixty (60) days after the Bid Deadline unless otherwise provided in Supplementary Instructions to Bidders. 11.15 Proposals may not be withdrawn after said Bid Deadline without forfeiture of the proposal guarantee. 11.16 The withdrawal of a proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so. 11.17 No mention shall be made in the proposal of Sales Tax, Use Tax, City Business License, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable. 11.18 No mention shall be made in the proposal of the cost of bonds as all amounts bid will be deemed and held to include any such costs, which may be applicable. 12. OPENING OF BIDS. Bids submitted in the manner required by these instructions and are received on or before the Bid Deadline will be opened publicly. 13. REJECTION OF BIDS. 13.1 The City will have the right to reject all Bids. 13.2 The City will have the right to reject any Bid not accompanied by the required Bid Security or any other item required by the Bidding Documents, or a Bid which is in any other way materially incomplete or irregular. 13.2.1 Unrequested/unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic, or telephonic proposal, modification, or withdrawal will be considered. 13.3 In the event that any bidder acting as a prime Contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to Subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime Contractor. No proposal will be accepted from a bidder who has not been licensed in accordance with the provisions of the State Business and Professions Code. 14. AWARD 14.1 The City may retain all bids for a period of ninety (90) days for examination and comparison, and to delete any portion of the work from the Contract. 14.2 The City will have the right to waive nonmaterial irregularities in a Bid and to accept the lowest responsive Bid as determined by The City. 14.3 The City will have the right to accept Alternates in any order or combination, unless I -B-6 Agreement No. 5975 otherwise specifically provided in the Bidding Documents. 14.4 The City will determine the low Bidder on the basis of the sum of the Lump Sum Base Bid plus all unit prices multiplied by their respective estimated quantities as stated in the Bid Fonn, if any, plus the Contractor Delay Damages multiplied by the "multiplier" as stated in the Bid Form, plus the amounts of all accepted Alternates. 14.4.1 Inclusion of Contractor Delay Damages within the Bid Form is solely for the purpose of determining the low bidder and establishing the City's maximum daily liability as a result of City delays to Contractor, if any, and City has no obligation to pay any daily Contractor Delay Damages except as provided for in these Contract Documents for Compensable Delays. In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Proposal Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 14.5 The City will select the apparent lowest responsive and responsible Bidder and notify such Bidder within thirty (30) days (unless number of days is modified in Supplementary Instructions to Bidders) after the Bid Deadline or reject all bids. Within ten (10) days after receiving the City's notice that Bidder was selected as the apparent lowest responsible Bidder, Bidder will submit to the City all of the following items: 14.5.1 Two originals of the Agreement signed by Bidder. 14.5.2 One original of the Payment Bond. 14.5.3 One original of the Performance Bond. 14.5.4 Certificates of Insurance on form provided by the City. 14.5.5 Names of all Subcontractors, with their addresses, telephone number, facsimile number, trade on Bidders' company stationery. Evidence, as required by the City, of the reliability and responsibility of the proposed Subcontractors such as statements of experience, statements of financial condition, and references. 14.5.6 Preliminary Contract Schedule. 14.5.7 Selection of Retention Options and Escrow Agreement for Deposit of Securities in Lieu of Retention and Deposit of Retention. If not submitted, the City will withhold retention. 14.5.8 Cost Breakdown. 14.6 Before award of the Contract, the City will notify Bidder in writing, if the City objects to a Subcontractor proposed by Bidder, in which case Bidder will propose a substitute acceptable to the City. Failure of the City to object to a proposed Subcontractor before award will not preclude the City from requiring replacement of any Subcontractor based upon information received subsequent to award, information which cannot be properly evaluated before award due to time constraints, or information relating to a failure to comply with the requirements of the Contract. 14.7 If Bidder submits the original signed Agreements and all other items within ten (10) days after receiving the City's notification, and all such items comply with the requirements of the Bidding Documents, the City will award the Contract to Bidder by signing the Agreement and returning a signed copy of the Agreement to Bidder. 14.8 If the City consents to the withdrawal of the Bid of the apparent lowest responsible Bidder, or the apparent lowest responsible Bidder fails or refuses to sign the I -B-7 Agreement No. 5975 Agreement or submit to the City all of the items required by the Bidding Documents, within ten (10) days after receiving the City's notification, or the City determines that the Bidder is not financially or otherwise qualified to perform the Contract, the City may reject such Bidder's Bid and select the next apparent lowest responsible Bidder, until all bids are exhausted, or reject all Bids. RM Agreement No. 5975 PROPOSAL FOR THE ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Date , 20 Company Name: TO THE CITY OF EL SEGUNDO: In accordance with the City of El Segundo's Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and Contract documents therefor, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other Contract documents. Submittal of this bid shall be considered evidence that the BIDDER has satisfied himself regarding the Contract documents, access and any other field conditions which may affect bid prices. If this proposal is accepted for award, BIDDER agrees to enter into a Contract with the City of El Segundo at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a Contract in the manner and time prescribed will result in forfeiture to the City of El Segundo of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the Contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER'S default in executing the required Contract and filing the necessary bonds and insurance certificates within ten working days after the date of the City of El Segundo's notice of award of Contract to the BIDDER, including sending by U.S. Mail a Public Works Contract for signature by the Awardee, the proceeds of the security accompanying this bid shall become the property of the City of El Segundo and this bid and the acceptance hereof may, at the City of El Segundo's option, be considered null and void. Agreement No. 5975 LOI m ;Mfg°1,,PYN ENT,..(PP,()RI"UN1TN'.C,()i�lyl I CF BIDDER certifies that in all previous Contracts or Subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFFj,RM,ATjN1V, 1 O BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be Subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any Contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the Contract documents. NONCOLLUSION A F'IDAV BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the City of El Segundo is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud. I -C-2 Company Name: Base Bid Items 3 4 5 12 Agreement No. 5975 BID SCHEDULE ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 I -C -3a Unit Price Item Total Description Estimated (in figures) (in figures) Unit uantity Dollars/Cents Dollars/Cents Mobilization/Demobilization LS White HDPE - U.V. .................. .................... Stabilized Sheet and all necessary hardware EA 60 (3/4"x48"x97) (Desert Sand Finish) . . . ..... ............... . . Yellow Kickplate — U.V. ---------- Stabilized and all necessary EA 126 hardware (3/4"x6"x48" Lullnosed) . ............. . ...................... . . _. .............. . ...... ..... .................... . . . . . . ................................................ . ........................................ I Straight Blue Topsill — U.V. Stabilized and all necessary EA 88 hardware (3/4"x5"x4.. . .8") .. ....... . ...... Radius Blue Topsill — U.V. Stabilized and all necessary EA 36 hardware (3/4"x5 99x48") (20'-4" radius) . . ........... . ............ ... Remove and reconstruct 6" concrete slab with footing SF 1,185 and reinforcement steel ........................ Install 2' deep section of crushed miscellaneous base SF 1,185 (CMB) .......... ........... Remove and reconstruct 4" SF 80 thick concrete walkway . ................................... . . . ............................... - — ---------- - Install 4" subdrain LF 248 perforated pipe-, ........... ............. Install 6" PVC pipe LF 70 (schedule 35) . . ............. ... . .......... . - Connect proposed drainage system to existing catch LS basin Repair cracks, depressions, surface defects and uneven LS areas I -C -3a Agreement No. 5975 11,710 Cel 4 TOTAL BASE BID FOR ITEMS 1-17 IN FIGURES = $ TOTAL BASE BID FORITEMS 1-17 WRITTEN IN WORDS: _ I -C-3 a Apply concrete roller hockey surface color coating 13 system (2 coats) (prepare SF surface per manufacturer's recommendations prior to i applicaton) ..... ............ 14 Replace all roller hockey LS striping per as -built plans Printing and installation of LA Kings logo onto the 15 dashboard (prepare surface EA per manufacturer's recommendations prior to application) Printing and installation of LA Kings logo onto the center of the concrete 16 hockey rink (prepare surface EA per manufacturer's recommendations prior to a lication Printing and installation of LA Kings logo onto the 17 player bench (prepare EA surface per manufacturer's recommendations prior to a pplication) 11,710 Cel 4 TOTAL BASE BID FOR ITEMS 1-17 IN FIGURES = $ TOTAL BASE BID FORITEMS 1-17 WRITTEN IN WORDS: _ I -C-3 a Alternative Bid Items Item Description No. 1 m......... Remove and replace chain Li - k fence (12' high) Agreement No. 5975 Unit Price Estimated (in figures) Unit uantitv,,_ Dollars/Cents LF 450 TOTAL ALTERNATIVE BID FOR ITEM 1 IN FIGURES = $ TOTAL ALTERNATIVE BID FOR ITEM I WRITTEN IN WORDS: I -C -3a Item Total (in figures) Dollars/Cents Agreement No. 5975 BIDDER'S INFORMATION Company Name: BIDDER certifies that the following information is true and correct: Form of Legal Entity (i.e., individual, partnership, corporation, etc.) If corporation, State of Incorporation (i.e., California) Business Address Telephone No. Facsimile No. State Contractor's License No. and Class Original Date Issued Expiration Date The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest in this proposal: The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows: All current and prior DBA's, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: I -C-4 Agreement No. 5975 BIDDER'S INFORMATION (CONTINUED) Company Name: Bidder shall list the name of the person who attended the mandatory pre-bid job walk: Name: Title: I -C-5 Agreement No. 5975 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all a forenamed principals this day of , 20_. BIDDER Subscribed and sworn to this day of , 20 NOTARY PUBLIC I -C-6 Agreement No. 5975 PROPOSAL GUARANTEE BID BOND ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 KNOW ALL MEN BY THESE PRESENTS that, , as BIDDER, and , as SURETY, are held and firmly bound unto the City of El Segundo, in the penal sum of _ DOLLARS ($ ), which is ten (10%) percent of the total amount bid by BIDDER to the City of El Segundo for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to the City of El Segundo for the above stated project, if said bid is rejected, or if said bid is accepted and a Contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City of El Segundo. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this day of , 20 BIDDER* SURETY* Subscribed and sworn to this day of 20 NOTARY PUBLIC *Provide BIDDER/SURETY name, title, address and telephone number and the name, title, address and telephone number for authorized representative. I -C-7 Agreement No. 5975 CONTRACTOR'S LICENSE DECLARATION (Business and Professions Code Section 7028.15) 1. BIDDER'S Contractor's License Number is: Class No.: 2. The expiration date of BIDDER'S Contractor License is: 20 3. BIDDER acknowledges that Section 7028.15(e) of the Business and Professions Code provides as follows: "A licensed Contractor shall not submit a bid to a public agency unless his or her Contractor's license number appears clearly on the bid, the license expiration date is stated, and the bid contains a statement that representations herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non-responsive and shall be rejected by the public agency." The undersigned declares, under penalty of perjury, that the representations made by the undersigned in this bid proposal are true and correct. Executed on _, 20 , at Signature Typed Name Title Company Name (insert City and State where Declaration signed). I -C-8 Agreement No. 5975 NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ) ss. County of ) _............... , being first duly sworn, deposes and say that he or she is of the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine*and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed Contract; that all statements contained in the bid are true; and further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Signature Typed Name Title [KOW Name of Bidder/Company Name Date Agreement No. 5975 WORKER'S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) Pursuant to Section 1861 of the Labor Code, the BIDDER, in submitting his/her PROPOSAL, shall sign the following certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract." Signature of Bidder: Title: Business Name: Business Address: Telephone Number: Dated this day of _ , 20 I -C-10 Agreement No. 5975 BIDDER'S CERTIFICATION OF SUBCONTRACTORS ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: 19-03 Company Name: As detailed in Section 2-3.1 (Page II -B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. ....... ..._........... ...................... .........,.,_ _ :... Subcontractors Description ' of Contractor License Portion of Name of No. & DIR Work Estimated Subcontractor Address Registration No. Subcontracted $ Amount (Number and Street) (CSLB #) (City, Zip Code) (DIR#) .......................................... .....................�. (Make copies of this page if additional space is needed) Signature of Bidder Date REFERENCES Company Name: Agreement No. 5975 The following are the names, addresses, and telephone numbers for public agencies for which BIDDER has performed similar work as the prime Contractor or major Subcontractor within the past five (5) years: 9 , Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ ................... Date completed: Amount of work done by my/our firm under Contract $ Did your firm have any financial interest in Project? 2. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: _. .......,.. Amount of work done by my/our firm under Contract $ Did your firm have any financial interest in Project? I -C-12 Agreement No. 5975 Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ _......... ......--- -__ ,_ Date completed: IT m Amount of work done by my/our firm under Contract $ Did your firm have any financial interest in Project? 4, Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under Contract $ Did your firm have any financial interest in Project? „__ITITIT. I -C-13 Agreement No. 5975 5. Project Title: Location: Naive and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under Contract $ Did your firm have any financial interest in Project? Bidder may attach additional reference pages if necessary. The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance bonds: I -C-14 Agreement No. 5975 BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Company Name: Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation. 1. Have you ever been disqualified from any government Contract? Yes ❑ No ❑ 1 If yes, explain the circumstances: 3. Are you registered in accordance with Labor Code § 1725.5 [Note: failure to register requires the City to reject your bid as nonresponsive]? Yes ❑ No ❑ Bidder's Signature Name (Please Print) I -C-15 Agreement No. 5975 INSURANCE REQUIREMENTS [MUST BE SUBMITTED WITH PROJECT PROPOSAL] ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Company Name: To be awarded this Contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Tvve of insurance Limits Commercial general liability: $2,000,000 Business automobile liability: $1,000,000 Workers compensation: Statutory requirement Commercial general liability insurance must meet or exceed the requirements of ISO -CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to naive the City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance must be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to the City. Insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by Contractor for the City. Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to snail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. The City requires California Worker's Compensation Coverage with the associated Waiver. Out-of-state coverage will not be accepted in lieu of the California coverage, because the work is being performed in the State of California. By signing this form, the bidder certifies that it has read, understands, and will comply with these insurance requirements if it is selected as the City's consultant. Failure to provide this insurance will render the bidder's proposal "nonresponsive." Date I -C-16 Bidder's Signature Agreement No. 5975 END PROPOSAL SECTION I -C-17 Agreement No. 5975 PUBLIC WORKS CONTRACT BETWEEN THE CITY OF EL SEGUNDO AND [CONTRACTOR] ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 This CONTRACT is entered into this .—,day of 20 by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ("the City") ands , ("the Contractor"). 1. WORK. A. The Contractor will provide all work required by the Contract Documents (the "Work"). The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents. B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents; C. The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the Contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings. 2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed Dollars ('S ) for the Work in the manner set forth in the Contract Documents. The City may adjust this amount as set forth in the Contract Documents. 3. TIME FOR PERFORMANCE. A. The Contractor will fully complete the Work within thirty (30) working days (the "Contract Time.") I -D-1 Agreement No. 5975 B. The Contract Time will commence when the City issues a Notice to Proceed. The Contract Documents will supersede any conflicting provisions included on the notice to proceed issued pursuant to this Contract. C. The Contractor may not perform any Work until; The Contractor furnishes proof of insurance as required by the Contract Documents; and ii. The City gives the Contractor a written, signed, and numbered purchase order and notice to proceed. D. By signing this Contract, the Contractor represents to the City that the Contract Time is reasonable for completion of the Work and that the Contractor will complete the Work within the Contract Time. E. Should the Contractor begin the Work before receiving written authorization to proceed, any such Work is at the Contractor's own cost and risk. 4, DISPUTES. Disputes arising from this Contract will be determined in accordance with the Contract Documents and Public Contracts Code § § 10240-10240.13. 5. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third -party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the "Notice" section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third -party claim. 6. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number. 7. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and certificates that may be required in connection with the Work. 8. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the City's property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City's written notice. 9. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits I -D-2 Agreement No. 5975 of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification. 10. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor will act as an independent Contractor and will have control of all work and the manner in which is it performed. The Contractor will be free to Contract for similar service to be performed for other employers while under Contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doing the work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only. 11. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents. 12. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: The City Arianne Bola Senior Associate Engineer City of El Segundo 350 Main Street, El Segundo, CA 90245 The Contractor Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 13. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. I -D-3 Agreement No. 5975 There will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations under this Contract. 14. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County. 15. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows: A. This Contract; B. The Standard Specifications; and C. Precedence of documents as determined in the Standard Specifications. 16. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect. 17. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract may be modified by written amendment. The City's city manager, or designee, may execute any such amendment on the City's behalf. 18. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 19. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 20. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract. 21. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents. IN WITNESS WHEREOF the parties hereto have executed this Contract the day I -D-4 and year first hereinabove written. CITY OF EL SEGUNDO Scott Mitnick City Manager ATTEST: Tracy Weaver, City Clerk APPROVED AS TO FORM: MARK D. HENSLEY, City Attorney David H. King, Assistant City Attorney Insurance Reviewed by: I -D-5 Agreement No. 5975 Taxpayer ID No, Contractor State License No.: Contractor City Business License No.: Agreement No. 5975 FAITHFUL PERFORMANCE BOND ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Bond No. Bond Fee: ("PRINCIPAL") and ,. a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of DOLLARS, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, SPECIFICATIONS NO. PW 19-13, and the Public Works Contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 19-13, a copy of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING NO. PW 19-13) which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. CITY has estimated the required amount of the bond as shown above. 