CONTRACT 5944 Public Works Contract CLOSEDAgreement No. 5944 PUBLIC WORKS CONTRACT BETWEEN THE CITY OF EL SEGUNDO AND HARDY AND HARPER, INC. FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 This CONTRACT is entered into this 2nd day of November. 2020, by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ("the City") and HARDY AND HARPER, INC., a California Corporation ("the Contractor"). A. The Contractor agrees to perform the work listed in the Contract Documents, "Exhibit Al and Exhibit AT", copies of which are attached and incorporated herein by this reference. The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents. B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents; C, The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings. 2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed Three Hundred Sixty -Four Thousand. Seven Hundred Thirtv-Nine Dollars ($364,739.00) which includes the original bid amount of $312,000.00 as well as a contingency amount, which may or may not be used, of $52,739.00 for the Work in the manner set forth in the Contract Documents. The City may adjust this amount as set forth in the Contract Documents. Agreement No. 5944 TERM. The term of this Contract will commence on August 24, 2020 and will expire on March 1, 2021, unless terminated earlier pursuant to Section 4. 4. TERMINATION, A. City may terminate this Contract at any time with or without cause. B. Contractor may terminate this Agreement at anytime with City's mutual consent. Notice will be in writing at least thirty (30) days before the effective termination date. C. Upon receiving a termination notice, Contractor will immediately cease performance under this Agreement unless otherwise provided in the tennination notice. Except as otherwise provided in the termination notice, any additional work performed by Contractor after receiving a termination notice will be performed at Contractor's own cost; City will not be obligated to compensate Contractor for such work. D. Should the Agreement be terminated pursuant to this Section, City may procure on its own terms services similar to those terminated. E. By executing this document, Contractor waives any and all claims for damages that might otherwise arise from City's termination under this Section. 5. PREVAILING WAGES. Pursuant to Labor Code § 1720, and as specified in 8 California Code of Regulations § 16000, the Contractor must pay its workers prevailing wages. It is the Contractor's responsibility to interpret and implement any prevailing wage requirements and the Contractor agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws. See Section 7-2 of the Standard Specifications. 6. DISPUTES. Disputes arising from this Contract will be determined in accordance with the Contract Documents and Public Contracts Code §§ 10240-10240.13, 7. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third -party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the "Notice" section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third -party claim. 8. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number, 9. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole Agreement No. 5944 expense, will obtain and maintain during the term of this Contract, all necessary permits, licenses, and certificates that may be required in connection with the Work, 10. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the City's property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City's written notice. 11. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification. 12. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor will act as an independent contractor and will have control of all work and the manner in which is it performed, The Contractor will be free to contract for similar service to be performed for other employers while under contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doingthe work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only. 13. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents. 14. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: The Citv City of El Segundo -Public Works 350 Main Street El Segundo, CA 90245 Lifan Xu, City Engineer 310-524-2368 Agreement No. 5944 The Contractor Hardy and Harper, Inc, 32 Rancho Circle Lake Forest, CA 92630 Dan T. Maas, President 714-444-1851 Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph, 15, NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations under this Contract. 16. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County. 17. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows: A. This Contract; B. The Standard Specifications; and C. Precedence of documents as determined in the Standard Specifications, 18. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect. 19. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract may be modified by written amendment. The City's city manager, or designee, may execute any such amendment on the City's behalf. 20. ACCEPTANCE OF ELECTRONIC SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by Agreement No. 5944 electronic (.pdf) or facsimile transmission. Such electronic or facsimile signature will be treated in all respects as having the same effect as an original signature. 21, COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 22. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract. 23. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents. IN WITNESS WHEREOF the parties hereto have executed this Contract the day and year first hereinabove written. CITY OF EL SEGUNDO -,Er Cott Mitnick City Manager ATT T: for Tracy Weaver, City Clerk APPROVED AS TO FORM: —ZA � lc--� for Mark D. Hensley, City Attorney ° Insurance Reviewed by: Joseph ulho HA DY AND HARPER, INC, Dan T. Maas President Taxpayer ID No. 95-2251022 Contractor State License No.: 21 5952 "A, C-8, C-12" Contractor City Business License No.: July 1, 2020 Agreement No. 5944 Ex.".1.1'1".R] ,. 1, B ADDENDUM NO. 1 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 J ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time are still Tuesday, July 7, at 11:00 am 2. Please see this project's attached Supplemeno Addendum 1 for contractor questions, the City's responses to them, and additional information provided during the job walk. 3. Please note the changes to the bid opening procedure listed in the Supplement. As evidence that the BIDDER has read this Ad1-i' Uri, the BIDDER must acknowledge same in the space provided below and submitAddendum with the Bid Proposal. Failure to provide such acknowledgement s ader the bid as non-responsive and subject to rejection. Signature: M Print Company Name rray - VfCe Prer'ddnt Page 1 of 1 Date: 07/01/2020 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 5944 CITY OF EL SEGUNDO PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 ADDENDUM NO. 1 SUPPLEMENT DATE: July 1, 2020 TO: All Prospective Bidders The following questions have been raised regarding this bid. The response to each question is provided here and made available to all prospective bidders. Further, a summary of requirements discussed in Council Chambers at the pre-bid meeting are listed on Page 3. The information and clarification provided in this Addendum shall be considered as incorporated into the specifications for the above -referenced project. All other portions of Contract Documents and previous Addenda not specifically mentioned in this Addendum remain in force. Question 1: Does the 25 working days include construction days for the alternative California Street sections? Answer: No. An additional five (5) working days will be added to the contract time if the California Street alternative bid item is approved. Question 2: On Pine Avenue, is the area with diagonal parking part of the project scope? Answer: Yes. Grinding, paving, re -striping, etc. in the area with diagonal street parking is included as part of the E. Pine Avenue project scope. Question 3: What are the work hours for the three streets again? Answer: E. Imperial Avenue: 9:00 am to 3:00 pm E. Pine Avenue: 9: 7:00 am to 4:00 pm (Alternative California Street bid item): 9:00 am to 3:00 pm Question 4: What is the speed limit on eastbound E. Imperial Highway? Answer: 50 mph. A traffic control plan will be required for all street sections and, if approved, for California Street. Question 5: What school is near Pine Avenue? Answer: Agreement No. 5944 1. Center Street Elementary School, on Center Street and E. Mariposa Avenue, is one block north of E. Pine Avenue. August 26, 2020 is scheduled as the first day of school this year. The school's contact information is listed below. www.ceiiterstreetsellool.or 700 Center St, El Segundo, CA 90245 (310) 615-2676 2. E1 Segundo Middle School, on Center Street and E. Holly Avenue, is one block south of E. Pine Avenue. Historically the school has re -opened on the second Tuesday in August. The school's contact information is listed below. www.else�-,tindotiiiddles,chool.or 332 Center St, El Segundo, CA 90245 (310) 615-2690 JULY 7, 2020 CHANGES TO THE BID OPENING PROCEDURE: City Hall is located at 350 Main Street, El Segundo, CA 90245. At this time it is uncertain which City Hall entry points will be accessible to the public when the building re -opens next week. Given that, please follow the procedure below for next Tuesday's bid opening: 1. Each bidder's representative is required to wear a mask and maintain a 6 -foot distance when interacting with City staff and others, and when they are inside the building. 2. Instead of the City Clerk's Office, the bid opening will be held either in the City Hall Council Chambers or in the foyer in front of the Council Chambers. These areas are accessible through the double automatic doors on the west end (Main Street side) of the City Hall Building. The double doors will be unlocked and opened 15 minutes prior to the bid opening. 3. Bidders are more than welcome to submit their bid by the US postal service or other carrier service. However, the bidder is resvonsible for veriNinR thcir bid has been received in the Citv Clerk's Office iwior to the bid opening. nine. The City Hall number is 310-524-2300. Agreement No. 5944 4. Bidders can also choose to submit bids in person. The City Clerk's Office will open the doors 15 minutes before the bid opening and will accept bids at that time. Please plan to be there early enough so that your bid may be received well before 11:00 am, in case there are multiple bidders there to do the same thing. 