2. PRINCIPAL's work on the Public Project will be done in accordance with CITY's plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor. 3. PRINCIPAL will guarantee its work against any defective work, labor, or materials on the Public Project for a period of one (1) year following the Public Project's I -E-1 Agreement No. 5975 completion and acceptance by CITY. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 19-13 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the Contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -E-2 SIGNED AND SEALED this day of' PRINCIPAL's PRESIDENT PRINCIPAL's SECRETARY Agreement No. 5975 20 SURETY's PRESIDENT SURETY's SECRETARY PRINCIPAL's MAILING ADDRESS: SURETY's MAILING ADDRESS: _................. ............. NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. I -E-3 Agreement No. 5975 LABOR AND MATERIALS BOND ROLLER HOCKEY RINK IMPROVEMENTS PROJECT NO.: PW 19-13 Bond No. Bond Fee: as principal ("PRINCIPAL") and m ,a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of DOLLARS, ............. lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. This bond is conditioned upon and guarantees payment by PRINCIPAL to Contractors, Subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL'S Subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in ROLLER HOCKEY RINK IMPROVEMENTS, SPECIFICATIONS NO. PW 19-13 ("Public Project"), the Public Works Contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 19-13, and the Public Works Contract executed for such Specifications, copies of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING FILE NO. PW 19-13), which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. 2. PRINCIPAL will pay all Contractors, Subcontractors, and persons renting equipment. I -F-1 Agreement No. 5975 3. PRINCIPAL will pay for all materials and other supplies, for equipment used in, on, for or about the performance of the Public Project, and will pay for all work and labor thereon. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 19-13, or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the Contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted. 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will re in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -F-2 SIGNED AND SEALED this day of PRINCIPAL's PRESIDENT PRINCIPAL's SECRETARY PRINCIPAL's MAILING ADDRESS: Agreement No. 5975 20 SURETY's PRESIDENT SURETY's SECRETARY SURETY's MAILING ADDRESS: NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. I -F-3 Agreement No. 5975 ;TION If - GE + dAL REOI_.iIRVME"a T" CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT GENERAL SPECIFICATIONS 1. REGISTRA, TION OF CONTRAC,TOI�S No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the laws of the State of California relating to licensing of Contractors, for the type of work to be performed under this Contract. 2. INSURANCE AND CITY BUSINESS LICENSE Contractor and Subcontractors will obtain appropriate insurance and a City Business License before execution of the construction Contract. 3. EMERGENCY INFORMATION The names, addresses and telephone numbers of the Contractor and Subcontractors, or their representatives, will be filed with the City Engineer and the City Police Department BEFORE PERFORMING WORK. 4. FURNISHING OF WATER Water necessary for the prosecution of the work as herein specified will be furnished by the City in the following manner: The Contractor will deposit with the City Water/Wastewater Division the sum of Three Hundred Fifty Dollars ($ 350.00) to insure against damage to a 2 '/2" Fire Hydrant water meter which will be furnished and installed by the City at a point convenient to the site of the work. This deposit will be refunded to the Contractor upon completion of the Project if, after removal and inspection of said meter by the City, it is found to be in satisfactory condition. In event of damage to this meter while under the jurisdiction of the Contractor, all or any part of said deposit may be retained by the City. A non-refundable Activation Fee of One Hundred Dollars ($100.00) will be charged upon activation of the temporary meter. CALIFORNIA - OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION All work performed under this Contract will be done in strict compliance with the Cal -OSHA Rules and Regulations, latest edition. 6. SOUND CONTROL The Contractor will comply with all local sound control and noise level rules, regulations II -A-1 Agreement No. 5975 and ordinances that apply to any work performed pursuant to the Contract. Each internal combustion engine, used for any purpose on the Project or related to the Project, will be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine will be operated on the Project without said muffler. The use of loud signals will be avoided in favor of light warnings except those required by safety laws for the protection of personnel. 7. AIR POLLUTION CONTROL The Contractor is put on notice that he must abide by all existing rules and regulations of the SCAQMD (South Coast Air Quality Management District), relating to all operations or equipment which discharge visible emissions or solid or liquid particles to the atmosphere. 8. WORKER UNIFORMS All workers under the employment of the Contractor or his/her Subcontractor will wear an orange vest or an orange shirt while working in the public right-of-way. II -A-2 Agreement No. 5975 CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT GENERAL PROVISIONS 0-0 STANDARD SPECII'ICATIONS 0-1 GENERAL Except as modified by these Standard Specifications, the provisions of the latest edition of the "Standard Specifications for Public Works Construction" ("Greenbook") and its supplements prepared and promulgated by the Southern California Chapters of the American Public Works Association and the Associated General Contractors of America, constitute the Standard Specifications for this prof ect. 0-2 NUMBERING OF 51::�CTIONS The numbering contained within the Standard Specifications of the Contract Documents is intended to correspond with Greenbook numbering. 1-2 DEFINITIONS The following subsection is added to Subsection 1-2 of the Greenbook. 1-2.1 ADDITJONAI- DEFINITIONS Acceptance — The date on which the City Council accepts the Work as complete. Architect, Design Engineers, Soils Engineer, Structural Engineers - Advisors employed by the City. City Council - The body constituting the awarding authority of the City. Compensable Delay -- a delay entitling the Contractor to an adjustment of the Contract Sum and an adjustment of the Contract Time in accordance with this Agreement. Due Notice - A written notification, given in due time, of a proposed action where such notification is required by the Contract to be given a specified interval of time (usually 48 hours or two working days) before the commencement of the contemplated action. Notification may be from Engineer to Contractor or from Contractor to Engineer. Engineer - The City Engineer, or designee, as defined in the Greenbook. Unless otherwise provided, all correspondence and decisions made relative to the Contract will be by the City Engineer or his designated representative. PCC — California Public Contract Code. II -B-1 Agreement No. 5975 Prompt - The briefest interval of time required for a considered reply, including time required for approval of a governing body. Public Works Director — The City's Public Works Director, or designee. ❑ (Check if applicable) State Standard Specifications - State of California Standard Specifications, dated July 1992, Business and Transportation Agency, Department of Transportation Working Days - A working day is defined as any day, except Saturdays, Sundays, legal holidays and days when work is suspended by the Engineer, as provided in Subsection 6-3 and days determined to be non -working in accordance with Subsection 6-7, "Time of Completion." 1-3 ABBREVIATIONS The following Subsection is added to Subsection 1-3 of the Greenbook. 1-3.1 The following abbreviations are added to Subsection 1-3 of the Greenbook: AAN American Association of Nurserymen AGC Associated General Contractors of America AISC American Institute of Steel Construction APWA American Public Works Association ASME American Society of Mechanical Engineers IEEE Institute of Electric and Electronic Engineers NEC National Electric Code Green Book The most current edition of the Standard Specification for Public Works Construction, and subsequent supplements prepared by Public Works Standards, Inc. WATCH Work Area Traffic Control Handbook SPPWC Standard Plans for Public Works Construction by the American Public Works Association SSPWC Standard Specifications for Public Works Construction by the American Public Works Association ASA American Standard Association CITY City of El Segundo 2-0 SCOPE AND CONTROL OF WORK The following subsections 2-1.1 and 2-1.2 are added to the Greenbook. 2-1.1 A(°.C1°SS `ro 1 RO.11:°(,1"I" SI'FE Not later than the date designated in the City Notice to Proceed, the City will provide access to the real property and facilities upon which the Work is to be performed, including access to real property and facilities designated in the Contract Documents for the Contractor's use. II -B-2 Agreement No. 5975 2-1.2 OWNERSHIP AND USE OF CONTRACT DOCUMENTS. The Contract Documents and all copies furnished to or provided by the Contractor are the City's property and may not be used on other work. 2-3 SUBCONTRACTS Subsection 2-3 Subcontractors of Greenbook is deleted in its entirety and replaced with the following subsection. 2-3.1 GENERAL Except as provided in PCC § § 4100 et. seq., each bidder will file with its bid the name and location of the place of business of each Subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement, or a Subcontractor licensed by the State of California who, under Subcontract to the prime Contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the prime Contractor's total bid. Only one Subcontractor will be listed for each portion of the work, which portion will be defined in the bid. In each instance, the nature and extent of the work to be sublet will be described. The failure of the Contractor to specify a Subcontractor, or the listing of more than one Subcontractor for the same portion of the work, constitutes an agreement by the Contractor that it is fully qualified to perform that portion itself and that it will perform that portion itself. The Contractor must have the City Council's written consent to substitute a Subcontractor other than that designated in the original bid, to permit any Subcontract to be assigned or transferred, or to allow a Subcontract to be performed by other than the original Subcontractor. Subcontracting of work for which no Subcontractor was designated in the original bid, and which is more than one-half of one percent of the work, will be allowed only in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the City Council setting forth the facts constituting the emergency or necessity. Violation of any of the above provisions will be considered a breach of the Contract, and the City may terminate the Contractor's control over the Work, cancel the Contract, or assess the Contractor a penalty of not more than ten percent of the Subcontract involved. All persons engaged in the work, including Subcontractors and their employees will be considered as employees of the Contractor. The Contractor will be solely responsible for and have control over construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the Work. The City will deal directly with, and make all payments to, the prime Contractor. When Subcontracted work is not being prosecuted in a satisfactory manner, the 11-B-3 Agreement No. 5975 Contractor will be notified to take corrective action. The Engineer may report the facts to the City Council. If the City Council so orders, and on receipt by the Contractor of written instructions from the Engineer, the Subcontractor will be removed immediately from the Work. That Subcontractor will not again be employed on the Work. If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Contractors' State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of Contractors at all times during the performance of any act or Contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2-3.2 C DDITIONA1. RESPONSIBILITY Add the following to Subsection 2-3.2 Additional Responsibility: The Contractor will submit experience statements for each Subcontractor who will perfonn Contract work that amounts to more than ten percent (10%) of the Work. 2-4 CONTRACT BONDS The following paragraph is added to Subsection 2-4 of the Greenbook. The Faithful Performance Bond and the Labor and Materials Bond must be paid and in effect for one year after the acceptance of the job by the City in accordance with the guarantee required by Subsection 6-8.1. 2-5 PIANS AND SPECIFICATIONS Subsection 2-5.1 of the Greenbook is replaced by the following subsection. 2-5.1 GENERAL The Contractor will maintain the following at the Work site: 1. One as -built copy of the Plans and Specifications, in good order and marked to record current changes and selections made during construction. As -built plans must be submitted to the City representative for approval before the City pays a final retention amount. 2. The current accepted Contract Schedule. 3. Shop Drawings, Product Data, and Samples. 4. Approved permits from other agencies, including Cal -OSHA permits II -B-4 Agreement No. 5975 for trench shoring. 5. All other required submittals. The Plans, Specifications, and other Contract Documents will govern the Work. The Contract Documents are intended to be complementary and cooperative and to describe and provide for a complete project. Anything in the Specifications and not on the Plans, or on the Plans and not in the Specifications, will be as though shown or mentioned in both. Payment for any items on the plans for which there is no specific bid item will be included in the various items of work or in any item to which it is appurtenant. If the Contractor performs any work which it knows or should know involves an error, inconsistency, or omission without notifying and obtaining written consent from the Engineer, the Contractor will be responsible for the resulting losses, including, without limitation, the costs of correcting defective work. 2-5.2 PRECEDENCE OF CONTRACT DOCUMENTS The following paragraph is added to subsection 2-5.2 of the Greenbook: As the figured dimensions shown on the plans and in the specifications of the Contract may not in every case agree with scaled dimensions, the figured dimensions will be followed in preference to the scaled dimensions, and plans to a large scale will be followed in preference to the plans to a small scale. Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in the Contract, the Contractor will apply to the Engineer for such further explanations as may be necessary, and will conform thereto as part of the Contract so far as may be consistent with the terms thereof. Any items shown on drawings and not mentioned in the specifications will be of like effect as if shown or mentioned in both. 2-5.5 ACCURACY Y OF 111 -ANS AND SPEC IFICA"'l`1ON Although it is believed that much of the information pertaining to conditions and existing utilities that may affect the cost of the Work will be shown on the Plans or indicated in the Specifications, the City does not warrant the completeness or accuracy of such information. The Contractor will carefully study and compare each of the Contract Documents with the others and with information furnished by the City and will promptly report in writing to the Engineer any errors, inconsistencies, or omissions in the Contract Documents or inconsistencies with applicable law observed by the Contractor. The Contractor will take field measurements, verify field conditions, perform soil investigations, and carefully compare with the Contract Documents such field measurements, conditions, and other information known to the Contractor before commencing the Work. Errors, inconsistencies, or omissions discovered at any time will be promptly reported in writing to the Engineer. II -B-5 Agreement No. 5975 2-8 RIGHT-OF-WAY The following subsection is added to Subsection 2-8 of the Greenbook. 2-8.1 AIID17'IONA1_ WORK AREAS ANIS FACILITIES When the Contractor arranges for additional temporary work areas and facilities, the Contractor will provide the City with proof that the additional work areas or facilities have been left in a condition satisfactory to the owner(s) of said work areas or facilities before acceptance of the work. 2-9 SURVEYING Subsection 2-9.3, Survey Service, is deleted in its entirety and replaced by the following subsection: 2-9.3 SURVEY SERVICE 2-9.3.1 CONSTRUCTION SURVEYING The Contractor will provide for all construction surveying required to layout, monitor and complete the work. The surveying will be performed by a Land Surveyor or Civil Engineer authorized to practice land surveying by the State of California. The Project Benchmark is shown on the plans. The Contractor will establish all necessary control lines based on the plans and record information on file with the County of Los Angeles Surveyor and the Engineer. It is the responsibility of the Contractor to protect the survey control as shown on the plans. If the survey control is destroyed or disturbed during construction, the Contractor will provide for resetting thein and file appropriate documents with the County of Los Angeles at the direction of the Engineer. Computations, survey notes, and other data used to accomplish the work will be neat, legible and accurate. Copies of all computations, survey notes, and other data (electronic format may be required) will be furnished to the Engineer before beginning work that requires their use. 2-9.3.2 MEASUREMEN"I' AND PAYM ENT Construction Survey — Unless a separate bid item is provided, payment will be considered included in the other items of the bid and no additional payment will be made therefore. 3-3.2.2 BASIS FOR ESTA13LISBING COST Subsection 3-3.2.2.3, Tool and Equipment Rental is modified where the second and third paragraphs are replaced with "Regardless of ownership, the rates to be used in 1I -B-6 Agreement No. 5975 determining the equipment usage costs will not exceed those listed for the same or similar equipment in the California State Department of Transportation publication of Labor Surcharge and Equipment Rates effective for the period of usage." 3-3.2.3 MARK UP Subsection 3-3.2.3, Mark Up, is deleted in its entirety and replaced by the following subsection: (a) Work by Contractor. The following percentages will be added to the Contractor's costs and will constitute the markup for all overhead and profits. 1) Labor..................................................20 2) Materials............................................15 3) Equipment Rental...............................15 4) Other Items and Expenditures .... ........15 To the sum of the costs and markups provided for in this subsection, 1 percent will be added as compensation for bonding. No other formula, e.g., the Eichleay or other method, may be used to calculate daily damages for office overhead, profit, or other purported loss. (b) Work by Subcontractors. When all or any part of the extra work is performed by a Subcontractor, the markup established in 3-3.2.3(a) will be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the Subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the Subcontracted portion of the extra work may be added by the Contractor. (c) In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Bid Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 3-3.3 DAILY REPORTS BY CONTRACTOR Add the following paragraph to subsection 3-3.3, Daily Reports by Contractor: If disagreement continues regarding extra work, the Contractor may seek compensation in accordance with the Claims procedure. Daily Reports required by this subsection must be made part of the Claim as supporting data for the Claim. 3-4 CHANGED CONDITIONS Subsection 3-4, Changed Conditions, is deleted in its entirety and replaced with the following subsection: If the Contractor encounters concealed or unknown conditions that differ materially from those anticipated or expected ("changed conditions"), the Contractor will immediately notify the Engineer in writing of such changed conditions (upon II -B-7 Agreement No. 5975 discovery and before disturbing such changed conditions), as provided in Subsection 6-11, so that the Engineer can determine if such conditions require design details that differ from those design details shown in the Contract Documents. Notwithstanding the time period set forth in Subsection 6-11.3, the Contractor is liable to the City for any extra costs incurred as a result of the Contractor's failure to promptly give such notice. Changed conditions include, without limitation, the following: Subsurface or latent physical conditions differing materially from those represented in the Contract Documents; 2. Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and Material differing from what is represented in the Contract which the Contractor believes may be hazardous waste as defined in California Health & Safety Code § 25117 that is required to be removed to a Class I, II, or III disposal site in accordance with applicable law. The Engineer will promptly investigate conditions that appear to be changed conditions. The Engineer's decision, and any dispute regarding that decision, will be made in accordance with Section 6-11 except that the Engineer will render a decision promptly. Any information provided pursuant to INFORMATION AVAILABLE TO BIDDERS is subject to the following provisions: The information is made available for the Bidders' convenience and is not a part of the Contract. 2. The City has not determined the accuracy or completeness of such information and all such information is made available to Bidders without any representation or warranty by the City whatsoever as to its accuracy, completeness, or relevancy. Bidders will independently evaluate such information for their use and will be solely responsible for use or interpretation of such information. Any such use or interpretation will not be the basis of any claim against the City. 3-5 DISPUTED WORK Subsection 3-5 is deleted in its entirety and replaced by the following subsection. If the Contractor and the City do not reach agreement on disputed work, the City may direct the Contractor to proceed with the work. Any payment for the disputed work will be determined pursuant to the claims procedures in these Standard Specifications. Although not to be construed as proceeding under extra work 1I -B-8 Agreement No. 5975 provisions, the Contractor will keep and furnish records of disputed work as required by the Contract Documents. 4-1.3 lNSPEC"'HON REOUIRl NIE TSS Subsection 4-1.3, Inspection Requirements, is deleted in its entirety and replaced by the following subsections. 4-1.3.1 GENERAL Unless otherwise specified, inspection at the source of production for such materials and fabricated items as bituminous paving mixtures, structural concrete, fabricated metal products, cast metal products, welding, reinforced and unreinforced concrete pipe, application of protective coatings, and similar shop and plant operations is not required. A certificate of compliance, signed by an authorized officer of the producer, certifying compliance with the Contract documents will be submitted for all of the following materials: steel pipe, sizes less than 18 inches; vitrified clay pipe; asbestos cement pipe; cast iron pipe; reinforced concrete pipe; non -reinforced concrete pipe; and PVC sewer and water pipe; subject to sampling and testing by City. Standard items of equipment, such as electric motors, conveyors, plumbing fittings and fixtures, lumber, plywood, and so on, are subject to inspection at the job site. All other equipment items will be inspected and tested in accordance with the Contract documents. The City does not provide full time inspection. The Contractor will provide 24-hour minimum notice for each inspection required by the work unless other arrangements have been agreed upon, in writing, with the City Engineer. Any inspection required outside of normal working hours and days, including holidays, will be at the Contractor's cost at rates established by the City. 4-1.6 TRADE NAMES OR EQUALS Whenever any material, product, equipment, or service is specified by brand, trade, or proprietary name, the item so specified will be deemed to be followed by the words "or equal". For the City's consideration of a proposed "equal" item, the Bidder must submit, a minimum of ten (10) calendar days before the date of the bid opening, documentation of the particulars of the proposed "equal item". At a minimum, the submitted documentation will include: • Written request with explanation of why the product should be considered as an equal product. • Material specifications. * Technical specifications. ■ Test data. • Samples. II -B-9 Agreement No. 5975 Comparison chart of key specifications of the "equal" item against similar specifications of the specified item. Work locations and reference telephone numbers of at least three (3) locations where the proposed "equal" item has been recently installed under similar conditions. M Warranty data. The Bidder will be notified by the Engineer whether or not the proposed "equal" product is acceptable to the City five (5) calendar days before the date of the bid opening. Failure to submit all required documentation and/or submittal of incomplete documents may result in the City's rejection of the proposed "equal" product without further consideration. 5-2 PROTECTION The following subsection is added to Subsection 5-2 of the Greenbook. 5-2.1 INCORRECT LOCATION OF UTILITIES, If the Contractor, while performing the Work, discovers utility facilities not identified correctly or not shown in the Contract plans or specifications by the City, the Contractor will immediately notify the City and utility owner in writing. 5-4 RELOCATION The following subsection is added to Subsection 5-4 of the Greenbook. 5-4.1 RESPONSIBILITN'OF L.JTILITIY REMOVAL OIC RLOCATIO The City will be responsible to arrange for the removal, repair, or relocation of existing utilities located within the project limits if such utilities are not correctly identified in the Contract plans or specifications by the City. The City will have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation. 5-5 DELAYS The following paragraphs are added to Subsection 5-5 of the Greenbook. Actual loss, as used in this Subsection, will be understood to include no items of expense other than idle time of equipment and necessary payments for idle time of workers, cost of extra moving of equipment, and cost of longer hauls. Compensation for idle time of equipment and idle time of workers will be determined by Subsection 5-5.1 and no markup will be added in either case for overhead and profit. The cost of extra moving of equipment and the cost of longer hauls will be paid for as extra work. The following subsection is added to Subsection 5-5 of the Greenbook. 5-5.1 (,ALCI.ILATING IDLE TIME II -B-10 Agreement No. 5975 Equipment idle time will calculated in accordance with Subsection 3-3.2.2 and based upon the actual normal working time during which the delay condition exists, but in no case will exceed 8 hours in any one day. The days for which compensation will be paid will be the calendar days, excluding Saturdays, Sundays and legal holidays, during the existence of the delay. Worker idle time will be calculated in accordance with Subsection 3-3.2.2. 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK Section 6-1, Construction Schedule and Commencement of Work, is deleted in its entirety and replaced by the following subsections. PrC-Cor1sU11 6o11 MeetI11 : After Contract award, the City will arrange for a pre -construction meeting to discuss the construction of the project. City will invite utility agencies and the Contractor will arrange for all of its Subcontractors to attend the meeting. 6-1.1 CONTRACT SCIJEDULI After notification of award and before starting any work, the Contractor will submit a Contract Schedule to the Engineer for review, as required by these Specifications within fifteen (15) calendar days of award. 6-1.2 CONTENT OF CONTRACT SCHEDULE The Contract Schedule, and any updated Contract Schedule, will meet the following requirements: 1. Schedules must be suitable for monitoring progress of the Work. 2. Schedules must provide necessary data about the time for the Engineer's decisions. 3. Schedules must be sufficiently detailed to demonstrate adequate planning for the Work. 4. Schedules must represent a practical plan to complete the Work within the Contract Time. 5. Schedules must show the critical path method for completing the Work. The Engineer's review of the form and general content of the Contract Schedule and any updated Contract Schedules is only for the purpose of determining if the listed requirements are satisfied, nothing more. 6-1.3 EFFECT OF CONTRACT SCHEDULE The Contract Schedule, and any updated Contract Schedules, will represent a practical plan to complete the Work within the Contract Time. Extension of any schedule beyond the Contract Time will not be acceptable. Schedules showing the 11-B-11 Agreement No. 5975 Work completed in less than the Contract may be acceptable if judged by the Engineer to be practical. Acceptance of such a schedule by the Engineer will not change the Contract Time. The Contract Time, not the Contract Schedule, will control in determining liquidated damages payable by the Contractor and in determining any delay. If a schedule showing the Work completed in less than the Contract Time is accepted, the Contractor will not be entitled to extensions of the Contract Time for Excusable Delays or Compensable Delays or to adjustments of the Contract Sum for Compensable Delays until such delays extend the completion of the Work beyond the expiration of the Contract Time. The Contractor will plan, develop, supervise, control, and coordinate the performance of the Work so that its progress and the sequence and timing of Work activities conform to the current accepted Contract Schedule. The Contractor will continuously obtain from Subcontractors information and data about the planning for and progress of the Work and the delivery of equipment, will coordinate and integrate such information and data into updated Contract Schedules, and will monitor the progress of the Work and the delivery of equipment. The Contractor will act as the expeditor of potential and actual delays, interruptions, hindrances, or disruptions for its own forces and those forces of Subcontractors. The Contractor will cooperate with the Engineer in developing the Contract Schedule and updated Contract Schedules. The Engineer's review and comments about any schedule or scheduling data will not relieve the Contractor from its sole responsibility to plan for, perform, and complete the Work within the Contract Time. Review and comments about any schedule will not transfer responsibility for any schedule to the Engineer or the City nor imply their agreement with (1) any assumption upon which such schedule is based or (2) any matter underlying or contained in such schedule. The Engineer's failure to discover errors or omissions in schedules that have been reviewed, or to inform the Contractor that the Contractor, Subcontractors, or others are behind schedule, or to direct or enforce procedures for complying with the Contract Schedule will not relieve the Contractor from its sole responsibility to perform and complete the Work within the Contract Time and will not be a cause for an adjustment of the Contract Time or the Contract Sum. The Contractor will perform the Work in accordance with the currently accepted Contract Schedule. 6-1.4 COMMENCEMENT OF CONTRACT TIME The Contract Time will commence when the City issues a Notice to Proceed. The Work will start on the date specified in the Notice to Proceed and within a maximum of fifteen (15) calendar days after the date of the Notice to Proceed, and be diligently prosecuted to completion with the time provided in the Specifications. 6-4 DF:FAI;1L'Im BY CONTRACTOR II -B-12 Agreement No. 5975 The language in subsection 6-4 is deleted in its entirety and replaced with the following subsections. 6-4.1 GENERAL Should the Contractor fail to begin delivery of material and equipment, to commence the Work within the time specified, to maintain the rate of delivery of material, to execute the Work in the manner and at such locations as specified, or fail to maintain the Work schedule (as determined by the current accepted Contract Schedule) which will ensure the City's interest, or if the Contractor is not carrying out the intent of the Contract, the City may serve written notice upon the Contractor and the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. 6-4.2 TERMINATION OF CONTRACTOR'S CONTROL OVER THE WORK„ The City may terminate the Contractor's control over the Work without liability for damages when, in the City's opinion, the Contractor is not complying in good faith, has become insolvent, or has assigned or Subcontracted any part of the Work without the City's consent. Should such termination occur, the Contractor will be paid the actual amount due based on Contract Unit Prices or lump sums bid and the quantity and quality of the Work completed at the time of termination, less damages caused to the City by the Contractor's action or inaction. In the event of such termination of control, the City may do any one, or combination of, the following: 1. Serve written notice upon the Surety on its Faithful Perfonnance Bond demanding satisfactory compliance with the Contract. In such event the Surety will, within 5 days, assume control and perform the Work as successor to the Contractor; 2, The City may perform the Work itself and deduct the cost thereof from any payment due to the Contractor; 3, The City may replace the Contractor with a different Contractor to complete the work and deduct the cost thereof from any payment due to the Contractor. Nothing herein will waive, or serve as a limitation upon, any additional remedy the City may have under these Contract Documents or applicable law. 6-4.3 SURETY'S ASSUMPTION OF CONTROL Should the Surety assume any part of the Work, it will take the Contractor's place in all respects for that part, and will be paid by the City for all work performed by it in accordance with the Contract. If the Surety assumes the entire Contract, all money due the Contractor at the time of its default will be payable to the Surety as the Work progresses, subject to the terms of the Contract. If the Surety does not assume control and perform the Work within 5 days after 11-B-13 Agreement No. 5975 receiving notice of cancellation, or fails to continue to comply, the City may exclude the Surety from the premises. The City may then take possession of all material and equipment and complete the Work by City's forces, by letting the unfinished work to another Contractor, or by a combination of such methods. In any event, the cost of completing the Work will be charged against the Contractor and its Surety and may be deducted from any money due or becoming due from the City. If the sums due under the Contract are insufficient for completion, the Contractor or Surety will pay to the City within 5 days of completion, all costs in excess of the sums due. The provisions of this subsection will be in addition to all other rights and remedies available to the City under applicable law. 6-6 DELAYS AND EXTENSIONS OF TIME Subsection 6-6 is deleted in its entirety and replaced with the following subsections. 6-6.1 GENERAL If delays are caused by unforeseen events beyond the control of the Contractor, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor will not be entitled to damages or additional payment due to such delays except as otherwise provided herein. Excusable delay may include: war, earthquakes exceeding 3.5 on the Richter Scale, government regulation, labor disputes outside the contemplation of the parties, strikes outside the contemplation of the parties, fires, floods, changes to the Work as identified herein, or other specific events that may be further described in the Specifications. Delays to the project caused by labor disputes or strikes involving trades not directly related to the project, or involving trades not affecting the project as a whole will not warrant an extension of time. The City will not grant an extension of time for a delay by the Contractor's inability to obtain materials unless the Contractor furnishes to the Engineer documentary proof. The proof must be provided in a timely manner in accordance with the sequence of the Contractor's operations and accepted construction schedule. Should delays be caused by events other than those included herein, the Engineer may, but is not required to, deem an extension of time to be in the City's best interests. 6-6.2 EXTENSIONS OF TINIE If granted, extensions of time will be based upon the effect of delays to the critical path of the Work as determined by the current accepted Contract Schedule. Delays to minor portions of the Work that do not affect the critical path will not be eligible for extensions of time. 6-6.3 PAYMENT FOR DELAYS TO CONTRACTOR II -B-14 Agreement No. 5975 Any payment for compensable delay will be based upon actual costs as set forth in Subsection 5-5 excluding, without limitation, what damages, if any, the Contractor may have reasonably avoided. The Contractor understands that this is the sole basis for recovering delay damages and explicitly waives any right to calculate daily damages for office overhead, profit, or other purported loss, using different formulas including, without limitation, the Eichleay Formula. 6-6.4 WRITTEN NOTICE: AND REPORT If the Contractor desires payment for a delay or an extension of time, it will give the Engineer written notice of such request not later than the time limit set forth in the Proposal for submitting a claim after the event or occurrence giving rise to a delay claim. Failure to submit a written request within such amount of time will result in the Contractor waiving its delay claim. Any claim for payment or an extension of time must be in the form required by the "Claims" sections of these Specifications. In no event will the City grant the Contractor an extension of time if the delay is within the Contract Time as identified by the Contract Documents. 6-7.2 WORK DAYS AND WORKING HOURS City Hall is open from Monday thru Thursday 7am-5pm and alternating Fridays 7am-4pm. It is closed on the following holidays: New Year's Day Martin Luther King, Jr. Day President's Day Memorial Day Independence Day Labor Day Veterans' Day Thanksgiving Christmas Eve Christmas New Year's Eve - Wednesday, January 1, 2020 - Monday, January 20, 2020 - Monday, February 17, 2020 - Monday, May 25, 2020 - Saturday, July 4, 2020 - Monday, September 7, 2020 - Wednesday, November 11, 2020 - Thursday, November 26, 2020 - Thursday, December 24, 2020 - Friday, December 25, 2020 - Thursday, December 31, 2020 Working on alternate Fridays when City Hall is closed is acceptable. If the Contractor, however, requests an inspection a day when City Hall is closed, then the Contractor will have to reimburse the City for the costs of inspection. The Contractor must request such an inspection at least 48 hours in advance. City inspections during hours when City Hall is closed are subject to inspection overtime fees to be paid for by the Contractor. Friday work that does not require inspection can be done without an inspection fee and must be discussed with City staff before its occurrence. If the Contractor does construction on a Friday or a day when City Hall is closed, that day is counted as a project working day. On workdays, Contractor's activities will be confined to the hours between 7:00 11-B-15 Agreement No. 5975 a.m. and 4:00 p.m. Please see Section 6-7.5 below for weekend and holiday work restrictions. 6-7.4 NIGHT WORK The following paragraph is added to Section 6-7 of the Greenbook: The City will not permit Work between the hours of 4 p.m. and 7 a.m. of the following day unless specifically provided for in the bid documents or unless the Contractor receives prior written approval. 6-7.5 WEEKEND AND 11OLIDAY WORK The Engineer may, but is not required to, allow the Contractor to work on Saturdays, Sundays and City Holidays. 6-8 COMPLETION AND ACCEPTANCE Subsection 6-8 of the Greenbook is deleted in its entirety and replaced by the following: The Work will be inspected by the Engineer for acceptance upon the Engineer receiving the Contractor's written assertion that the Work is complete. If, in the Engineer's judgment, the Work is complete and is ready for acceptance, the Engineer will accept the Work on behalf of the City in the manner prescribed by the City. The Engineer will recommend approval of the Notice of Completion to the City Council. This will be the date when the Contractor is relieved from responsibility to protect the Work. All work will be guaranteed by the Contractor against defective workmanship and materials furnished by the Contractor for a period of 1 year from the date the Work was completed. The Contractor will replace or repair any such defective work in a manner satisfactory to the Engineer, after notice to do so from the Engineer, and within the time specified in the notice. If the Contractor fails to make such replacement or repairs within the time specified in the notice, the City may perform this work and the Contractor's sureties will be liable for the cost thereof. 6-8.1 GENERAL GUARANTY The Contractor will remedy any defects in the work and pay for any damage to other work resulting therefrom, which will appear within a period of one year from the date of final acceptance of the work unless a longer period is specified. The owner will give notice of observed defects with reasonable promptness. 6-9 LIQUIDATED DAMAGES Subsection 6-9, Liquidated Damages, of the Greenbook is deleted in its entirety and replaced by the following subsections. Il -B-16 Agreement No. 5975 6-9.1 FAILURE TO COMPLETE WORK ON TIME If all the work called for under the Contract is not completed before or upon the expiration of the Contract Time, the City will sustain damage. Since it is and will be impracticable to detennine the actual damage which the City will sustain in the event of and by reason of such delay, it is therefore agreed that the Contractor will pay to the City the sum specified in the Proposal for each and every calendar day beyond the time prescribed to complete the work not as a penalty, but as a predetermined liquidated damage. The Contractor agrees to pay such liquidated damages as are herein provided, and in case the same are not paid, agrees that the City may deduct the amount thereof from any money due or that may become due to the Contractor under the Contract. Unless otherwise specified, liquidated damages will be $250 per calendar day. 6-11 DISPUTES AND CLAIMS; PROCEDURE 6-11.1 GENERAL Consistent with PCC § 10240.6, "Claim" means a written demand or assertion by the Contractor that seeks an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents, including a determination of disputes or matters in question between the City and the Contractor arising out of or related to the Contract Documents or the performance of the Work, and claims alleging an unforeseen condition or an act, error, or omission by the City, the Engineer, their agents or employees. "Claim" does not mean, and the Claims procedures herein do not apply, to the following: 1. Claims respecting penalties for forfeitures prescribed by statute or regulations, which a government agency is specifically authorized to administer, settle, or determine. 2. Claims respecting personal injury, death, reimbursement, or other compensation arising out of or resulting from liability for personal injury or death. 3, Claims respecting a latent defect, breach of warranty, or guarantee to repair. 4. Claims respecting stop notices. If a Claim is subject to the Change Order procedures, the Claim arises upon the issuance of a written final decision denying in whole or in part the Contractor's Change Order Request. If a Claim is not subject to the Change Order Procedures, the Claim arises when the Contractor discovers, or reasonably should discover, the condition or event giving rise to the Claim. 6-11.2 FORM I1 -B-17 Agreement No. 5975 A Claim must include the following: 1. A statement that it is a Claim and a request for a decision. 2. A detailed description of the act, error, omission, unforeseen condition, event or other condition giving rise to the Claim. 3. If the Claim is subject to the Change Order procedures, a statement demonstrating that a Change Order Request was timely submitted and denied. 4. A detailed justification for any remedy or relief sought by the Claim, including to the extent applicable, the following: a) If the Claim involves extra work, a detailed cost breakdown claimed. The breakdown must be provided even if the costs claimed have not been incurred when the Claim is submitted. b) To the extent costs have been incurred when the Claim is submitted, the Claim must include actual cost records (including, without limitation, payroll records, material and rental invoices) demonstrating that costs claimed have actually been incurred. C) To the extent costs have not yet been incurred at the time the Claim is submitted, actual cost records must be submitted on a current basis not less than once a week during any periods costs are incurred. A cost record will be considered current if submitted within seven (7) calendar days of the date the cost reflected in the record is incurred. At the Engineer's request, claimed extra costs may be subject to further verification procedures (such as having an inspector verify the performance of alleged extra work on a daily basis). 