5. The City Clerk's Office will collect bid packages and record them on a log sheet. Having submitted their bid, bidders will wait outside the double doors in the quad until the bid opening. Bid packages will either be opened in the Council Chambers or in the foyer. Bid amounts will be recorded on the log sheet and the log sheet will be signed by representatives from the City Clerk's Office and the Public Works Department. The Public Works Department will email the bid log sheet to all planholders shortly after the bid opening. Agreement No. 5944 NOTICE INVITING SEALED BIDS FOR THE FY 19/20 PAVEMENT REHABILITATION PROJECT IN THE CITY OF EL SEGUNDO PROJECT NO.: PW 20-01 The City of El Segundo is accepting sealed bids in the City Clerk's office, 350 Main Street, E1 Segundo, California 90245, until 11:00 a.m. on: TUESDAY, JULY 7, 2020 at which time they will be publicly opened. Bids will not be accepted after that time. As described in the Bidding Documents, the bids are for a public works project ("Project") which consists of traffic control, centerline tie surveys, asphalt cold milling, hot mix asphalt paving, manhole adjusting, valve cover adjusting, striping and pavement markings, and related work. The construction shall take place between August 24 and October 16, 2020. Work on the Project must be performed in strict conformity with Specifications No. PW 20-01 as adopted by the El Segundo City Council on June 16, 2020 which is filed with the Public Works Department. Contractors bidding the project shall provide a minimum of five government agency references, preferably municipal, for building similar projects (in terms of scope, size, type, magnitude and complexity), as the prime contractor in the past five (5) years. Bidders shall include references, etc. to demonstrate qualifications. Copies of the Plans, Specifications, Contract Documents and Engineer's estimate are available from the Engineering Division of the Public Works Department, City of El Segundo, 350 Main Street, EI Segundo, California, 90245. Plans And Specifications are alternately available electronically via lit-_�pt s:/lwww.elseLtindo.org�govem•titilentldet)fir-ttiiieiitS/` 13Ljblic-works/►-e(IlLie«'t- Dublic-works-bid A MANDATORY pre-bid meeting is scheduled for Monday, June 29, at 10:00 AM. The meeting will be held at the northwest corner of the E. Imperial Avenue/California Street intersection in E1 Segundo, CA 90245. Failure to attend the mandatory meeting will disqualify your bid. Appendix 5 shows the project streets. All questions regarding the project are due to littt)s://www.else ttrido.org�gover►iineiit/devat°tiiients/i)ublic-works/regtiest-LILiblic- works-laid by Tuesday, June 30, 2020, at 3:00 pm. The terms and conditions for bidding on the Project are described in the attached Bidding Instructions. This project requires payment of State prevailing rates of wages for Los Angeles County. The I -A-1 Agreement No. 5944 contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at www.dir.ca.gov. Note that the Project is subject to compliance monitoring and enforcement by California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code §§ 1725.5 and 1771.4 to be nonresponsive. The contractor to whom the contract is awarded must assist in locating, qualifying, hiring and increasing the skills of minority group employees and applicants for employment, as set forth in Executive Order 11246 and 11375. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The City of El Segundo hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code ("PCC") § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, any such election will be at Contractor's own expense and will include costs incurred by the City to accommodate the Contractor's request. In entering into a Public Works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor, or Sub -Contractor, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 167001 of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties. Bids must be prepared on the approved Proposal forms in conformance with the Instructions to Bidders and submitted to the City Clerk, 350 Main Street, City of El Segundo, in a sealed I -A-2 Agreement No. 5944 envelope plainly marked on the outside: FY 19/20 PAVEMENT REHABILITATION PROJECT "SEALED BIDS FOR PROJECT NO.: PW 20-01 IN THE CITY OF EL SEGUNDO DO NOT OPEN WITH REGULAR MAIL" The bid must be accompanied by a bid bond, made payable to the City of El Segundo for an amount no less than ten percent (10%) of the amount bid for the base contract. No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the State Business and Professions Code. For these projects, those acceptable classes of license shall be "A" and "C-12". The successful Contractor and his Sub - Contractors will be required to possess the correct license for their project classifications, and valid City Business Licenses from the City of El Segundo. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. Any contract entered into pursuant to this notice shall become effective or enforceable against the City of El Segundo only when the formal written contract has been duly executed by the appropriate officer(s) of the City of El Segundo. DATED this day of 32020. CITY OF EL SEGUNDO, CALIFORNIA Tracy Weaver, City Clerk I -A-3 State of California County of Orange Agreement No. 5944 HUGH NGUYEN CLERK -RECORDER CERTIFICATE OF ADMITTED SURETY INSURER Certificate pursuant to 995.640(a) Code of Civil Procedure PROPERTY RECORDS BIRTH AND DEATH RECORDS MARRIAGE LICENSES /RECORDS PASSPORTS FICTITIOUS BUSINESS NAMES NOTARY REGISTRATION ORANGE COUNTY ARCHIVES 1, Hugh Nguyen, County Clerk -Recorder of the County of Orange, State of California, in and for said County, DO HEREBY CERTIFY THAT FIDELITY AND DEPOSIT COMPANY OF MARYLAND has been issued a Certificate of Authority as an Admitted Surety Insurer by the State of California Insurance Commissioner who authorized the Insurer to transact Surety Insurance in the State of California and that based on the records in this office, that authority has not been surrendered, revoked, cancelled, annulled or suspended, In Testimony Whereof, I execute this certificate and have hereunto set my hand and affixed the seal of said County on 09/09/2020. Hugh Nguyen, Orange County Clerk -Recorder I,/Dcput p Clerk -Recorder NORTH COUNTY BRANCH OFFICE ORANGE COUNTY OLD ORANGE COUNTY SOUTH COUNTY BRANCH OFFICE WELLS FARGO BUILDING COUNTY ADMINISTRATION SOUTH COURTHOUSE LAGUNA HILLS CIVIC CENTER 222 S. HARBOR BLVD,, STE 110 601 N, ROSS STREET 211 W, SANTA ANA BLVD. ROOM 201 2,1031 EL TORO ROAD, SUITE 150 ANAHEIM, CALIFORNIA 92805 SANTA ANA. CALIFORNIA 92701 SANTA ANA. CALIFORNIA 92701 LAGUNA HILLS, CALIFORNIA 92653 (714) 834-2500 0 FAX (714) 834-2675 * WWW.00RECORDER.COM 9 WINW.00ARCHIVES'Com Agreement No. 5944 THE FINAL PREMIUM IS PREDICATED ON THE FINAL CONTRACT AMOUNT FAITHFUL PERFORMANCE BOND FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Hardy & Harper, Inc. ("PRINCIPAL") and Fidelity and Deposit Company of Maryland . a corporation incorporated under the laws of the State of Illinois and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of THREE HUNDRED TWELVE THOUSAND DOLLARS ($312.000.00), lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, SPECIFICATIONS NO. PW 20-01, and the Public Works Contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 20-01, a copy of which is on rite with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. CITY has estimated the required amount of the bond as shown above. 2. PRINCIPAL's work on the Public Project will be done in accordance with CITY's plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor. 3. PRINCIPAL will guarantee its work against any defective work, labor, or materials on the Public Project for a period of one (1) year following the Public Project's I -E-1 Agreement No. 5944 completion and acceptance by CITY. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 20-01 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the Contract documents or of the obligation to be performed. 6. This bond consists of this instrument, the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PACE] am SIGNED AND SEALED this 20th day of Ha & Harper, Inc. Ps A'sPPESII)EN r DE T. Maas 6 PRRqCIPAq.s SECRETARY Kristen Paulino PRINCIPAL's MAILING ADDRESS: Agreement No. 5944 August 2020 Fidelity and Deposit Company of Maryland SURETY)kXpVj&8H)E= Dwight Reilly, Attorney -in -Fact SURETY's SECRETARY SURETY's MAILING ADDRESS: Hardy & Harper, Inc. Fidelity and Deposit Company of Maryland 32 Rancho Circle 777 South Figueroa Street, Suite 3900 Lake Forest. CA 92630 Los Angeles, CA 90017 NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Offlce. (2) Bond shat! be effective for one (I) year after acceptance of the job. I -E-3 Agreement No. 5944 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On 08/20/2020 before me, Melissa Ann Vaccaro, Notary Public (insert name and title of the officer) personally appeared Dwight Reilly who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature )C���,i-,U(Seal ) Melissa Ann Vaccaro Agreement No. 5944 Bond No. 7664078 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND Still l+TYC"OIIPANY 111)1=: ATV AND DEPOSIT COMPANY OFMARYLAND POWER OE<A'ITORNEY KNOW ALL MEIN BYTHESE PR1 SINE'S: 'Chat the ZURICH AMERICAN INSURANCl COMPANY, at corporation orthe State of New York, the COLONIAL AMERICAN CASUALTY AND SURE'l Y COMPANY, a corporation of the State of Illinois, anti the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation orthe State ofIllinois (herein collectively called the "Conlpan'ics"), by Robert 1). Murray, Vice President, in pursuance otauthority granted by Article V, Section 8, orthe By -Laws of said Companies, which arc set forth ort the reverse side hereofand are hereby certified to be it) flill tbrce and effect oil the date hereof, do hereby nominate, constitute, and appoint Dattiel HUCKARAY, Dwight REIE.,I.Y, Arturo AYALA., Shaunila ROZE'LLE OSTROM, Frank NIORONE:S, IEen STONC, Michael 1). STONC, and JL NAPPI, all of Orange, California, EACI l its true and lawful agent and Attorney-in-fact, to make, execute, seal and deliver, for, and oil its behalf as sorely, and as €is act and deed: any and all bonds and undertakings, and the execution of such bonds or LIMICrlakings in pursuance ofthese presents, shall be as balding uport said Companies, as folly and arllply, it) all intents and purposes, as if they had been duly executed and acknowledged by tine regularly clecled officers or the ZURICI I AMERICAN INSURANCE' C'OEvII't1NY at its oil -ice in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDETI FY AND DEPOSIT COMPANY 01' MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby ccrtity that the extract set Barth oil the reverse side hereof is a true copy of Article V, Section 8, of the By -Laves of said Companies, and is novo in force. IN WITNESS Wl IEREO1", the said Vice -President has hereunto subscribed his/her names