5. If the Claim involves an error or omission in the Contract Documents: a) An affirmative representation that the error or omission was not discovered before submitting a bid for the Contract; and b) A detailed statement demonstrating that the error or omission reasonably should not have been discovered by the Contractor, its Subcontractors and suppliers, before submitting a bid for the Contract. 6. If the Claim involves an extension of the Contract Time, written documentation demonstrating the Contractor's entitlement to a time extension. 7. If the Claim involves an adjustment of the Contract Sum for delay, written documentation demonstrating the Contractor's entitlement to such an adjustment. 11-B-18 Agreement No. 5975 & A personal certification from the Contractor that reads as follows: "I, , BEING THE (MUST BE AN OFFICER) OF (CONTRACTOR NAME), DECLARE UNDER PENALTY OF PERJURY UNDER CALIFORNIA LAW, AND DO PERSONALLY CERTIFY AND ATTEST THAT I HAVE THOROUGHLY REVIEWED THE ATTACHED CLAIM FOR ADDITIONAL COMPENSATION OR EXTENSION OF TIME, AND KNOW ITS CONTENTS, AND SAID CLAIM IS MADE IN GOOD FAITH; THE SUPPORTING DATA IS TRUTHFUL AND ACCURATE; THAT THE AMOUNT REQUESTED ACCURATELY REFLECTS THE CONTRACT ADJUSTMENT FOR WHICH THE CONTRACTOR BELIEVES CITY IS LIABLE; AND, FURTHER, THAT I AM FAMILIAR WITH CALIFORNIA PENAL CODE § 72 AND CALIFORNIA GOVERNMENT CODE § 12650, ET SEQ., PERTAINING TO FALSE CLAIMS, AND FURTHER KNOW AND UNDERSTAND THAT SUBMITTING OR CERTIFYING A FALSE CLAIM MAY LEAD TO FINES, IMPRISONMENT, AND OTHER SEVERE LEGAL CONSEQUENCES." 6-11.3 CLAIMS S(jBMIT"I"ED "1'O ENGINEER Within thirty (30) calendar days after the circumstances giving rise to a Claim occur, the Contractor will submit its Claim to the Engineer for a decision. Regardless of any Claim submittal, or any dispute regarding a Claim, unless otherwise directed by the Engineer, the Contractor will not cause any delay, cessation, or tennination of the Work, but will diligently proceed with the performing the Work in accordance with the Contract Documents. Except as otherwise provided, the City will continue to make payments in accordance with the Contract Documents. 6-11.4 CLAIM IS P EREOUISITE TO OT°HER REMEDY The Contractor certifies that it is familiar with PCC § 10240.2 and understands and agrees that submitting a Claim in accordance with these Specifications is an express condition precedent to the Contractor's right to otherwise pursue a claim whether through alternative dispute resolution or by litigation. Should the Contractor fail to submit a claim in accordance with these Specifications, including the time limits set forth herein, it will waive any right to a remedy, whether in law or equity, it might otherwise have pursuant to the Contract Documents or applicable law. 6-11.5 DECISION ON CLAIMS The Engineer will promptly review Claims submitted by the Contractor in accordance with these Specifications. Should the Engineer require additional supporting evidence to evaluate the claim, the Engineer will request such additional information in writing. Any such requested data will be furnished not later than ten (10) calendar days after the Contractor receives the Engineer's request. The Engineer will render a decision not later than thirty (30) days after either 1I -B-19 Agreement No. 5975 receiving the Claim or the deadline for furnishing additional supporting data, whichever is later. If the Claim amount is more than $50,000, the time period will be extended to sixty (60) days. If the Engineer fails to render a decision within the time period established herein, then the Claim will be deemed denied. The Engineer's decision will be final and binding unless appealed in accordance with these Specifications. The Engineer's decision on a Claim will include a statement substantially as follows: "This is a decision pursuant to the General Specifications of your Contract. If you are dissatisfied with the decision, and have complied with the procedural requirements for asserting claims, you may have the right to alternative dispute resolution or litigation. Should you fail to take appropriate action within thirty (30) calendar days of the date of this decision, the decision will become final and binding and not subject to further appeal." 6-11.6 APPEAL OF ENGINEER'S DECISION Should the Contractor dispute the Engineer's decision, then the Contractor must appeal that decision to the City's Public Works Director within thirty (30) calendar days of receiving the Engineer's decision. The Public Works Director will address disputes or claims within thirty (30) calendar days after receiving such request and all necessary supporting data. The Public Works Director's decision on the dispute or claim will be the City's final decision. If the Contractor disputes the Public Works Director's decision, then the Contractor must demand alternative dispute resolution in accordance with this Section and the PCC within thirty (30) calendar days of the City's final decision. 6-11.7 MEDIATION If the City and the Contractor agree, disputes between the parties may be submitted to non-binding mediation. If the parties cannot agree to an alternative form of mediation, then mediation will be administered by the American Arbitration Association ("AAA") under its Construction Industry Mediation Rules, unless the use of such rules are waived by mutual stipulation of both parties. The parties may, but are not required to be, represented by counsel in mediation. The requirement for mediation will not alter or modify the time limitations otherwise provided for claims and no conduct or settlement negotiation during mediation will be considered a waiver of the City's right to assert that claim procedures were not followed. 6-11.8 ARBITRATION II -B-20 Agreement No. 5975 If the City and Contractor do not agree to mediation, then a disputes will be submitted to neutral non-binding (except as provided herein) arbitration. Arbitration will be conducted in accordance with PCC § 10240.3. Any decision rendered by an arbitrator will be consistent with PCC § 10240.8. The exclusive venue for any arbitration will be in Los Angeles County. The expenses and fees of the arbitrators and the administrative fees, if any, will be divided among the parties equally. Each party will pay its own counsel fees, witness fees, and other expenses incurred for its own benefit. 6-11.9 W1-IEN ARBIT"RATIO'N DECISION 13ECOMES BINDING The decision rendered by the arbitrator will become binding upon the parties unless appealed to the Los Angeles County Superior Court pursuant to PCC § 10240.12 within thirty (30) calendar days of the decision. If subsequent litigation results in an award to the party appealing the arbitration that is less than or equal to that of the arbitration decision, or if the litigation results in a decision in favor of the nonappealing party, then the party appealing the arbitration will pay the nonappealing party's attorney's fees and court costs. 6-11.10 APPEAL TO LJPERlOR `OURT: WAIVER OF JURY TRIAL Should a party timely object to the arbitration decision, it may file a petition with the Los Angeles County Superior Court in accordance with California Code of Civil Procedure ("CCP") §§ 1285, et seq. Notwithstanding the limitations set forth in CCP § 1286.2, the court may vacate, correct, or adjust an arbitration award, and enter judgment in accordance with CCP § 1287.4, for any legal or equitable basis including, without limitation, error of law. The court will apply the substantial evidence standard of review when considering the appeal of an objecting party. BY EXECUTING THESE CONTRACT DOCUMENTS, THE CONTRACTOR AGREES TO HAVE DISPUTES OR CONTROVERSY CONCERNING THE CONSTRUCTION, INTERPRETATION, PERFORMANCE, OR BREACH OF THESE CONTRACT DOCUMENTS, INCLUDING CLAIMS FOR BREACH OF CONTRACT OR ISSUES OF BAD FAITH DECIDED IN ACCORDANCE WITH THIS SECTION 6-11. BOTH THE CITY AND THE CONTRACTOR WAIVE THEIR RIGHT TO A JURY TRIAL FOR THESE DISPUTES OR ISSUES. 6-11.11 AB 626 CLAIMS: PROCESS Claims made by a Contractor for one or more of the following are subject to the claim resolution process set forth in Public Contract Code section 9204: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by the city under a contract for a public works project. (B) Payment by the city of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project II -B-21 Agreement No. 5975 and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the city. 7-2 LABOR The following subsections are added to Subsection 7-2 of the Greenbook. 7-2.3 PREVAILING WAGES The Contractor will post at appropriate conspicuous points at the site of the project a schedule showing determinations of the Director of Industrial Relations of the prevailing rate of per diem wages. It will be the Contractor's responsibility to obtain copies of the prevailing rate of per diem wages. One source that may be used is the California Department of Industrial Relations website which is currently located at www.dir.ca.gov, or by calling the Prevailing Wage Unit at (415) 703-4774. Attention is directed to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by the Contractor or any Subcontractor. Labor Code § 1777.5 requires the Contractor or Subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the Public Works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the Contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except: a) When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the ninety (90) calendar days before the request for certificate, or b) When the number of apprentices in training in the area exceeds a ratio of one to five, or C) When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or d) When the Contractor provides evidence that the Contractor employs regis- tered apprentices on all of his Contracts on an annual average of not less than one apprentice to eight journeymen. The Contractor is required to make contributions to funds established for the administration of apprenticeship programs if the Contractor employs registered apprentices or journeymen in any apprenticeable trade on such Contracts and if other Contractors on the Public Works site are making such contributions. The Contractor and any Subcontractor will comply with Labor Code § § 1777.5 and 1777.6 in the employment of apprentices. II -B-22 Agreement No. 5975 Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex -officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. ' 7-2.4 RECORD OF WAGES PAID: INSPECTION Every Contractor and Subcontractor will keep an accurate certified payroll records showing the name, occupation, and the actual per them wages paid to each worker employed in connection with the Work. The record will be kept open at all reasonable hours to the inspection of the body awarding the Contract and to the Division of Labor Law Enforcement. If requested by the City, the Contractor will provide copies of the records at its cost. 7-3 IIABJLITY INSLJRA.NCE Subsection 7-3, Liability Insurance, of the Greenbook is deleted in its entirety and replaced by the following subsections. 7-3.1 GENERAL Contractor must procure and maintain for the duration of the Contract the following insurance coverages and limits against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the work covered by this agreement by the Contractor, its agents, representatives, employees or Subcontractors: COVERAGE PER OCCURRENCE Comprehensive General Liability Business Auto Workers' Compensation ISO FORM CL 00 02 01 85 or 88 CA 00 0101 87 COMBINED SINGLE LIMIT $2,000,000 $1,000,000 Statutory Contractor will provide endorsements or other proof of coverage for contractual liability. Combined single limit per occurrence will include coverage for bodily injury, personal injury, and property damage for each accident. If Commercial General Liability Insurance or other form with a general aggregate limit is used, the policy will be endorsed such that the general aggregate limit will apply separately to this Contract and a copy of the endorsement provided to the City. Liability policies will contain, or be endorsed to contain the following provisions: 11-B-23 Agreement No. 5975 GENERAL LIABILITY AND AUTOMOBILE LIABILITY: The City, its officers, officials, employees, agents, and volunteers will be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the Contractor; premises owned, occupied or used by the Contractor; or automobiles owned, leased, hired or borrowed by the Contractor. The coverage will contain no special limitations on the scope or protection afforded to the City, its officers, officials, employees, agents, or volunteers. The Contractor's insurance coverage will be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents, and volunteers will be excess of the Contractor's insurance and will not contribute with it. The insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. Any failure to comply with reporting provisions of the policies will not affect coverage provided to the City, its officers, officials, employees, agents and volunteers. The Contractor's insurance will apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. WORKER'S COMPENSATION: The insurer will agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. ALL COVERAGES: Each insurance policy required by this subsection will be endorsed to state that coverage will not be suspended, voided, cancelled by either party, reduced in coverage or in limits except after thirty (30) calendar days written notice by certified mail, return receipt requested, has been given to: CITY CLERK City of El Segundo 350 Main Street El Segundo, CA 90245 Notwithstanding the foregoing, the endorsement may state that insurance may be cancelled upon ten (10) calendar day notification for non-payment of premium. The Contractor will provide the City with updated proof of insurance should the Contract Time extend beyond the policy expiration date. II -B-24 Agreement No. 5975 All liability insurance will be on an occurrence basis. Insurance on a claims made basis will be rejected. Any deductibles or self-insured retentions will be declared to and approved by City. The insurer will provide an endorsement to City eliminating such deductibles or self-insured retentions as respects the City, its officials, employees, agents, and volunteers. Except for Workers Compensation Insurance, Contractor will furnish to City certificates of insurance and endorsements on forms acceptable to the City's City Attorney, duly authenticated, giving evidence of the insurance coverages required in this Contract and other evidence of coverage or copies of policies as may be reasonably required by City from time to time. Endorsements must be supplied on ISO Form No. CG 20 10 11 85, or equivalent. Certificate/endorsement for Workers Compensation Insurance will be furnished on State Comp Fund or other industry standard form. Except for worker's compensation insurance, all insurance required herein will be placed with insurers with a Best's Rating of not less than A:VII. Worker's compensation insurance policies will meet the requirements of California law. All Subcontractors employed on the work referred to in this Contract will meet the insurance requirements set forth for Contractor. Contractor will furnish certificates of insurance and endorsements for each Subcontractor at least five days before the Subcontractor entering the job site, or Contractor will furnish City an endorsement including all Subcontractors as insureds under its policies. Except as provided in Subsection 6-10, the Contractor will save, keep and hold harmless the City, its officers, officials, employees, agents and volunteers from all damages, costs or expenses in law or equity that may at any time arise or be claimed because of damages to property, or personal injury received by reason of or in the course of performing work, which may be caused by any willful or negligent act or omission by the Contractor or any of the Contractor's employees, or any Subcontractor. The City will not be liable for any accident, loss or damage to the work before its completion and acceptance, except as provided in Subsection 6-10. The cost of such insurance will be included in the various items of work in the Contractor's bid and no additional compensation for purchasing insurance or additional coverage needed to meet these requirements will be allowed. In the event that any required insurance is reduced in coverage, cancelled for any reason, voided or suspended, Contractor agrees that City may arrange for insurance coverage as specified, and Contractor further agrees that administrative and premium costs may be deducted from payments due to the Contractor. Contractor will not be allowed to work until alternate coverage is arranged. Coverage will not extend to any indemnity coverage for the active negligence of the additional insured if the agreement to indemnify the additional insured would be invalid under Civil Code § 2782(b). 7-3.2 INDEMNIFICATION ANIS DEFENSE II -B-25 Agreement No. 5975 In addition to the provisions of Subsection 7-3 of the Greenbook as between the City and Contractor, Contractor will take and assume all responsibility for the work as stated herein or shown on the plans. The Contractor will bear all losses and damages directly or indirectly resulting to it, to the City, its officers, employees, and agents, or to others on account of the performance or character of the work, unforeseen difficulties, accidents, traffic control, job site maintenance, or any other causes whatsoever. The Contractor will assume the defense of and indemnify and save harmless the City of El Segundo, its officers, employees, and agents, from and against any and all claims, losses, damage, expenses and liability of every kind, nature, and description, directly or indirectly arising from the performance of the Contract or work, regardless of responsibility for negligence, and from any and all claims, losses, damage, expenses, and liability, howsoever the same may be caused, resulting directly, or indirectly from the nature of the work covered by the Contract, regardless of responsibility for negligence, to the fullest extent permitted by law. In accordance with Civil Code § 2782, nothing in this Subsection 7-3.2 or in Subsection 7-3 of the Standard Specifications will require defense or indemnification for death, bodily injury, injury to property, or any other loss, damage or expense arising from the sole negligence or willful misconduct of the City, or its agents, servants or independent Contractors who are directly responsible to the City, or for defects in design furnished by such persons. Moreover, nothing in this Subsection 7-3.2 or in Subsection 7-3 will apply to impose on the Contractor, or to relieve the City from, liability for active negligence of the City. The City does not, and will not, waive any rights against the Contractor which it may have by reason of the aforesaid hold harmless agreements because of the acceptance by the City, or deposit with City by Contractor, of any insurance policies described in Subsection 7-3 of the Special Provisions. This hold harmless agreement by the Contractor will apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered by reasons of any of the aforesaid operations of Contractor, or any Subcontractor, regardless of whether or not such insurance policies are determined to be applicable to any of such damages or claims for damages. No act by the City, or its representatives in processing or accepting any plans, in releasing any bond, in inspecting or accepting any work, or of any other nature, will in any respect relieve the Contractor or anyone else from any legal responsibility, obligation or liability he might otherwise have. 7-5 PERMITS The following paragraph will be added to Subsection 7-5 of Greenbook: The Contractor will apply for permits required by the City. These permits will be issued on a "no -fee" basis. However, the Contractor must pay for and obtain all other permits from other governmental and utility agencies necessitated by their operations. 11-B-26 Agreement No. 5975 All bonding fees, (overweight and oversized vehicle permit fees) inspection permit fees or other fees charged or required for such permits must be paid by the Contractor. These costs will be included in the bid item provided. If no bid item is included, costs will be included in the various items of work, and no additional payment will be allowed. 7-8.1 CLEANUP AND Dl.IS°.I. CONTROL Subsection 7-8.1, Cleanup and Dust Control, of the Greenbook is deleted in its entirety and replaced by the following subsections. 7-8.1.1 GENERAL On any construction project requiring trenching within public streets and for which total trenching is in excess of 500 feet, the Contractor will be required to sweep the worksite utilizing a pick-up type street sweeper a minimum of once daily. 7-8.1.2 WATERING Water for dust control caused by Contractor's operations or the passage of traffic through the work will be applied as necessary or as directed by the Engineer. Water for the above or other purposes may be obtained from any approved source. If the Contractor chooses to use a City fire hydrant upon placing deposits and fees as described in this Contract, the Engineer will cause a meter to be installed. All water used from the hydrant will be metered and charged to the Contractor at the prevailing rate plus the current daily meter rental rate. The Contractor will be charged a $15 reconnect fee if the Contractor wishes to move the meter to a different hydrant. Costs of water to be used will be included in the cost of various bid items. 7-8.6 WATER POLLUTION CONTROL The following requirements are added to establish storm water and urban runoff pollution prevention controls. (a) Storm or construction generated water containing sediment such as, construction waste, soil, slurry from concrete/asphalt concrete saw cutting operations, clean up of concrete transit mixers or other pollutants from construction sites and parking areas will be retained or controlled on site and will not be permitted to enter the storm drain system. (b) Temporary sediment filtering systems such as sandbags, silt fences, or gravel berms will be utilized to trap sediment so that only filtered water enters the City's storm drain system. Proper clean up and disposal of settled sediment and the filtering system will be the responsibility of the Contractor. (c) Discharge of concrete transit mixer wash water on to approved dirt areas (sub -grade area designated for new concrete construction for example) is acceptable. Discharge on to private property, parkway areas, or the street is not permitted. II -B-27 Agreement No. 5975 (d) Plastic or other impervious covering will be installed where appropriate to prevent erosion of an otherwise unprotected area, along with any other runoff control devices deemed appropriate by the City. (e) Excavated soil stored on the site will be covered in a manner that minimizes the amount of sediments running into the storm drain system, street or adjoining properties. (f) No washing of construction or other industrial vehicles and equipment will be allowed adjacent to a construction site. During the rainy season (October 15 to April 15), Contractor will keep at the construction site sufficient materials and labor to install temporary sediment filtering systems and other water pollution prevention control measures. These control measures will be in place and maintained by the Contractor on a daily basis on days when construction is not in progress due to rain. (h) All costs associated with water pollution control will be borne by the Contractor. Any expense incurred by the City to expeditiously respond to storm drain contamination resulting from Contractor's failure to implement water pollution control measures will be charged to the Contractor. 7-9 PROTECTION AND RESTORATION OF EXISTING IM11ROVEMEN'TS The following requirements are added to Section 7-9. Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectively reduced by the Contractor's operations, such striping or markings will also be considered as existing improvements and the Contractor will replace such improvements. Relocations, repairs, replacements, or re -establishments will be at least equal to the existing improvements and will match such improvements in finish and dimensions unless otherwise specified. 7-10 PUBLIC CONVENIENCE AND SAFETY The following requirement is added to Section 7-10: Unless otherwise specified all traffic control will be performed in accordance with the Work Area Traffic Control Handbook (WATCH) Latest Edition, published by Building News. 7-10.1 TRAFFIC AND ACC ESS The Contractor will notify the occupants of all affected properties at least 48 hours before any temporary obstruction of access. Vehicular access to property line will be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer. II -B-28 Agreement No. 5975 At least one (1) twelve (12) foot wide traffic lane will be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The traffic lanes will be maintained on pavement, and will remain unobstructed. All work requiring that a lane be closed or a lane moved right or left will be noticed to the traveling public by use of City approved lighted arrow boards. Clearances from traffic lanes will be five (5) feet to the edge of any excavation and two (2) feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction. One four (4) foot wide paved pedestrian walkway will be maintained in the parkway area on each side of all streets. The clearance from the pedestrian walkway to any traffic lane will be five (5) feet. Pedestrians and vehicles will be protected from all excavations, material storage, and/or obstructions by the placement of an adequate number of lighted barricades (minimum two (2)) at each location, one (1) at each end of the obstruction or excavation), which will have flashing lights during darkness. Barricades will be Type I or Type II per Section 7-3 of the WATCH Manual and lights will be Type A per Section 7-6 of the "Work Area Traffic Control Handbook" (WATCH). 7-10.2 ,"TREE"1" CLOSURES. DEJ'.O RS. BARRICADES Street closures will not be allowed except as specifically permitted by the Engineer. The Contractor will prepare any traffic control or detour plans that may be required as directed by the Engineer. Lane transitions will not be sharper than a taper of thirty (30) to one (1). Temporary traffic channelization will be accomplished with barricades or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor will prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed on finish pavement surfaces, which are to remain. Where access to driveway or street crossings need to be maintained, minimum 1 1/4 inch thick steel plating will be used to bridge the trench. All steel plating will have temporary asphalt concrete 1:12 minimum sloped ramps to assist vehicles to cross comfortably over the plates and have a non-skid surface. Plates subject to vehicle high traffic speeds and in residential areas will be secured by welding at the discretion of the Engineer. 7-10.5 PROTECTION 01. TFIE PU131-1C It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor will use foresight and will take such steps and precautions as his operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public service, or from the failure of partly completed work or partially removed facilities. Unusual 11-B-29 Agreement No. 5975 conditions may arise on the Project which will require that immediate and unusual provisions be made to protect the public from danger or loss of life, or damage to life and property, due directly or indirectly to prosecution of work under this Contract. Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor's operations and when, in the opinion of the Engineer, immediate action will be considered necessary in order to protect the public or property due to the Contractor's operations under this Contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation immediately, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be fiimished as, in the opinion of the Engineer, may seem reasonable and necessary. The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, will be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. Such remedial measures by the City will not relieve the Contractor from full responsibility for public safety. 7-15 HAZARDOUS MATERIAL, The following Subsection will be added to Section 7 of the Greenbook: For any excavation, which extends more than four feet below existing grade, the Contractor will promptly, and before the conditions are disturbed, notify the Engineer, in writing, of 1) any material that the Contractor believes may be hazardous waste, as defined in Health and Safety Code § 25117, which is required to be removed to a Class I, Class Il, or Class III disposal site in accordance with provisions of existing law, 2) subsurface or latent physical conditions at the site differing from those indicated, or 3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. After receiving notice from the Contractor, the Engineer will promptly investigate any condition identified by the Contractor as being hazardous. The rights and obligations of the City and the Contractor with regard to such conditions (including, without limitation, the procedures for procuring change orders and filing claims) will be specified by the provisions of Subsection 3-4 (Changed Conditions) of the Greenbook. If a dispute arises between the City and the Contractor whether the conditions materially differ, involve hazardous waste, or cause a change in the Contractor's cost or time required for performance of the work, the Contractor will not be excused from any scheduled completion date provided for by the Contract, but will proceed with all work to be performed under the Contract. The Contractor will II -B-30 Agreement No. 5975 retain all rights provided by Subsection 3-5, Disputed Work, of the Greenbook If the Engineer determines that material called to the Engineer's attention by the Contractor is hazardous waste, or if the Engineer otherwise discovers the existence of hazardous waste, the Contractor will be responsible for removal and disposal of the hazardous waste by qualified personnel and appropriate equipment in the manner required by law as directed by the Engineer, subject to the provisions of Section 3 (Changes in Work) of the Greenbook. 9-2 I..UMP SLIM WORK Subsection 9-2, Lump Sum Work, of the Greenbook is deleted in its entirety and replaced by the following: Items for which quantities are indicated as "Lump Sum," "L.S.," or "Job" will be paid for at the price indicated in the Proposal. Such payment will be full compensation for all costs for labor, equipment, materials and plant necessary to furnish, construct and install the lump sum item of work, complete, in place, and for all necessary appurtenant work, including, but not limited to, all necessary cutting, patching, repair and modification of existing facilities, and clean up of site. Contractor will furnish three copies of a detailed schedule, which breaks down the lump sum work into its component parts and cost for each part, in a form and sufficiently detailed as to satisfy Engineer that it correctly represents a reasonable apportionment of the lump sum. This schedule is subject to approval by Engineer as to both the components into which the lump sum item is broken down, and the proportion of cost attributable to each component. This schedule will be the basis for progress payments for the lump sum work. 9-3.2 PARTIAL AND FINAL PAYMENTS The text of Subsection 9-3.2 of the Standard Specifications is deleted and replaced with the following: The closure date for the purpose of making partial progress payments will be the last working day of each month. The Contractor will prepare the partial payment invoice with measurement of the work performed through the closure date and submit it to the CITY for approval. When work is complete, the Contractor will determine the final quantities of the work performed and prepare the final progress payment, and submit it to the Engineer for approval. It will take a minimum of thirty-five (35) calendar days from the date of approving the Contractor's invoice to make the payment to the Contractor. However, payments will be withheld pending receipt of any outstanding reports required by the Contract documents, or legal release of filed Stop Payment Notices against the Contractor. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as -built 11-B-31 Agreement No. 5975 conditions. The full five percent (5%) retention will be deducted from all progress payments. The Contractor will make a payment request for the retained amount, for approval by the City, upon field acceptance of the work by the City Engineer. The City Engineer upon field acceptance and receipt of the final as -built plans and any other reports or documents required to be provided by the Contractor will process a recommendation to the City Council for acceptance of the work. Not less than thirty-five (35) calendar days from the City Council acceptance of the work, the Contractor's final payment will be made provided Stop Payment Notices or other claims have not been filed against the Contractor and/or the City by material suppliers, Subcontractors, other governmental agencies, and private property owners. Until these Stop Payment Notices are released and claims are resolved the stop payment/claim amount will be withheld from the final payment. The Contractor, however, may receive interest on the retention for the length of construction, or receive the retention itself as long as the retention is substituted with escrow holder surety or equal value. At the request and expense of the Contractor, surety equivalent to the retention may be deposited with the State Treasurer, or a State or Federally chartered bank, as the escrow agent, who will pay such surety to the Contractor upon satisfactory completion of the Contract. Pursuant to PCC § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, that any such election will be at the Contractor's own expense and will include costs incurred by the City to accommodate the Contractor's request. Progress payment paid by the City as contemplated herein, will be contingent upon the Contractor submitting, in addition to any additional documents, an updated Contract Schedule in the form prescribed by these Contract Documents. Failure of the Contractor to submit an acceptable updated Contract Schedule will result in the City withholding partial payment, without liability to the City, until such an acceptable updated Contract Schedule is submitted. Nothing herein will allow the Contractor to suspend or slow progress of the Work. A City Council resolution established a Project Payment Account, encumbered money in the current budget, and assigned that money to the Project Payment Account which is the sole source of funds available for payment of the Contract Sum. Contractor understands and agrees that Contractor will be paid only from this special fund and if for any reason this fund is not sufficient to pay Contractor, Contractor will not be entitled to payment. The availability of money in this fund, and City's ability to draw from this fund, are conditions precedent to City's obligation to make payments to Contractor. 9-3.3 DELIVERED MATERIALS Materials and equipment delivered or stored, but not incorporated into the work, 11-B-32 Agreement No. 5975 will not be approved for progress payments. 100-1 TERMINATION 0 F AG .N.0' 1m.1 A 131LITY Before receiving final payment, the Contractor will execute a "Release on Contract" form which will operate as, and will be a release to the City, the City Council, and each member of the City Council and their agencies, from all claims and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act of neglect of the City of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided in Subsections 9-3 of the Standard Specifications and except for any unsettled claims listed on said form which have been filed in compliance with the requirements for making claims. - END OF SECTION - 11-B-33 Agreement No. 5975 SECTION N III —SPECIAL PROVISIONS 1-0. CiENE A1_ SCO11E. TIMI;"' FOR CO.I PLETION. AIT LOCATION Ol-" %NIORK 1-1. General ;Scope of "\°ork: The work to be done consists of Roller Hockey Rink Improvements in the City of El Segundo and related work as shown on the plans with these specifications. Construction shall include but not limited to installation of dasher boards, drainage system, concrete rink and graphics. 1-2. Location of the Work: 401 Sheldon St., El Segundo, CA 90245 1-3. Working Days and Tinic log- (.:,yomla.,le,tic�n: 1. Contractor will commence work on date specified in the Notice to Proceed to be issued to the said Contractor by City of El Segundo Public Works Department and shall complete work within thirty (30) working days after the date of commencement. 2-0. NOTIFICATIONS 2-1. General The CONTRACTOR will notify all agencies listed here in a minimum of seventy- two (72) hours before start of operation. The following list of names and telephone numbers are intended for the convenience of the CONTRACTOR and the City does not guarantee either the completeness or correctness of this list. OPERATION OFFICE TELEPHONE 1. Start of work, Arianne Bola, Public Works Staff 310-524-2364 shutdown of work, Mark Watkins, Interim Director 310-524-2356 or resumption of of Public Works work after shutdown Lifan Xu, City Engineer 310-524-2368 2. Closing of streets El Segundo Police Department** 310-524-2200 El Segundo Fire Department** 310-524-2236 ** The CONTRACTOR will notify the Engineering Division before notifying these offices. 1I1 -A-1 Agreement No. 5975 The following information is provided for CONTRACTOR'S use to notify agencies if their facilities are affected by CONTRACTOR'S work: 1. City of El Segundo — Government Buildings 310-524-2713 2. City of El Segundo — Water Division 310-524-2742 3. City of El Segundo - Wastewater Division 310-524-2754 2-2. City Staff'Notificatioii The Contractor shall submit all required employee notices to the City at the pre - construction meeting for approval. The Contractor shall hand -deliver Notices to affected City staff regarding the work at least two (2) weeks before the project begins construction. Notices shall include the project times, dates, working hours, and description of project activities. If any changes occur to project times, dates or working hours, the Contractor will revise and re -deliver the Notice to affected City Staff. The Contractor shall also notify the Police Department, the Fire Department, the City street sweeper, the City waste hauler, and all utilities of the construction schedule and any changes to it. 2-3. PI.L.i Where street parking may need to be restricted, the Contractor shall post "TEMPORARY NO PARKING" signs on the curb 72 hours in advance of the construction, to alert motorists that parking shall not occur at the location and for what length of time. Signs placed shall be unobstructed and clearly visible from vehicles. Signs should be similar to those posted by City Public Works street maintenance staff. The signs are subject to the approval of the Engineer. The dates and times on the signs shall be site specific and shall cover the minimum time required for "NO PARKING" to facilitate construction. Generic long-term "NO PARKING" time designations are not acceptable. Parking shall not be restricted during any period when construction activity is not scheduled at this particular site. Staging location for construction related activities and/or equipment must first be approved by City Staff. 3-0. MOBILIZATION Mobilization shall conform to the provisions of Section 9-3.4 of the Standard Specifications. The scope of work under mobilization includes but is not limited to: 1. Moving on to the site of all Contractor's equipment required for operations. 2. Arranging for and erection of Contractor's work and storage yard. 3. Posting all OSHA required notices. 4. Submittal of Construction Schedule, Contractor Contact List, and Notices to City staff for City approval. III -A-2 Agreement No. 5975 5. Notification of employees and property owners. 6. Re -notification of employees and property owners for all construction schedule changes. 7. Bringing unforeseen field conditions to City staff's attention in a timely manner. 8. Restoration of private and public property to existing standard conditions upon demobilization. 9. Demobilization. 3-1 Demobilization shall include all activities for the Contractor to remove all equipment and construction debris from the project areas after construction is complete. Demobilization shall also include general cleanup activities and specific punch list items and cleanup activities determined by the City Public Works Inspector or City Representative, to repair or replace any private or public facilities damaged by the construction and return public facilities to the same or better condition as that existing prior to construction. 3-2 The Contractor shall be responsible for performing the following preparatory work: 1. Meeting with the project manager and City stakeholders in a pre -construction meeting. a. During this meeting, the Contractor shall present an initial proposed schedule and work plan. City staff shall present a schedule of events and a list of any restrictions that may affect the construction schedule. b. The Contractor shall also present Notices to the Public regarding the work to be done (refer to Notifications section). 2. Finalizing and submitting a final work plan for the Contract that will detail the contracted project tasks and schedule and also accommodates any information clarified in the pre -construction meeting. City approval is required on the work plan before a Notice to Proceed will be issued. 3. Clearing the construction area to be worked on of all loose material and other objectionable material as applicable. 4. Providing and setting up of temporary barriers and security devices, for protection of the employees and public. This includes but is not limited to: barricades, temporary No Parking, and/or temporary No Pedestrian Traffic signage in the vicinity of the project area. 5. Providing appropriate temporary signage including signage for exit or building egress if necessary during construction. 6. Maintaining open or unobstructed building egress paths during construction. 7. Maintaining building fire or life safety systems unless three days prior written notice is submitted to the City Public Works Department and approval is granted to disrupt or disable those systems temporarily. 8. Notifying City staff according to Notification requirements. III -A-3 Agreement No. 5975 3-3 The Contractor is responsible for performing demolition activities including but not limited to: 1. Conducting demolition to minimize interference with adjacent and occupied building areas. 2. Disconnecting and removing utilities within demolition areas, and replacing them after construction, if applicable. 3. Removing and properly disposing of demolished materials and construction debris from the site unless specifically noted otherwise. 4. Removing materials as the work progresses. Upon completion of daily work, leave areas in a clean condition. 5. Removing temporary work. 4-0 WORK SCII7DULE Contractor shall be responsible for including in the final work plan a workable construction schedule that incorporates the following conditions: 1. The schedule for the work is subject to the approval of the Public Works Department. 2. All work shall take place Monday through Friday between the following hours: 7:00 am to 4:00 pm 3. The Contractor shall coordinate all inspections and final sign -offs for permits and the project with Public Works Department. 5-0. STANDARDS Section 0-1 on page II -B-1 of these Specifications is supplemented by the following additional requirements: 1. All work shall be 2018 Standards Specifications for Public Works Construction (SSWPC) unless otherwise shown on the plans, technical specifications, or as specified herein. Submittal of a bid will be evidence that the Contractor is familiar and knowledgeable about these specifications. 2. Strict compliance with State and local safety codes will be enforced. 6-0. EXAMINATION OF JOB SITE The BIDDER shall make a detailed physical inspection of the site before submitting his proposal. It is understood that the BIDDER is satisfied regarding existing conditions and existing access conditions which may affect bid prices for the proposed work. III -A-4 Agreement No. 5975 7-0. INSPECTION Section 4-1.3 on page II -B-9 of these Specifications is supplemented by the following additional requirements: 1. On all questions relating to quantities, the acceptability of material, or work, the execution, progress or sequence of work, and the interpretation of specifications or plans, the decision of the Engineer is final and binding, and shall be precedent to any payment under the Contract. 2. All work and materials are subject to inspection and approval of the Engineer. 3. Legible copies of material/weight certification shall be turned over to the inspector on a daily basis. 4. Inspection of the work shall not relieve the Contractor of the obligations to fulfill all conditions of the Contract. 