and affixed the Corporate: Seals of the said ZURICH AMERICAN INSURANCL COMPANY, COLONIAL ANIFRIC'AN CASU.AU-'1'Y AND SURETY C ONIPANY, and FIDELITY AND DEPOSIT COI`IPANY O1= MARYLAND, this 15th clay of.lanuary, A.E. , 2020 Ya '`pnWgt��L �„M 9AL A`1 TE ST: ZURICII AMI:RECAN INSURANCE, CO3NIPANY COLONIAL AMERICAN CASUALTYAND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OEt i1IARYLAND 13.v. Rotten C), hdurru_t, fire Presitlertt til'- Down I'. Brown Ser.'relllt'S' State of Maryland County of Baltimore On this 15th day of lanuat'y, A.D. 2020, before the subscriber, it Notary I'uhlic orthe State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Down E. Brown, Secretary of the Companies, to me personally knuvvn to be tfte individuals and ofitcers described in and who exeeuted the preceding instrument, and acknowledged the execution of'same, and tieing by nse duly sworn, deposeth and said}, that helshe is the: said ollicer of the Company aforesaid, and that tile; seals affixed to t€le preceding instrument are the Corporate Scats of said Companies, and that the said Corporate Seals and t€se signature as such officer were duly attixed and subscribed to the said instaanent by the authority and direction cif the said Corporat tolls. IN TESTIMONY Wl IFRGOF, I have hereunto set my hand and affixed my Official Seal the Clay and year first above written. j., pjj-S` 5.' Constance A. Dural, Notary Public My Commission E:xpiras: July 9 2€}23 Jrt1t o lW �� Agreement No. 5944 EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V. Section 8, Attornevs-in-Fact. The Chief Executive Officer, the President, or any I?xecu(ivc Vice President or Vice President may. by written instrument trader the attested corporate seal, appoint attorneys -in -fact with authority to execute bo€ids, policies, rccoguiranCCS. stipulations, undertakings. or other like instruments on behalf of the Company. and may authorize any officer or any such attorney-in-fact to affix the corporate seal thereto, all([ may 1Vith or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE L the undersigned. Secretary of the ZUIUClI AMFRiC'AN INSUIZANCE, CONIIIANY, Ole COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIEDI_,1,1I'Y AND DI;J'O.SIT COMPANY Of- MARYE.AND, do hereby certify (flat. the foregoing Power of Attorney is still in fall force and eflcct on the date of this certificate: and I do further certify that Article V, Section 8, of the By - Laws of the Companies is still in (brce. This Power of Attorney and Certificate may he signed by lacsitnile under and by authority of'the folloVVing resolution of the Board of Directors of (lie ZURICI I AMERICAN [NS( IRANCE; COMPANY at a €nceting (July called and held on the 15th day of December 1998. RESOLVED: "`['fiat the signature of the President or a Vice President and the attesting signature ofa Secretary or am Assistant Secretary and the Seal of the Colnpally inay he affixed by facsimile on Filly Povver of Attorney. -Any Such Power or any certificate thereof bearing such facsimile signature and seal Shall be valid and Milting {tit the Company." This Power of` Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of (lie Board of Directors of the COLONiAL AMERICAN CASUALTY AND "if METY COMPANY at a meeting (July called and held on (he 5th day of May. 1994. and the lollowing resolution of the Board of Directors of the F10FLITY AND DEPOSIT COM ['ANY OF MAIZYI,AND at a meeting duly called and held au the 14th day ofMay, 1990. RI".SOI.VE D: ""that file facsimile or mechanically reproduced seal ofthe company and facsimile or mechanically reproduced signature of - any Vice -President. Secretary, or Assistant Secretary of the Company, whether nia€de heretoli>re or hereafler, wherever appearing upon ca certified copy orally power of attorney issued by the Company, shall be Valid and binding upon the Company with the same force and effect as (hough inalluahlyaffixed. IN TFSTIMONY W11FREOF. I have hereunto subscribed my mime and affixed the corporate scalls of (lie said Companies. this 20th day of August 2020 Unn,, QTY01 SEAL 13y: Brian M. I Judges vice Presldelit TO RE;POR'I' A CI_,AiNI N\'l'I'll RITGARD `I'O A SURE']')' BOND, PLEASE, SUB1\111C A COM PLL,"I`E IDESCRIP'1"ION OF'1'11E CI.,AIM INCLUDING 1*11E PRINCIPAL ON `Fiff. BOND,T11E BOND NUMBER, AND "YOURCON'FACT INFORMA11ON'1170: Zurich Surety Claims 1299 Zurich Way Schaumburg, IL 60196-1056 lywii,.retaoi tsfclai nisttizurielina.coiii 800-626-4577 Agreement No. 5944 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE 1189 . . . . . . . . . . . . ..... A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On AugUsL20.2020 before me, Ashlie Blanchard. Notary Public Date Here Insert Name and Title of the Officer personally appeared Dan T. Maas and Kristen Paulino Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) k/are subscribed to the within instrument and acknowledged to me that tx/sKee/they executed the same in Ns/her/their authorized capacity(ies), and that by Kt/hmr/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. L Place Notary Seal Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official sea]. Signature Signature of Notary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: El Corporate Officer — Title(s): 0 Partner — El Limited 0 General 0 Individual 0 Attorney in Fact 0 Trustee 0 Guardian or Conservator 0 Other: Signer Is Representing: Signer's Name: [:,,Corporate Officer — Title(s): 0 Partner — C Limited E-1 General [1, Individual Cl Attorney in Fact E, Trustee 0 Guardian or Conservator E Other: Signer Is Representing: 02014 National Notary Association - www.NationaiNotary.org - 1 -800 -US NOTARY (1-800-876-6827) ltern#5907 THE FINAL PREMIUM IS PREDICATED ON THE FINAL CONTRACT AMOUNT I Agreement No. 5944 FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Bond No. 7664078 Bond Fee: Included in Perf Bond Hardy & Harper, Inc. . as principal ("PRINCIPAL") and Fidelity and Deposit Company of Maryland a corporation incorporated under the laws of the State of Illinois and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of THREE HUNDRED TWELVE THOUSAND DOLLARS ($312.000.00). lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which such PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. This bond is conditioned upon and guarantees payment by PRINCIPAL to Contractors, Subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL'S Subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in SPECIFICATIONS NO. PW 20-01 ("Public Project"), the Public Works Contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default, BOND CONDITIONS I. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 20-01, and the Public Works Contract executed for such Specifications, copies of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles which are made a part of this, bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. 2. PRINCIPAL will pay all Contractors, Subcontractors, and persons renting equipment. I -F -I Agreement No. 5944 3. PRINCIPAL will pay for all materials and other supplies, for equipment used in, on, for or about the performance of the Public Project, and will pay for all work and labor thereon. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ('ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 20-01, or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the Contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted. 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -F-2 SIGNED AND SEALED this 20th day of Ha 0y & Harp r, Inc. mi L' PIrSbf-N-T :1 � 4" a Da T, PRINCIPALvs SECRETARY Kristen Paulino PRINCIPAL's MAILING ADDRESS: Agreement No. 5944 August 2020 Fidelity and Deposit Company of Maryland SURETY)§TJtMEqWT Dwight Reilly, Attorney -in -Fact SURETY's SECRETARY SURETY's MAILING ADDRESS: Hardy & Harper, Inc. Fidelity and Deposit Company of Maryland 32 Rancho Circle 777 South Figueroa Street, Suite 3900 Lake Forest, CA 92630 Los Angeles, CA 90017 NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (I) year after acceptance of the job. I -F-3 Agreement No. 5944 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document, State of California County of Orange On 08120/2020 before me, Melissa Ann Vaccaro, Notary Public (insert name and title of the officer) personally appeared Dwiqht Reilly who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct, WITNESS my hand and official seal, Signature {Seal} Melissa Ann Vaccaro Agreement No. 5944 Bond No. 7664078 ZURICH AMERICAN INSURANCE COMPANY COLONIAL ANIERICAN CASUALTY AND SURETYCOfNIPANY FIDELITY AND DEPOSIT COMPANY OF NIARYLAND POWER OF ATTORINNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation ofthe State of Illinois. and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 3. of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate. constitute, and appoint Daniel HUCKABAY, Dwight REILLY, Arturo AYALA, Shaunna ROZELLE OSTROM, Frank NNIORONES, Ben STONG, Michael D. STONG and R. NAPPI, all of Orange, California, EACH its true and lawful agent and Attornev-in-Fact. to make. execute, seat and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents. shall be as binding upon said Companies. as fully and amply, to all intents and Purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE CONIPANY at its office in New York, New York.. the regularly elected officers of the COLONIAL ANIERICAN CASUALTY AND D SURETY COMPANY at its office in Owings Mills, Maryland- and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF ,MARYLAND at its office in Owings Mills. Mar -viand.. in their ovvii proper persons, The said Vice President does hereby ccrtifp that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8- of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seats of the said ZURICH ANIERICAN INSURANCE CONIPANY, COLONIAL ANIERICAN CASUALTY AND SURETY CO-MPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this l5th day of January. A.D. 2020, N 5, HAL ATTEST: 91— ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTYAN'l) SURETYCOMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND BY Robert D,;V1urrq ' v Vice President BY: Dmw? E. Brown SecrerarIv State of Maryland County of Baltimore On this 15th day of January, A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray Vice President and Dawn E. Brown. Secretary of the Companies, to me personally knov"n to be the individuals and officers described it) and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies. and that the said Corporate Seals and the signature as such officer were duly affixed mid subscribed to the said instrument by the authority and direction of the said Corporations, IN TESTUvIONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day e and year first above written. III It I t (fit, Constance A. Dunn, Notary Public My Commission Expires: July 9,2023 Agreement No. 5944 EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V. Section 8. Attorneys -in -Fact. The Chief Executive Officer, the President. or any Executive Vice President or Vice President may. by written instrument under the attested corporate seat, appoint attorneys -in -fact with authority to execute bonds, policies. recognizances. stipulations. undertakings. or other like instruments on behalf of the Company, and may authorize any officer or any such attorney-in-fact to affix the corporate seat thereto, and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE 1, the undersigned. Secretary of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY CO1vIPANY. and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate. and I do further certify that Article V, Section 8. of the By - Laws of the Companies is still in force. This Power ofAtiorriev and Certificate may be signed by facsimile under and by authority of the following resolution or the Board of Directors of the ZURICFf,-kMERJCAN [INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Sea) of the Company may be affixed by facsimile on any Power of Attorney.,,Any such Power or any certificate thereorbearing such facsimile signature and sea] shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the nth day of ,Mav, 1994. and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a Mectino duly called and held on the 10th day of'?Vlav, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same lbre.- and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seats of the said Companies, this. 20th day of Auqust 2020 SEAL By: Brian M. Hodges Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: Zurich Surety Claims 1299 Zurich Way Schaumburg, IL 60196-1056 wwlv.revoi-tsfc[aim sfaizuriclina.com 800-626-4577 Agreement No. 5944 No, 2479-4 STATE OF CALIFORNIA DEPARTMENT OF INSURANCE SANT FltkNCISCO Amended Certificate of Authority J THIS IS TO CERTIFY ,hot, pursuant to the Insurance Code of dle State of California, Fidelity and Deposit Company of Maryland offifinois. orgonizedundcr the laws OfIllinois, subject to itsArdcles ofIncorporatior orolherjundatnentai organizational documents, is herekv authorized to transact within this State, subject to all provisions qj I this Certificate, the JbIlowing classes of insurance.. Fire. Nlarine, Suretv, Plate Class, Liability Workers' Compensation, Boiler and Machinery, Burglary, Credit, Sprinkler, Team and Vehicle. Automobile, Aircraft and Miscellaneous us such cusses are Doti or ntdrt Frereafier be do/tried in the Insurance Latt.s of the State California, THIS CERTIFICATE is expressly conditioned upon the holder hereof now and herealier being in -full compliance with all, and not in violation a{any, of the applicable latus and lawful requirentenis matte under authority of the lenvs of theState of California as long as such laws or requirements are in effect and applicable, anti as such h7ws and requirements now are, or neat' hereafter be changed or amended. N* WITNESS WHEREOF, OjWtire as of the 12111 daY of :March. 2019, 1 have set atv hand and caused my official seal to be axed this 12'h dtal of March, 2019. Ricardo Lars � z. �: ..,moi wi.': �: -�.... BY Valerie Sarfaty for Catalina Ha-ves-Bautista Insurance CriqfDepu,7v NOTICE; Qualification with the Secretary of State most be accomplished as required by the California Corporations Code promptly after issuance of this Certificate of Authority. Failure to do so will be a violation ohnsurance Code section 701 and will be grounds for revoking this Cerificare of Authority pursuant to the covenants made in the application thercfar and the conditions contained herein. Agreement No. 5944 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Oranqe On _Atioust 20 202-0-.-. before me, Ashlie Blanchard, Notary Public Date Here Insert Name and Title of the Officer personally appeared Dan T. Maas and Kristen Paulino Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) iS/are subscribed to the within instrument and acknowledged to me that Ile/sKe/they executed the same in he/her/their authorized capacity(ies), and that by NG/hxr/thei r sig nature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. J'' . {_.,_ :' Signature o. i:, Signature of Notary Public j... Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Signer(s) Document Date: Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: 0 Corporate Officer — Title(s): El Partner — El Limited El General * Individual 0 Attorney in Fact * Trustee 0 Guardian or Conservator * Other: Signer Is Representing: Signer's Name: 0 Corporate Officer — Title(s): 11 Partner — 0 Limited 0 General 0 Individual 0 Attorney in Fact 0 Trustee 0 Guardian or Conservator E, Other: Signer Is Representing: 02414 National Notary Association - www.NationalNotary.org - 1 -800 -US NOTARY (1-800-876-6827) Item #5907 Agreement No. 5944 CONTRACT DOCUMENTS PLANS & SPECIFICATIONS FOR FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 350 MAIN STREET EL SEGUNDO, CA 90245 310-524-2300 https://www. elsegundo. org/government/departments/city-clerk/bid-rfp littt)s://'www.elsel,)Lliido.or�,li)ovei-rinient/ evai-tinents/i)Libiic-works/re0Ljestq)ubIic-",orks-bid MANDATORY PRE-BID MEETING MONDAY, JUNE 29, 2020 AT 10:00 AM At the northwest corner of the E. Imperial Avenue/California