8-0. USE OF PRIVATE PROPERTY The use of any private property by the Contractor is prohibited, unless written approval is obtained from the City owner and the property owner. The prohibited uses include, but is not limited to the, Contractor's use of water, electricity or natural gas from private property, storage of material or equipment, and turning around/ parking of his vehicles on private property. 9-0. STORAGE OF, MAJ'ER1ALS AND EQQJPME'N1" 1. No material or equipment shall be stored in public right-of-way without prior approval from the Public Works Department. 2. The Contractor shall be responsible for obtaining a site for storage of material and equipment. The site shall not be within or adjoining the residential areas of the City. Site shall be subject to approval by the City. 3. The sites for stockpiling and batching materials shall be clean and free from objectionable material. 4. The City does not have nor does guarantee any designated property within the City for storage of materials. 5. If the Contractor finds a private property for storage of his materials, the Contractor shall furnish the City a letter of approval and a letter of release (at the end of the job and cleanup of the storage site) from the property owner for this purpose. 6. The Contractor shall adhere to Best Management Practices and NPDES requirements to protect the City right-of-way and storm drain system during construction. 7. Deliver all materials in their original containers with seals unbroken and manufacturer's label and product identification clearly legible on each package. III -A-5 Agreement No. 5975 Store all un -containerized materials at the site under adequate cover, maintaining them in a dry condition until ready for use. 10-0. DISPOSAL OF I�LMOVALS All removed materials shall become the property of the Contractor. Materials shall be legally discarded away from the site of work. Note: There are no authorized dump facilities within the City of El Segundo, 11-0. QUALITY ASSURANCE Contractors shall exercise due care to assure procurement, storage and placement of materials form site or offsite sources which will comply with the requirements, specifications and standards set out herein. Contractor may, at his discretion, have such tests and inspections as he may desire performed by qualified personnel or independent testing services, for his guidance and control of the work. 12-0. COMPLETION Upon completion of work, the Contractor shall conduct careful inspection with the City Inspector and shall correct all defective work to the satisfaction of the Owner. The Contractor shall coordinate all inspections and final sign -offs for Encroachment Pen -nits and Building Permits with City staff. All scrap, litter and debris resulting from operations specified herein, shall be removed and the premises left in a clean and satisfactory condition. 13-0. WARRANTY The Contractor and/or manufacturer shall warrant all work performed under this Contract for a period of two years from the date of Owner's acceptance of completed job. Any defects in materials or workmanship appearing during this period shall be corrected without cost to the City. - END OF SECTION - III -A-6 Agreement No. 5975 SECTION IV — MEASUREMENT AND PAYMENT 1-0 BASE BID ITEMS 1-1 Base Bid Item 1. Measurement and payment for mobilization and demobilization will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-2 Base Bid Item 2. Measurement and payment for installing White HDPE — U.V. Stabilized Sheet and all necessary hardware (3/4" x 48" x 97") will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-3 Base Bid Item 3 Measurement and payment for installing Yellow Kickplate — U.V. Stabilized and all necessary hardware (3/4" x 6" x 48") will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-4 Base Bid Item 4. Measurement and payment for the installation of Straight Blue Topsill — U.V. Stabilized and all necessary hardware (3/4" x 5" x 48") will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-5 Base Bid Item 5. Measurement and payment for the installation of Radius Blue Topsill — U.V. Stabilized and all necessary hardware (3/4" x 5" x 48") will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-6 Base Bid Item 6. Measurement and payment for the removal and reconstruction of 6" concrete slab with footing and reinforcement steel will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-7 Base Bid Item 7. Measurement and payment for the installation of 2' deep section of crushed miscellaneous base (CMB) will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1V -A-1 Agreement No. 5975 1-8 Base Bid Item 8. Measurement and payment for the removal and reconstruction of 4" thick concrete walkway will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-9 Base Bid Item 9. Measurement and payment for the installation of 4" subdrain perforated pipe will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-10 Base Bid Item 10. ............ Measurement and payment for the installation of 6" PVC pipe (schedule 35) will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-11 Base Bid Item 11. Measurement and payment for to connect the proposed drainage system to the existing catch basin will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-12 Base Bid Item 12. Measurement and payment to repair cracks, depressions, surface defects and uneven areas will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-13 Base Bid Item 13. Measurement and payment for preparing the concrete hockey surface per manufacturer's recommendations and painting the concrete roller hockey surface with appropriate coating system (2 coats) will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-14 Base Bid Item 14. Measurement and payment for replacing all roller hockey striping per as -built plans will be paid for at the Contract lump sum price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-15 Base Bid Item 15. Measurement and payment for printing and installing LA Kings logo onto the IV -A-2 Agreement No. 5975 dashboard (surface preparation shall be per manufacturer's recommendations) will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-16 Base Bid Item 16. Measurement and payment for printing and installing LA Kings logo onto the center of the concrete roller hockey rink (surface preparation shall be per manufacturer's recommendations) will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 1-17 Base Bid Item 17. Measurement and payment for printing and installing LA Kings logo onto the player bench (surface preparation shall be per manufacturer's recommendations) will be paid for at the Contract unit price and shall include compensation for furnishing all labor, equipment, materials, and services necessary per these specifications. 2-0. PROGRESS PAYMENTS Lump sum items shall be billed on a percentage completed basis. The City reserves the right to request a schedule of values to be submitted by the Contractor for any bid item in order to determine payment for work completed. Unit cost items shall be billed on a units -completed basis. Work that is not completed cannot be submitted for billing. The Contractor is encouraged to submit invoices with ample time for City staff to process an invoice. Processing time includes City staff time to inspect and verify lump sum percentage completed and units completed for bid items. IV -A-3 Agreement No. 5975 SECTION V: TECHNICAL SPECIFICATIONS POLYVINYL CHLORIDE (PVC) PIPE PART 1 - GENERAL 1.01 DESCRIPTION A, Scope: This section provides specifications for polyvinyl chloride (PVC) pressure pipe, and PVC pipe accessories, including fittings, deflection couplings, and other miscellaneous accessories are included in this section. See Section 15062 for ductile iron fittings specifications. A. Type: PVC pressure pipe 6" diameter or larger shall comply fully with AWWA C900 or AWWA C905, and PVC pressure pipe smaller than 6" diameter shall be Schedule 80 with solvent welded joints per ASTM D1785. AWWA C900 of C905 PVC pressure pipe shall have bell and spigot ends, unless pipe is thrust restrained joint as manufactured by Certain -Teed. B. ann.ifactur-ers: PVC pressure pipe shall be the product of one of the following manufacturers: 1. J -M Pipe 2. Vinyltech 3. Ipex 4. PW Pipe 5. Certain -Teed (for thrust -restrained joint PVC pipe only) 1.02 QUALITY ASSURANCE A. PVC pressure pipe shall conform to the requirements of AWWA C900, AWWA C905 or ASTM D1785, as applicable. All requirements, tests and inspections called for therein shall apply, together with additional requirements specified herein. The Resident Engineer reserves the right to witness all factory tests. 1.03 SUBMITTALS A. Submittals shall be in accordance with Section 01300. Submittals shall include, as a minimum, the following infonnation: Pipe material indicating manufacturer, pressure rating and compliance with AWWA C900, AWWA C905, or ASTM D1785. 2. Information on fittings, including dimensions, compliance with standards and pressure rating. 3. Information on pipe accessories, including but not limited to service clamps, locating material and deflection couplings. B. The PVC pressure pipe manufacturer shall furnish an affidavit of compliance that all delivered materials comply with the requirements of AWWA C900, AWWA C905, or ASTM D1785 and these specifications Agreement No. 5975 PART 2 - MATERIALS 2.01 PVC PIPE 6" DIAMETER OR LARGER A. Pipe. Materials used to produce the PVC pressure pipe shall be made from Class 12454-A or B rigid polyvinyl chloride compounds in accordance with AWWA C900 or C905, Section 2.1 (Basic Materials), with an established Hydrostatic Design Basis equal to or greater than 4,000 psi for water at 73.4 degrees F. Elastomeric gaskets shall comply with the requirements of AWWA C900 or C905, Sections 2.l .5 and 2.1.5.1 (Gaskets and Lubricants), and with the requirements of ASTM 477. Gaskets shall be suitable for the intended service (water or sewage) as indicated by the contract documents. Each pipe length shall be marked showing the nominal pipe size, outside diameter, AWWA pressure class and AWWA specification designation, all in accordance with AWWA C900 or C905. Minimum pipe class shall be Class 200 for C900 pipe and DR18 (235 psi) for C905 pipe. All joints shall be either an integral bell manufactured on the pipe or a separate coupling. Both the bell and coupling shall employ a rubber ring joint. The bell shall be at least the thickness of the pipe barrel. The sealing rim groove shall be of the same design as the groove in cast iron fittings and valves available from local water works supply distributors. B. Fittings: Fittings for PVC pressure pipe shall be castor ductile iron, conforming to the requirements of AWWA CHH or AWWA C153, with minimum working pressure of 250 psi. Buried fittings shall be coated per the requirements of Section 15062-2.08. Lining shall be nominal 40 mil dry film thickness, Protecto 401 as manufactured by Induron (Birmingham, Alabama 205.324.9584) Fittings shall have push -on, mechanical joint or flanged ends, as shown on the Drawings. Push -on joints may be substituted for mechanical joints at all locations where mechanical joints are shown. Push -on joints shall be the Tyton Joint, as manufactured by U.S. Pipe, or equivalent. Flanges shall conform to the requirements of AWWA C115 and shall be at least the pressure rating of the adjoining pipe. Joints installed within a casing shall be restrained to prevent separation. C. Deflection CoLinlinias: Deflection couplings shall be specially extruded from heavy wall PVC and furnished with gaskets at each end. Deflection couplings shall be rated for a minimum operating pressure of 200 psi and shall meet the requirements of AWWA C900. Gasket grooves and pipe end stops shall be precision machined to minimize shrinkage and out -of -roundness. Deflection couplings shall be "HD" Couplings, as manufactured by Certainteed, or equivalent. Maximum deflection at each joint of the deflection couplings shall be two degrees each side (four degrees total). D. l'VC.PressUre PitIe l..ocGltim-! Material: PVC pressure pipe shall be provided with locating material. The material shall be metallic locating tape as specified in Section 15152. E. Polvethvlene Encasement: Polyethylene encasement for ductile iron fittings and gate valves shall conform to AWWA C105 and Section 15062-2.06. 2.02 PVC PIPE SMALLER THAN 6" DIAMETER A. Pipe: PVC pipe smaller than 6" shall be Schedule 80 with solvent welded joints. PART 3 - EXECUTION Agreement No. 5975 3.01 GENERAL A. PVC pressure pipe shall be shipped, stored and installed in strict accordance with the manufacturer's instructions, as modified herein. PVC pressure pipe six inch -diameter and larger shall be deflected within the manufacturer's tolerance, and in no case greater than two degrees per joint. 3.02 SHIPPING AND STORAGE A. PVC pressure pipe shall be shipped and stored by supporting the pipe uniformly. Surface scratches shall be avoided. Pipe shall not be stacked higher than four feet, nor stacked with the weight on the bells. Pipe shall be covered to protect it from sunlight, while pennitting adequate air circulation above and around the pipe. Pipe that is scratched or gouged, forming a clear depression will be rejected by the Resident Engineer. B. Pipe shall be stored in the unit packages provided by the manufacturer. Gaskets shall be stored in a cool, dark place out of direct sunlight and in their original cartons. 3.03 INSTALLATION OF PVC PRESSURE PIPE A, PVC pipe and fittings shall be installed per AWWA Manual M23 (PVC Pipe Design and Installation), as modified herein. Proper care shall be used to prevent damage when laying the pipe. The pipe shall be hoisted with a fork lift or other handling equipment in a manner that prevents major damage. A cloth belt sling or continuous fiber rope shall be used to lift the pipe to prevent scratching. B. Pipe shall be lowered and not dropped from the truck. Dropped pipe will be rejected by the Resident Engineer. C. Prior to laying PVC pipe, the bottom of the trench shall be graded and prepared to provide uniform bearing throughout the entire length of each joint of pipe. Bell holes of ample size shall be dug in the bottom of the trench at the locations of each joint to facilitate the joining. The trench shall have a flat or semi -circular bottom conforming to the grade to which the pipe is to be laid. D. PVC pipe shall be accurately placed in the trench to the lines and grades shown on the Drawings. Fittings shall be supported independently of the pipe. E. Trenches shall be kept free of water until joints have been properly made. Open ends of the pipe shall be closed temporarily with wood blocks or bulkheads at the end of each day's work, at the noon hour and at all other times when work is not in progress. PVC pipe shall not be laid when trench or weather conditions are unsuitable. F. Pipe shall be furnished in standard, 20 feet long sections. Short lengths with deflection couplings may be used to make the curves. PVC pipe shall be cut by means of saws, power driven abrasive wheels or pipe cutters, which shall produce a square cut. Wedge type roller cutters will not be permitted. After cutting the pipe, the cut ends shall be beveled with a beveling tool, portable type sander or abrasive disc. 3.04 INSTALLATION OF LOCATING TAPE A. Locating tape (see Paragraph 2.0113) shall be installed 8 -inches above and along the centerline of buried PVC pressure pipe. Agreement No. 5975 3.05 PRESSURE TESTING AND FLUSHING OF PVC PIPE A. General: All PVC pipe and appurtenances shall be pressure flushed and pressure tested. Flushing shall be accomplished with potable water. Flushing water shall be disposed of in a manner acceptable to the local Regional Water Quality Control Board and/or other appropriate regulatory agencies. B. 'fc,slim-, Medium: Potable water shall be utilized for pressure testing of pipelines. The Contractor shall coordinate with the local potable water agency to obtain water for pressure testing. The Contractor shall bear all costs for obtaining potable water for testing, including but not limited to meters and backflow prevention devices. C. Pressure And Duration of Test: Test pressure shall be applied with a positive displacement pump. A pressure snubber or dampener shall be provided between the pump and the pipeline. The maximum rate of filling the pipe with the test fluid shall not cause water velocity in the pipe to exceed one foot per second. The test pressure shall be minimum 75 psi for force mains, or 20 psi along gravity mains. Potable water lines shall be tested to minimum 150 psi. Pipeline test pressure shall be maintained for two hours and restored to original test pressure whenever pressure drop exceeds 10 psi. A calibrated pressure recorder shall be used for the test, and a copy of pressure records shall be furnished to the Resident Engineer. D. Allowable Leakage: Test fluid shall be drawn from containers in which the volume of water can be readily measured or through a positive displacement meter. The method of measurement shall be subject to the approval of the Resident Engineer. Leakage shall be considered as the total amount of water pumped into the pipeline during the final one hour period. Leakage shall not exceed the rate of 0.10 gallon per inch of nominal inside diameter per 1,000 feet of pipe per one hour. E. Re tition of "Yest: If the actual leakage exceeds the allowable leakage, the Contractor shall locate the faulty work, repair it and repeat the test until the leakage is within allowable limits specified herein. No visible leakage will be allowed. END OF SECTION PERFORATED PIPE The pipe shell be manufactured from a PVC compound with a cell class 12454-13, as defined in ASTM D-1784, and meets the standard specifications of ASTM D-3212, if integral gasketed joints are provided. Gasket material conforms to the requirement of ASTM F-477. The pipe shall be shop perforated with perforations symmetrically located within a maximum arc of 160 degrees. Perforations shall have a total open area of ast least 0.3 square inches per linear foot of pipe, with minimum of one perforation per linear foot; except for joint areas. Perforations shall be either holes or slots. Diameter of the holes may vary from 1/4 inch minimum to 3/8 inch Agreement No. 5975 maximum; the width of the slots may vary from 3/16 inch minimum to 5/16 inch maximum; the length of slots shall not exceed 4 inches. END OF SECTION CATCH BASIN The catch basin to be 18" expandable catch basin with opening. Material to be styrene. Connections are soil tight, require water proof silicone to make connections water tight. The grate to be galvanized steel. The catch basins and grates shall be set to elevations indicated on the plan. END OF SECTION GRAPHICS The Los Angeles Kings (Kings) graphics shall be installed at the following locations and sizes: w Center Rink Logo — Painted graphic to fit inside a 23 foot 6 -inch circle. • Six (6) Dasherboard Logos — 3 foot by 8 foot graphic vinyl. • Two (2) Player Bench Cover Logos — 4 foot by 4 foot graphic vinyl. To insure that the graphic vinyls print without any font conflicts, please convert all fonts to outlines. All artwork shall be printed in CMYK. The center rink logo shall be painted to precision with a stencil outline. High resolution images shall be provided for the Contractor's use in this work. An adhesive backed vinyl with an aggressive adhesive used in conjunction with a thick gloss laminate. DashMax adhesive or approved equal is recommended for dasher graphics that need to be more long term, that need to be durable and adhere to colder temperatures. It is suitable for both indoor and outdoor applications END OF SECTION Agreement No. 5975 GRAPHICS The Los Angeles Kings (Kings) graphics shall be installed at the following locations and sizes: • Center Rink Logo — Painted graphic to fit inside a 23 foot 6 -inch circle. • Six (6) Dasherboard Logos — 3 foot by 8 foot graphic vinyl. • Two (2) Player Bench Cover Logos — 4 foot by 4 foot graphic vinyl. To insure that the graphic vinyls print without any font conflicts, please convert all fonts to outlines. All artwork shall be printed in CMYK. The center rink logo shall be painted to precision with a stencil outline. High resolution images shall be provided for the Contractor's use in this work. An adhesive backed vinyl with an aggressive adhesive used in conjunction with a thick gloss laminate. DashMax adhesive or approved equal is recommended for dasher graphics that need to be more long term, that need to be durable and adhere to colder temperatures. It is suitable for both indoor and outdoor applications END OF SECTION Athietica SPORT SYSTEMS Safety through innovation March 14, 2019 EL SEGUNDO ROLLER HOCKEY GENERIC REFACING SPECIFICATIONS Agr•, ement No.- s597& Minneapolis, Minnesota, USA 55447 Toll Free: 1-800-809-7465 Tel: 763-249-7465 Fax: 763-249-7475 554 Parkside Drive Waterloo, Ontario, Canada N2L 5Z4 Toll Free: 1-877-778-5911 Tel: 519-747-1856 Fax: 519-747-3659 www.athletica.com FACING: Replacement dasher facing shall be 3/4" White High Density Polyethylene sheets. HDPE sheets shall be pigmented polar white, U.V. Stabilized and virgin material- with desert sand finish. Resin shall have a tensile impact strength of 70 ft- lb/square inch and a fire rating of UL94HB. Sheets shall be square cut to match existing panels, framing and hardware. Facing panels shall be attached to frames using 1/4" flathead machine screws with washers and nyloks- zinc plated. The existing hole spacing pattern shall be reused. KICKPLATE: Replacement dasher kickplate shall be 3/4" Yellow High Density Polyethylene sheets. HDPE sheets shall be pigmented yellow, U.V. Stabilized and virgin material. Resin shall have a tensile impact strength of 70 ft-lb/square inch and a fire rating of UL94HB. Kickplate pieces shall be cut to 6" high x 48" long sections. Top of each kickplate shall be bullnosed to a 3/8" radius. Replacement kickplate shall be attached to frames using 1/4" flathead machine screws with washers and nyloks- zinc plated. The existing hole spacing pattern shall be reused where possible. Additional fasteners shall be added to supplement where kickplate is spliced at 4' intervals. 4' sections are required in order to control linear thermal expansion stress. TOPSILL: Replacement dasher topsill shall be 3/4" Dark Blue High Density Polyethylene sheets. HDPE sheets shall be pigmented dark blue, U.V. Stabilized and virgin material -with orange peel finish. Resin shall have a tensile impact strength of 70 ft-lb/square inch and a fire rating of UL94HB. Topsill pieces shall be cut to S" wide x 48" long sections- straight and radius (20'-4" R) Top edge of each topsill shall be bullnosed to a 3/8" radius along front and rear edges. Replacement topsill shall be attached to frames using 1/4" flathead machine screws with washers and nyloks- zinc plated. The existing hole spacing pattern shall be reused where possible. Additional fasteners shall be added to supplement where topsill is spliced at 4' intervals. 4' sections are required in order to control linear thermal expansion stress. BORDER* PATROL, C CRYSTAPLEX' GAMEPLEW Infinity SENES- PPO SENES r' r" �t"ARMMAUI `M Agreement No. 5975 SECTION 02790 CONCRETE ROLLER HOCKEY AND SKATEBOARD SURFACE COLOR COATING SYSTEM PART1 GENERAL 1.1 SECTION INCLUDES A. Concrete roller hockey and skateboard surface color coating system. 1.2 RELATED REQUIREMENTS A. Section 03310 (03 31 00) — Cast -in -Place Concrete. 1.3 REFERENCE STANDARDS A. American Sports Builders Association (ASBA). B. USA Hockey InLine (USAHIL) official rules. 1.4 SUBMITTALS A. Comply with Section 01330 (01 33 00) — Submittal Procedures. B. Product Data: Submit manufacturer's product data, including surface and crack preparation and application instructions. C. Samples: Submit manufacturer's color samples of color coating. D. Test Reports: 1. Submit independent test results for solar reflectance index. 2. Submit independent test results for 2000 Hour ASTM G154, accelerated weathering UV test, to demonstrate long-term durability and fade resistance. 3. Submit independent test results for 2000 Hour, accelerated weathering ASTM G155 Xenon Arc test, to demonstrate long-term fade resistance and quality of pigment. E. Manufacturer's Certification: Submit manufacturer's certification that materials comply with specified requirements and are suitable for intended application. F. Manufacturer's Project References: Submit manufacturer's list of successfully completed concrete roller hockey and skateboard surface color coating system projects, including project name, location, and date of application. G. Applicator's Project References: Submit applicator's list of successfully completed concrete roller hockey and skateboard surface color coating system projects, including project name, location, type and quantity of color coating system applied, and date of application. H. Warranty Documentation: Submit manufacturer's standard warranty. TECHNICAL SPECIFICATIONS Section 02790 - 1 City of EI Segundo Agreement No. 5975 1.5 QUALITY ASSURANCE A. Manufacturer's Qualifications: 1. Manufacturer regularly engaged, for past 5 years, in manufacture of concrete roller hockey and skateboard surface color coating systems of similar type to that specified. 2. United States owned company. B. Applicator's Qualifications: 1. Applicator regularly engaged, for past 3 years, in application of roller hockey and skateboard surface color coating systems of similar type to that specified. 2. Employ persons trained for application of roller hockey and skateboard surface color coating systems. 1.6 DELIVERY, STORAGE, AND HANDLING A. Delivery and Acceptance Requirements: Deliver materials to site in manufacturer's original, unopened containers and packaging, with labels clearly identifying product name and manufacturer. B. Storage and Handling Requirements: 1. Store and handle materials in accordance with manufacturer's instructions. 2. Keep materials in manufacturer's original, unopened containers and packaging until application. 3. Store materials in clean, dry area indoors. 4. Store materials out of direct sunlight. 5. Keep materials from freezing. 6. Protect materials during storage, handling, and application to prevent contamination or damage. 7. Close containers when not in use. 1.7 AMBIENT CONDITIONS A. Do not apply concrete roller hockey and skateboard surface color coating system when air or surface temperatures are below 50 degrees F during application or within 24 hours after application. B. Do not apply concrete roller hockey and skateboard surface color coating system when rain is expected during application or within 24 hours after application. PART2 PRODUCTS 2.1 MANUFACTURER A. SportMaster Sport Surfaces, PO Box 2277, 2520 South Campbell Street, Sandusky, Ohio 44870. Toll Free 800-326-1994. Fax 877-825-9226. Website www.sportmaster.net. E-mail info@sportmaster.net. Submittals for all products listed hereafter shall be submitted for review and approval prior to construction. Approved products shall only be used during construction. TECHNICAL SPECIFICATIONS Section 02790 - 2 City of EI Segundo Agreement No. 5975 2.2 MATERIALS A. Concrete Roller Hockey and Skateboard Surface Color Coating System: SkateMaster Coating System or approved equal. B. Crack Filler: SportMaster "Acrylic Crack Patch" or approved equal. 1. 100 percent acrylic emulsion trowel -grade crack filler. 2. Fills cracks in concrete pavement up to 1 inch wide. 3. Chemical Characteristics, by Weight, Minimum: a. Acrylic Emulsion: 10.0 percent. b. Hiding Pigment: 0.2 percent. C. Mineral Inert Fillers: 78.0 percent. d. Film Formers, Additives: 1.8 percent. e. Water: 8.5 percent. 4. Weight per Gallon at 77 Degrees F: 15.2 lbs., plus or minus 1.0 lbs. 5. Non -Volatile Material: 80 percent, plus or minus 5 percent. 6. Color: [Green] [Neutral] [Red]. C, Patch Binder: SportMaster "Acrylic Patch Binder" or approved equal. 1. 100 percent acrylic emulsion liquid binder. 2. Mix on-site with sand and cement. 3. Levels and repairs low spots and depressions up to 3/4 inch deep in concrete pavement. 4. Weight per Gallon at 77 Degrees F: 8.8 lbs., plus or minus 0.5 lbs. D. Adhesion Promoter: SportMaster "Acrylic Adhesion Promoter" or approved equal. 1. Acrylic emulsion primer. 2. Primes concrete surface and promotes adhesion of roller hockey and skateboard coating system materials. 3. Weight per Gallon at 77 Degrees F: 8.7 lbs., plus or minus 0.5 lbs. E. Filler Course: SportMaster "Neutral Acrylic Resurfacer" or approved equal. 1. 100 percent acrylic emulsion resurfacer. 2. Mix on-site with silica sand (14lbs of sand per gallon - 70 mesh or finer). 3. Apply to adhesion promoter or previously colored acrylic surfaces in preparation of SkateMaster color coating system. 4. Chemical Characteristics, by Weight, Minimum: a. Acrylic Emulsion: 44.0 percent. b. Hiding Pigment: 2.0 percent. C. Mineral Inert Fillers: 5.0 percent. d. Film Formers, Additives: 0.2 percent. e. Water: 45.0 percent. 5. Weight per Gallon at 77 Degrees F: 8.5 lbs., plus or minus 0.5 lbs. 6. Non -Volatile Material: 27.5 percent, plus or minus 5.0 percent. 7. Color: Neutral - Follow manufacturers' specifications for tinting Filler Course. F. Skate Surface: SportMaster "SkateMaster Coating System" or approved equal. 1. 100 percent acrylic emulsion coating. 2. Product ready to mix and apply. Do not dilute or add sand. 3. Color coats roller hockey and skateboard recreational areas. 4. Weight per Gallon at 77 Degrees F: 9.2 lbs., plus or minus 0.5 lbs. 5. Color: Gray. TECHNICAL SPECIFICATIONS Section 02790 - 3 City of EI Segundo Agreement No. 5975 G. Line Markings Primer: SportMaster "Stripe -Rite" or approved equal. 1. 100 percent acrylic emulsion primer, clear drying. 2. Primes line markings and prevents bleed -under for sharp lines. 3. Chemical Characteristics, by Weight, Nominal: a. Acrylic Emulsion: 38.0 percent. b. Hiding Pigment: 0.0 percent. C. Mineral Inert Fillers: 7.0 percent. d. Film Formers, Additives: 1.5 percent. e. Water: 50.0 percent. 4. Weight per Gallon at 77 Degrees F: 8.9 lbs., plus or minus 0.5 lbs. 5. Non -Volatile Material: 29 percent, plus or minus 5 percent. H. Line Paint: SportMaster "Line Paint" or approved equal. 1. Pigmented, 100 percent acrylic emulsion line paint. 2. Line marking on concrete roller hockey and skateboard areas. 3. Chemical Characteristics, by Weight, Nominal: a. Acrylic Emulsion: 25.89 percent. b. Pigment: 14.90 percent. C. Mineral Inert Fillers: 13.12 percent. d. Additives: 4.73 percent. e. Water: 41.36 percent. 4. Weight per Gallon at 77 Degrees F: 10.65 lbs., plus or minus 0.75 lbs. 5. Non -Volatile Material: 45.17 percent, plus or minus 5 percent. 6. Color: Match existing. PART 3 EXECUTION 3.1 EXAMINATION A. Examine concrete roller hockey and skateboard surfaces to receive skate surfacing system. B. Verify: 1. Perimeter drainage to prevent moisture accumulation beneath concrete surface. 2. No curing compounds have been applied to surface. 3. Concrete roller hockey and skateboard courts meet ASBA requirements. C. Notify Architect of conditions that would adversely affect application or subsequent use. D. Do not begin surface preparation or application until unacceptable conditions are corrected. 3.2 SURFACE PREPARATION A. Protection of In -Place Conditions: Protect adjacent surfaces and landscaping from contact with concrete roller hockey and skateboard surface color coating system. B. Prepare surfaces in accordance with manufacturer's instructions. C. New Concrete: 1. Cure new concrete surfaces a minimum of 28 days before application of concrete roller hockey and skateboard surface color coating system. TECHNICAL SPECIFICATIONS Section 02790 - 4 City of EI Segundo Agreement No. 5975 2. Provide medium broom finish or similar roughened texture. 3. Do not steel trowel finish. 4. Acid etch with phosphoric or muriatic acid and rinse thoroughly prior to application of color coating system. D. Existing Concrete: 1. Sandblast, shotblast, or scarify smooth concrete surfaces to roughened texture similar to medium broom finish. 2. If existing concrete is uncoated, acid etch with phosphoric or muriatic acid and rinse thoroughly prior to application of color coating system. E. Remove dirt, dust, debris, oil, grease, sealers, curing compounds, vegetation, loose coatings, loose materials, and other surface contaminants which could adversely affect application of concrete roller hockey and skateboard surface color coating system. Pressure wash entire surface. F. Repair cracks, depressions, and surface defects in accordance with manufacturer's instructions before application of skate surface. & Repair spalled areas and level depressions 1/8 inch and deeper with patch binder in accordance with manufacturer's instructions. H. Apply adhesion promoter over entire concrete surface in accordance with manufacturer's instructions. Apply 1 coat of filler course to provide smooth underlayment for application of skate surface. Ensure surface repairs are flush and smooth to adjoining surfaces. 3.3 APPLICATION A. Apply concrete roller hockey and skateboard surface color coating system in accordance with manufacturer's instructions at locations indicated on the Drawings. B. Mix materials in accordance with manufacturer's instructions. C. Apply Filler Course and Skate Surface with a 50-60 durometer, soft rubber squeegee. D. Filler Course: 1. Apply 1 coat on new concrete or existing acrylic surfaces with minimal repairs. 2. Apply 2 coats on existing acrylic surfaces with extensive cracks or low spot repair. E. Skate Surface: Apply a minimum of 2 coats of Skate Surface to prepared surfaces in accordance with manufacturer's instructions. F, Allow material drying times in accordance with manufacturer's instructions before applying other materials or opening completed surface to foot traffic. TECHNICAL SPECIFICATIONS Section 02790 - 5 City of EI Segundo Agreement No. 5975 3.4 LINE MARKINGS A. Lay out InLine Roller Hockey court line markings in accordance with USA Hockey InLine (USAHIL) official rules. B. Apply line markings primer, after masking tape has been laid, to seal voids between masking tape and court surface to prevent bleed -under when line paint is applied. C. Apply a minimum of 1 coat of line paint in accordance with manufacturer's instructions. 3.5 PROTECTION A. Allow a minimum of 24 hours curing time before opening roller hockey and skateboard courts for play. B. Protect applied concrete inline skate and hockey surface color coating system to ensure that, except for normal weathering, coating system will be without damage or deterioration at time of Substantial Completion. END OF SECTION TECHNICAL SPECIFICATIONS Section 02790 - 6 City of EI Segundo SECTION 03200 Agreement No. 5975 REINFORCEMENT STEEL PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall furnish, fabricate, and place all concrete reinforcement steel, welded wire fabric, couplers, and concrete inserts for use in reinforced concrete and masonry construction and shall perform all appurtenant work, including all the wires, clips, supports, chairs, spacers, and other accessories, all in accordance with the Contract Documents. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section [03310] Cast -in -Place Concrete. 1.3 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS A. Comply with the reference standards of the GENERAL REQUIREMENTS. B. Comply with the current provisions of the following Codes and Standards, as applicable: 1. Commercial Standards: ACI 315 Details and Detailing of Concrete Reinforcement. ACI 318 Building Code Requirements for Reinforced Concrete. ACI 350 Code Requirements for Environmental Engineering Concrete Structures. ACI 530 Building Code Requirements & Specifications for Masonry Structures WRI Manual of Standard Practice for Welded Wire Fabric. AWS D1.4 Structural Welding Code - Reinforcing Steel. ASTM A 82 Specification for Steel Wire, Plain, for Concrete Reinforcement. ASTM A 185 Specification for Welded Steel Wire Fabric For Concrete Reinforcement. ASTM A 497 Welded Deformed Steel Wire Fabric for Concrete Reinforcement. ASTM A 615 Specification for Deformed and Plain Billet -Steel Bars for Concrete Reinforcement. ASTM A 706 Low -alloy Deformed Steel Bars for Concrete Reinforcement ASTM A 775 Specifications for Epoxy Coated Bar Reinforcement ASTM A 884 Specifications for Epoxy Coated Wire Reinforcement CRSI Manual of Standard Practice CRSI Recommended Practice for Placing Bar Supports, Specifications and Nomenclature TECHNICAL SPECIFICATIONS Section 03200 - 1 City of EI Segundo Agreement No. 5975 CRSI Recommended Practice for Placing Reinforcing Bars 2. Government Standards: CSS Caltrans Standard Specifications. 1.4 CONTRACTOR SUBMITTALS A. Submittals shall be made in accordance with the GENERAL REQUIREMENTS. B. The following submittals and specific information shall be provided. Details of the concrete reinforcement steel and concrete inserts shall be submitted by the CONTRACTOR at the earliest possible date after receipt by the CONTRACTOR of the Notice to Proceed. Said details of reinforcement steel for fabrication and erection shall conform to ACI 315 and the requirements specified and shown. 2. If reinforcement steel is required or permitted to be spliced by welding at any location, the CONTRACTOR shall submit mill test reports which shall contain the information necessary for the determination of the carbon equivalent as specified in AWS D1.4. The CONTRACTOR shall submit a written welding procedure for each type of weld for each size of bar which is to be spliced by welding; merely a statement that AWS procedures will be followed is not acceptable. 1.5 QUALITY ASSURANCE A. If reinforcement steel is welded at any location, the CONTRACTOR shall submit certifications of procedure qualifications for each welding procedure used and certification of welder qualifications, for each welding procedure, and for each welder performing the work. Such certification and qualifications shall be as required by the CITY. B. The CONTRACTOR shall provide samples of each type of weld used in the work in a quantity and of dimensions adequate for testing. At the discretion of the INSPECTOR, radiographic testing of direct butt welds will be performed. The CONTRACTOR shall provide assistance necessary to facilitate testing. The CONTRACTOR shall repair any weld which fails to meet the requirements of AWS D1.4. The costs of testing will be paid by the CONTRACTOR. C. The CONTRACTOR shall provide to the INSPECTOR written identification of reinforcement steel by manufacturer's heat number and mil certification, and the fabricator's release number and type from the point of fabrication to the place of final incorporation of the rebar into the work. 1.6 MARKING AND SHIPPING A. Tag bundled bars with identification, and transport and store so as not to damage any material. Use metal tags indicating size, length and other marking shown on placement drawings. Maintain tags after bundles are broken. PART 2 -- PRODUCTS 2.1 REINFORCEMENT STEEL A. All reinforcement steel for all cast -in-place reinforced concrete construction shall conform to the following requirements: TECHNICAL SPECIFICATIONS Section 03200 - 2 City of EI Segundo Bar reinforcement shall conform to the requirements of ASTM A6'h'S,6racPeVSrIeP 7MI Reinforcement with supplementary requirement S-1, and ASTM A706 for rebars subject to welding, or as otherwise shown. Bar reinforcement for wall boundary elements, special moment frames, or when subject to welding, shall conform to ASTM A706, unless noted otherwise. 3. Welded wire fabric reinforcement shall conform to the requirements of ASTM A185, or ASTM A497 and the details shown; provided, that welded wire fabric with longitudinal wire of W9.5 size wire shall be either furnished in flat sheets or in rolls with a core diameter of not less than 10 inches; and provided further, that welded wire fabric with longitudinal wires larger than W9.5 size shall be furnished in flat sheets only. 4. Spiral reinforcement may be cold -drawn steel wire conforming to the requirements of ASTM A82, when approved by the ENGINEER. 5. All reinforcements shall be shop fabricated. Bending of reinforcing in the field will not be allowed. 6. Epoxy coated reinforcing steel shall conform to the requirements of ASTM A775 and A884, and shall be used where indicated on the drawing. 7, Reinforcement with any of the following defects will not be acceptable and be immediately removed from the site: a. Bar lengths, depths, and/or bends exceeding the specified fabrication tolerances. b. Bends or kinks not shown on the Drawings c. Bars with reduced cross-section due to excessive rusting or other cause. B. Accessories: Accessories shall include all necessary chairs, slab bolsters, concrete blocks, tie wires, dips, supports, spacers, and other devices to position reinforcement during concrete placement. Slab bolsters shall have gray plastic -coated legs. 2.. Concrete blocks (dobies), used to support and position reinforcement steel, shall have the same or higher compressive strength as specified for the concrete in which it is located. Where the concrete blocks are used on concrete surfaces exposed to view, the color and texture of the concrete blocks shall match that required for the finished surface. Wire ties shall be embedded in concrete block bar supports. Use bar supports complying with CRSI recommendations, unless otherwise shown on the Contract Drawings. 4. Do not use wood, brick, or other non -complying material. 5. For slabs on grade, use supports with sand plates or horizontal runners where base material will not support chair legs. 6. For exposed -to -view completed concrete surfaces, where legs of supports are in contact with forms, provide supports with either hot -dip galvanized or plastic -protected legs. CONTRACTOR'S selection subject to the ENGINEER's approval. 2.2 WELDED SPLICES A. Welded splices shall be provided where shown and where approved by the ENGINEER. All welded splices of reinforcement steel shall develop a tensile strength which exceeds 125 percent of the yield strength of the reinforcement bars which are connected. Provide two samples of each bar TECHNICAL SPECIFICATIONS Section 03200 - 3 City of EI Segundo size for testing. When welding is to be done in the field, provide e�epreparedosamples. Preparation shall be made by welder actually preparing the production run. B, All materials required to conform the welded splices to the requirements of AWS D1.4 shall be provided. C. All welding shall be performed by AWS certified welders. PART 3 -- EXECUTION 3.1 GENERAL A. All reinforcement steel, welded wire fabric, couplers, and accessories shall be fabricated, and placed in accordance with the requirements of the California Building Code, CRSI Recommended Practices and Manual, and WRI, and the supplementary requirements specified herein. 3.2 FABRICATION A. General: Reinforcement steel shall be accurately formed to the dimensions and shapes shown, and the fabricating details shall be prepared in accordance with ACI 315 and ACI 318 or ACI 350 (as applicable), except as modified by the Drawings. Bars shall be bent cold. B. The CONTRACTOR shall fabricate reinforcement bars for structures in accordance with bending diagrams, placing lists, and placing drawings. Said drawings, diagrams, and lists shall be prepared by the CONTRACTOR as specified under GENERAL REQUIREMENTS. C. Fabricating Tolerances: Bars used for concrete reinforcement shall meet the following requirements for fabricating tolerances: Sheared length: ± 1 inch 2. Depth of truss bars: + 0, - 1/2 inch 3, Stirrups, ties, and spirals: ± 1/2 inch 4. All other bends: ± 1 inch 3.3 PLACING A. Placing: Reinforcement steel shall be accurately positioned as shown, and shall be supported and wired together to prevent displacement, using annealed iron wire ties or suitable clips at intersections. All reinforcement steel shall be supported using approved accessories and chairs which are strong and rigid enough to prevent any displacement of the reinforcement steel and shall comply with the applicable Department of Building and Safety's Research Report. Where concrete is to be placed on the ground, supporting concrete blocks (or dobies) shall be used, in sufficient numbers to support the bars without settlement, but in no case shall such support be continuous. All concrete blocks used to support reinforcement steel shall be tied to the steel with wire ties which are embedded in the blocks. Use care not to damage vapor barriers where they occur. B. The portions of all accessories in contact with the formwork shall be made of concrete, plastic, or steel coated with a 1/8 -inch minimum thickness of plastic which extends at least 1/2 -inch from the concrete surface. Plastic shall be gray in color. C. Tie wires shall be bent away from the forms in order to provide the specified concrete coverage. D. Bars additional to those shown which may be found necessary or desirable by the CONTRACTOR TECHNICAL SPECIFICATIONS Section 03200 - 4 City of EI Segundo for the purpose of securing reinforcement in position shall be provided byy"gee8ONTR,4CT01 at ti own expense. E. Placing Tolerances: Unless otherwise specified, reinforcement placing tolerances shall be within the limits specified in Section 7.5 of ACI 318 except where in conflict with the requirements of the California Building Code. F. Bars may be moved as necessary to avoid interference with other reinforcement steel, conduits, or embedded items. If bars are moved more than one bar diameter, or enough to exceed the above tolerances, the resulting arrangement of bars shall be reviewed and accepted by the ENGINEER. G. Welded wire fabric reinforcement placed over horizontal forms shall be supported on slab bolsters having gray, plastic -coated standard type legs as specified in Paragraph B herein. Slab bolsters shall be spaced not less than 30 inches on centers, shall extend continuously across the entire width of the reinforcement mat, and shall support the reinforcement mat in the plane shown. H. Welded wire fabric placed over the ground shall be supported on wired concrete blocks (dobies) spaced not more than 3 feet on centers in any direction. The construction practice of placing welded wire fabric on the ground and hooking into place in the freshly placed concrete shall not be used. 3.4 SPACING OF BARS A. Spacing of reinforcement shall comply with ACI 318 requirements. Spacing of reinforcement shall be identical to previous spacing as shown in the as -built drawings. 3.5 SPLICING A. General: Reinforcement bar splices shall only be used at locations shown. When it is necessary to splice reinforcement at points other than where shown, the character of the splice and location shall be as acceptable to the ENGINEER. B, Splices of Reinforcement: The length of lap for reinforcement bars, unless otherwise shown shall be in accordance with ACI 318, Section 12.15.1 for a class B splice. Stagger splices in horizontal wall bars at least 48" longitudinal in alternate bars and opposite faces. C. Laps of welded wire fabric shall be in accordance with the ACI 318. Adjoining sheets shall be securely tied together with No. 14 tie wire, one tie for each 2 running feet. Wires shall be staggered and tied in such a manner that they cannot slip. D. Splices in column spiral reinforcement, when necessary, shall be made by welding or by a lap of 1-1/2 turns. E. Field welding of bars: In accordance with the approved submittal. Continuous inspection required. F. Mechanical couplers: Install in accordance with the approved submittal. G. Bending or Straightening: Reinforcement shall not be straightened or rebent in a manner which will injure the material. Bars with kinks or bends not shown shall not be used. All bars shall be bent cold, unless otherwise permitted by the ENGINEER. No bars partially embedded in concrete shall be field -bent except as shown or specifically permitted by the ENGINEER. H. Splicing of reinforcement on bridge structures shall conform to CSS Section 52-1, 3.6 CLEANING AND PROTECTION The surfaces of all reinforcement steel and other metalwork to be in contact with concrete shall be thoroughly cleaned of all dirt, grease, loose scale and rust, grout, mortar and other foreign TECHNICAL SPECIFICATIONS Section 03200 - 5 City of EI Segundo Agreement No. 5975 substances immediately before the concrete is placed. Where there is delay in depositing concrete, reinforcement shall be reinspected and, if necessary recleaned. Bars with reduced cross-section due to excessive rusting or other cause will not be acceptable for use and shall be replaced by the CONTRACTOR at no additional cost to the CITY. 3.7 FIELD QUALITY CONTROL A. Inspection: Secure inspection and acceptance from INSPECTOR before concrete is placed. Make arrangements in advance for geotechnical inspection of foundations, continuous inspection as required, and/or structural observation by the designated registered design professional prior to concrete placement. TECHNICAL SPECIFICATIONS Section 03200 - 6 City of EI Segundo ��O ���� SECTION 03310 4o[��[M8[� `= .CAST -IN-PLACE CONCRETE PART 1-- GENERAL 1.1 THE REQUIREMENT & The Contractor shall furnish all materials for uonuraha in accordance with the provisions of this Section and shall form, mix, place, cure, repair, finish, and do all other work as required to produce finished concrete, in accordance with the requirements of the Contract Documents. 1.2 REFERENCE 8PEC/F/CAT/[)NS, CQDES, AND STANDARDS A. Comply with the Standard specifications for Public Works Construction (SSPWC). B. Comply with the current provisions nfthe following Codes and Standards, as applicable. 1. Federal specifications and Standards: PS U.S. Product Standard for Concrete Forms, Class 1. PS 20 American Lumber Softwood Standard 2. Commercial Standards: ACI 117 Standard Tolerances for Concrete Construction and Materials. ACI 301 specifications for Structural Concrete for Buildings. ACI 305R Standard specifications for Hot Weather Concreting ACI 306.1 Standard specifications for Cold Weather Concreting ACI 315 Details and Detailing ofConcrete Reinforcement. A[| 318 Building Code Requirements for Reinforced Concrete. ACI 347 Recommended Practice for Concrete Formwork. ACI 350 Recommended Practice for Sanitary Structures. ASTM A 82 Specification for Steel Wire, P|oin, for Concrete Reinforcement. ASTM A 185 Specification for Welded Steel Wire Fabric for Concrete Reinforcement. ASTM A815 Specification for Deformed and Plain Billet -Steel Bona for Concrete Reinforcement. ASTM A7U8 Low -alloy Deformed Steel Bars for Concrete Reinforcement ASTM C31 Practices for Making and Curing Concrete Test Specimens in the Field. ASTM C33 Specification for Concrete Aggregates. ASTM C3S Test Method for Compressive Strength ofCylindrical Concrete Specimens. TECHNICAL SPECIFICATIONS Section 0331O- 1 ASTM C 42 ASTM C 94 ASTM C 114 ASTM C 136 ASTM C 143 ASTM C 150 ASTM C 156 ASTM C 172 ASTM C 192 ASTM C 260 ASTM C 494 ASTM D 1751 AWS D1.4 WRI 1.3 CONTRACTOR SUBMITTALS Agqreement No. 5975 Methods of Obtaining and Testing Drilled Cores and Sawed Beams of Concrete. Specification for Ready -Mixed Concrete. Method for Chemical Analysis of Hydraulic Cement. Method for Sieve Analysis of Fine and Coarse Aggregate. Test Method for Slump of Portland Cement Concrete. Specification for Portland Cement. Test Method for Water Retention by Concrete Curing Materials. Specification for Sampling of Fresh Concrete Method of Making and Curing Concrete Test Specimens in the Laboratory. Specification for Air -Entraining Admixtures for Concrete. Specification for Chemical Admixtures for Concrete. Specification for Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction (Non -extruding and Resilient Bituminous Types). Structural Welding Code - Reinforcing Steel. Manual of Standard Practice for Welded Wire Fabric. A. Details of the concrete reinforcing steel and concrete inserts shall be submitted by the Contractor at the earliest possible date after receipt by the Contractor of the Notice to Proceed. The shop drawings shall include bar placement diagrams which clearly indicate the dimensions of each bar splice. B. Mix Designs: Prior to beginning the work, the Contractor shall submit to the Engineer, for review, and acceptance, preliminary concrete mix designs for each class and type of concrete specified herein. The mix designs shall be designed by an independent testing laboratory acceptable to the Engineer. All costs related to such mix design shall be borne by the Contractor. The concrete mix design shall conform to SSPWC, section 201-1. C. Certified Delivery Tickets: Where ready -mix concrete is used, the Contractor shall provide certified weighmaster delivery tickets at the time of delivery of each load of concrete. Each certificate shall show the public weighmaster's signature, and the total quantities, by weight of cement, sand, each class of aggregate, admixtures, and the amounts of water in the aggregate and added at the batching plant as well as the amount of water allowed to be added at the site for the specific design mix. Each certificate shall, in addition, state the mix number, total yield in cubic yards, and the time of day, to the nearest minute, corresponding to when the batch was dispatched, when it left the plant, when it arrived at the job, the time that unloading began, and the time that unloading was finished. 1.4 QUALITY ASSURANCE A. Laborers: Use adequate number of skilled laborers who are thoroughly trained and experienced in the necessary crafts and completely familiar with the specified requirements and the methods needed for proper performance of the Work of this Section. TECHNICAL SPECIFICATIONS Section 03310 - 2 City of EI Segundo Agreement No. 5975 B. Compliance with Regulations: All materials shall comply with the current rules and regulations of the local air quality management district, with the rules regarding volatile organic compounds, and with FDA rules and regulations for dangerous substances in construction products. C. Delivery: Concrete, reinforcing and forming materials to be delivered to the job site in a timely manner to ensure uninterrupted work progress. D. Storage: Store materials and equipment at the job site where directed by the Inspector, by methods that prevent damage and permit ready access for inspection, identification and installation. E. Continuous Inspection: Obtain inspection and approval of forms and reinforcing by City's Inspector three (3) working days before placing structural concrete in order to be verified by Engineer. F. Construction Tolerances: The Contractor shall set and maintain concrete forms and perform finishing operations so as to ensure that the completed work is within the tolerances specified herein. Surface defects and irregularities are defined as finishes and are to be distinguished from tolerances. Tolerance is the specified permissible variation from lines, grades, or dimensions shown. Where tolerances are not stated in the specifications, permissible deviations will be in accordance with ACI 117. PART 2 -- PRODUCTS 2.1 EARTH FORMS Unless otherwise indicated or required, concrete for footings and pile caps may be placed directly against vertical excavated surfaces, provided the material will stand without caving, that minimum reinforcing steel clearances are maintained, and suitable provisions are taken to prevent raveling of top edges or sloughing of loose material from walls of excavation. Sides of excavation shall be made with a neat cut and the width made as indicated. Concrete which is exposed to view on exterior shall be formed to maintained depth of 6 inches below finished grade. 2.2 REINFORCEMENT STEEL All reinforcement steel shall be as specified in the technical specifications. The spacing of the reinforcement steel shall be per the as -built drawings. 2.3 CONCRETE MATERIALS A. Materials shall be delivered, stored, and handled so as to prevent damage by water or breakage. Cement reclaimed from cleaning bags or leaking containers shall not be used. B. All materials furnished shall be as specified in Contract drawings. C. Storage of materials shall conform to the requirements of ACI 301. 2.4 MISCELLANEOUS MATERIALS A. Epoxy adhesives shall be the following products for the applications specified: For bonding freshly -mixed, plastic concrete to hardened concrete, [Sikadur Hi -Mod Epoxy Adhesive, as manufactured by Sika Chemical Corporation]; [Concresive 1001 -LPL, as manufactured by Adhesive Engineering Company]; or an approved equal. For bonding hardened concrete or masonry to steel, [Colma-Dur Gel], [Sikadur Hi -Mod Gel], or an approved equal. C. Expansion Joint Filler: Asphalt impregnated fiber or non -extruding foam type, conforming to ASTM D 994 and D 1751, or D 1752. E. Bonding Agent: ["Weld -Crete", manufactured by Larsen Products Co. or "Concresive", manuafctured by Master Builders], or equal. TECHNICAL SPECIFICATIONS Section 03310 - 3 City of EI Segundo Agreement No. 5975 PART 3—EXECUTION 31 GENERAL FORMWORK REQUIREMENTS A. Forms to confine the concrete and shape it to the required lines shall be used wherever necessary. The Contractor shall assume full responsibility for the adequate design of all forms, and any forms which one unsafe orinadequate in any respect shall promptly be removed from the work and replaced a1the Contractor's expense. Asufficient number offorms ofeach kind shall beprovided to permit the required nmtu of progress to be maintained. The design and inspection of concrete forms.fa|oovvnrk. and shoring shall comply with applicable |oca\, state and federal regulations. All demi0n, construction, maintenance, prepana1ion, and removal offorms shall be in accordance with ACI 347and the requirements specified herein. B. All forms shall be true in every respect tothe required shape and size, shall conform to the established alignment and gnade, and ahmU be ofsufficient strength and rigidity to maintain their position and shape under the loads and operations incident to placing and vibrating the concrete. 3.2 REUSE OFFORMS Forms may be reused only ifingood condition and only if acceptable to the Inspector. ����i� between uses w�lbarequired wherever necessary toobtain un�)nnaur�ucatexture nn~all exposed concrete surfaces. Exposed concrete surfaces are defined aasurfaces which are permanently exposed tuview. Careful procedures for the removal mfforms shall bastrictly followed, and this work shall bedone with cone moenhoavoid damage tothe concrete. No heavy loading on green concrete will be permitted. The period of time for formwork removal shall be in accordance with ACI 318, Chapter 8 and Section 303'1 of Standard specifications and as follows: Do.not nmn�ovoh/nnvvork until concrete has attained sufficient strength to support its own weight all superimposed loads including oonohocUnn loads and to permit form and falsework removal with complete safety. 2. Forms for all vertical walls and columns shall remain in place at least 3 days after the concrete has been placed. 3.4 PREPARATION OFSURFACES FOR CONCRETING A. General: Wet wood forms sufficiently hutighten up cracks. Wet other materials sufficiently to reduce absorption and to help maintain concrete workability. Earth surfaces shall be thoroughly wetted by sprinkling, 24 hours prior to the placing of any concrete, and these surfaces shall be kept moist byfrequent sprinkling upbzthe time nfplacing concrete thereon. The surface shall be free from standing water, mud, and debris atthe time ofplacing concrete. B. Expansion Joint Filler: \natoU vvhana slabs abut buildings and a|aavvhera as indicated. Install full depth ofconcrete with top level with finished surface ofconcrete. C. Embedded Items: No concrete ahoU be placed until all fonnwork, installation of parts to be ombedded, reinforcement steel, and preparation of surfaces involved in the placing have been completed and accepted by the Inspector at least 24 hours before placement ofconcrete. All surfaces of forms and embedded items that have become encrusted with dried grout from concrete previously placed shall be cleaned of all such grout before the surrounding or adjacent concrete is placed. O. All reinforcement, anchor bolts, sleeves, inserts, and similar items shall be set and secured in the forms where shown on the Drawings or by shop drawings and shall be acceptable to the Inspector before any concrete ioplaced. Accuracy ofplacement |athe responsibility ofthe Contractor. TECHNICAL SPECIFICATIONS Section 03310-4 City mE/Segundo Agreement No. 5975 E. Casting New Concrete Against Old: Where concrete is to be cast against old concrete (any concrete which is greater than 60 days of age), the surface of the old concrete shall be thoroughly cleaned and roughened by sand -blasting (exposing aggregate) prior to the application of an epoxy bonding agent. Application shall be according to the bonding agent manufacturer's instructions and recommendations. Openings for pipes, inserts for pipe hangers and brackets, and the setting of anchors shall, where practicable, be provided for during the placing of concrete. G. Anchor bolts shall be accurately set, and shall be maintained in position by templates while being embedded in concrete. H. Cleaning: The surfaces of all metalwork to be in contact with concrete shall be thoroughly cleaned of all dirt, grease, loose scale and rust, grout, mortar, and other foreign substances immediately before the concrete is placed. 3.5 HANDLING, TRANSPORTING, AND PLACING CONCRETE A. General: Do not place concrete during rain or adverse weather conditions without means to prevent all damage. Placing of concrete shall conform to the applicable requirements of Chapter 8 of ACI 301 and the requirements of this Section. B, Non -Conforming Work or Materials: Concrete which upon or before placing is found not to conform to the requirements specified herein shall be rejected and immediately removed from the work. Concrete which is not placed in accordance with these specifications, or which is of inferior quality, shall be removed and replaced by and at the expense of the Contractor. C. Placement in Wall Forms: Concrete shall not be dropped through reinforcement steel or into any deep form, whether reinforcement is present or not, causing separation of the coarse aggregate from the mortar on account of repeatedly hitting rods or the sides of the form as it falls, nor shall concrete be placed in any form in such a manner as to leave accumulation of mortar on the form surfaces above the placed concrete. In such cases, some means such as the use of hoppers and, if necessary, vertical ducts of canvas, rubber, or metal shall be used for placing concrete in the forms in a manner that it may reach the place of final deposit without separation. In no case shall the free fall of concrete exceed 4 -feet below the ends of ducts, chutes, or buggies. Concrete shall be uniformly distributed during the process of depositing and in no case after depositing shall any portion be displaced in the forms more than 6 -feet in horizontal direction. Concrete in forms shall be deposited in uniform horizontal layers not deeper than 2 -feet; and care shall be taken to avoid inclined layers or inclined construction joints except where such are required for sloping members. Each layer shall be placed while the previous layer is still soft. The rate of placing concrete in forms shall not exceed 5 -feet of vertical rise per hour. 3.6 TAMPING AND VIBRATING A. As concrete is placed in the forms or in excavations, it shall be thoroughly settled and compacted, throughout the entire depth of the layer which is being consolidated, into a dense, homogeneous mass, filling all corners and angles, thoroughly embedding the reinforcement, eliminating rock pockets, and bringing only a slight excess of water to the exposed surface of concrete during placement. Vibrators shall be high speed power vibrators (8000 to 10,000 rpm) of an immersion type in sufficient number and with (at least one) standby units as required. B. Concrete in walls shall be internally vibrated and at the same time rammed, stirred, or worked with suitable appliances, tamping bars, shovels, or forked tools until it completely fills the forms or excavations and closes snugly against all surfaces. Subsequent layers of concrete shall not be placed until the layers previously placed have been worked thoroughly as specified. Vibrators shall be provided in sufficient numbers, with standby units as required, to accomplish the results herein specified within 15 minutes after concrete of the prescribed consistency is placed in the forms. The vibrating head shall be kept from contact with the surfaces of the forms. Care shall be taken not to vibrate concrete excessively or to work it in any manner that causes segregation of its constituents. TECHNICAL SPECIFICATIONS Section 03310 - 5 City of EI Segundo [��[M8[���O 37 FINISHING CC)NCRETESUF�FACES '` 4o" ' 5975 A. Genera: Surfaces shall be free from fins, bulges, ridges, offsets, honeycombing, or roughness of any kind, and shall present afinished, smooth, continuous hard surface, Allowable deviations from plumb orlevel and from the a|ignment, profi|ea, and dimensions shown are defined as tolerances and are specified herein. These tolerances are bobedistinguished from irregularities infinish an described herein. Aluminum finishing tools shall not boused. The Contractor shall protect all concrete against injury until final acceptance bytha {�dx Fresh concrete shall be protected from damage due to oain, hui|, sleet, or snow. ThContractor nhaU provide such protection while the concrete is still plastic and whenever such precipitation is imminent oroccurring. 3.0 TREATMENT OF SURFACE DEFECTS A. As soon as forms are renlovod, all exposed surfaces shall be carefully examined and any irregularities shall be immediately rubbed or ground in a satisfactory manner in order to secure u smooth, uniform, and continuous surface. Plastering orcoating ofsurfaces hobesmoothed will not be permitted. No repairs shall be made until after the method of repair has been submitted to and approved by the Engineer and inspected by the Inspector. /n no cane will extensive patching of honeycombed concrete be permitted. Concrete containing minor voids, hu|en, honeycomnbing, or similar depression defects shall be repaired as specified herein. Concrete containing extensive voids, ho|es, honeycombing, or similar depression defects, nhoU be completely removed and nep{eooU. All repairs and replacements herein specified shall be promptly executed by the Contractor atits own expense. B. Defective surfaces to be repaired shall be cut back from true line a minimum depth of 1/2 -inch over the entire area. Feathered edges will not be permitted. VVhane chipping nrcutting tools are not required in order to deepen the area prnpady. the surface aho|| be prepared for bonding by removal ofaUh |ni�ano�nrao�met�a|,andnoi\eeothan1/32-inohdopthoftheyu�aoe�|m - all hard portions, bymeans ofenefficient sandblast. After cutting and sandblasting, the surface shall be wetted sufficiently in advance of shooting with shotcrete or with cement mortar so that while the repair material is being appUed, the surfaces under repair will remain moiat, but not so wet as to overcome the suction upon which ogood bond depends. The material used for repair proposed ehe|| consist of a mixture of one sack ofcement to 3 cubic feet of sand. For exposed vva||s, the cement shall contain such a proportion of Atlas white pod|and cement as is required to make the color ofthe patch match the color ofthe surrounding concrete. C. All repairs shall be built up and shaped in such a manner that the completed work will conform to the requirements of this Section, using approved methods which will not disturb the bond, cause sogging, or cause horizontal fractures. Surfaces of said repairs oho|| receive the manna kind and amount of curing treatment as required for the concrete in the repaired section. A. General: The Contractor shall protect all concrete against injury ordomagafnomexoeaoivehaat lack nfmoisture, overstress, or any other cause until final acceptance by the City. Particular care shall be taken to prevent the drying of concrete and to avoid roughening or otherwise damaging the surface. Any concrete found to be damaged, or which may have been originally defective, or which becomes defective at any time prior to the final acceptance of the completed work, or which departs from the established line or grade, or which, for any other reason, does not conform to the requirements of the Contract Documents, shall be satisfactorily repaired or removed and replaced with acceptable concrete atthe Contractor's expense. TECHNICAL SPECIFICATIONS Section 03310-6