Street Intersection EL SEGUNDO, CA 90245 BIDS DUE TUESDAY, JULY 7, 2020 AT 11:00 AM Agreement No. 5944 BIDS WILL BE RECEIVED UP TO THE HOUR OF 11:00 A.M. TUESDAY, JULY 7, 2020 IN THE OFFICE OF THE CITY CLERK CITY HALL 350 MAIN STREET EL SEGUNDO, CALIFORNIA 90245 AT WHICH TIME THEY WILL BE PUBLICLY OPENED a Agreement No. 5944 PROPOSAL FOR THE FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Date 07/01 , 20 20 Company Name: Hardv & Harper, Inc. TO THE CITY OF EL SEGUNDO: In accordance with the City of El Segundo's Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and contract documents therefor, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other contract documents. Submittal of this bid shall be considered evidence that the BIDDER has satisfied himself regarding the contract documents, access and any other field conditions which may effect bid prices. If this proposal is accepted for award, BIDDER agrees to enter into a contract with the City of EI Segundo at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to the City of El Segundo of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the City of EI Segundo's notice of award of contract to the BIDDER, including sending by U.S. Mail a Public Works Contract for signature by the Awardee, the proceeds of the security accompanying this bid shall become the property of the City of El Segundo and this bid and the acceptance hereof may, at the City of El Segundo's option, be considered null and void. Agreement No. 5944 EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFFIRMATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION AFFIDAVIT BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the City of El Segundo is personally interested, directly or indirectly, in this proposal; that'this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud. I -C-2 Agreement No. 5944 BID SCHEDULE FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: Hardy & Harper, Inc. BASE BID ITEMS Item Unit Price Total No. Description Qty Unit M ($) Mobilization/Demobilization including traffic `If1,7Z 381Sgl.a 1 control (not to exceed 5% maximum of Total Base Bid) I. LS 2 Cold mill 2" existing asphalt concrete pavement 144,380 SF . HZ. 6m4m- 3Overlay 2" C2 PG 64-10 hot mix asphalt 144,380 SF , 131 t 315.101 Adjust sewer and storm drain manhole covers 4 l2 EA ( $fry to final grade _ 5 Adjust water valve covers to finalrade 29 EA liia fe Remove and replace all traffic striping, 6 pavement markings, and pavement markers. 1 LS Thermoplastic to be used for all striping and markings. See Appendix 6. ................ ALTERNATIVE BID ITEM Determine b the �t ( Y j' on an as -needed basis) q 7 6 -inch dee asphalt repairs Q p p p 1,000 1 SF t0 i t OI00 ALTERNATIVE BID ITEM (Determined by the City on an as -needed basis) Grind and overlay of California Street between Imperial Highway and Cul-de-sac (including California StAm erial Ave. intersection) pCold _ mill 2" existingasphalt concrete pavement�--mmmmITIT ._. p.......................................34,986 8 SF .12- r . tZr 9 Overlay 2" C2 PG 64-10 hot mix asphalt 34,986 SF .91 .31 1431 .t 10 Adjust sewer and storm drain manhole covers 2 EA to final grade 11 1 Adjust water valve covers to final grade 2 EA Q _ _ app Remove and replace all traffic striping, 12 pavement markings, and pavement markers. I LS Thermoplastic to be used for all striping and markings. See AEpendix 6. TOTAL BID = 31L 000-00 TOTAL BID WRITTEN IN WORDS: All work listed on the bid schedule shall be per these specifications and attachments. Prevailing wage rates apply. The City of EI Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I -C-3 Agreement No. 5944 BIDDER'S INFORMATION Company Name: Hardy & Harper, Inc. BIDDER certifies that the following information is true and correct: Form of Legal Entity (i.e., individual, partnership, corporation, etc.) S. Corporation If corporation, State of Incorporation (i.e., California) California Business Hardy & Harper, Inc. Address 32 Rancho Circle Lake Forest, CA 92630 Telephone No. 714-444-1851 Facsimile No. 714-444-2801 State Contractor's License No. and Class 215952; A, C-8 & C12 DIR# 1000000076 State License Original Date Issued 03/13/63 Expiration Date 13/31/2021 The following are the names, titles, email addresses, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest in this proposal: Dan T. Maas -President, Treasurer- 32 Rancho Circle. Lake Forest, CA 92630 - 714-444-1851 Michael Murray - Vice President - 32 Rancho Circle. Lake Forest, CA 92630 - 714-444-1851 Steve Kirschner - Vice President - 32 Rancho Circle. Lake Forest, CA 92630 - 714-444-1851 Tanner Hambright - Vice President - 32 Rancho Circle. Lake Forest, CA 92630 - 714-444-1851 XR—sfe-ri S7T15U1 o - Corporate secretary - 32 Rancho Urcle, Lake Forest, (;A 9263U - 114-444--n"51 The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows: N/A All current and prior DBA's, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: N/A ...................... I -C-4 Agreement No. 5944 BIDDER'S INFORMATION (CONTINUED) Company Name: Hardy & Harper, Inc. Bidder shall list the name of the person who attended the mandatory pre-bid job walk: Name: Bry Marquez Title. Bid Runner I -C-5 Agreement No. 5944 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all a forenamed principals this 1 day of July 20 20 . M-TI1113-3-151 Hardy & Harper, Inc. Michael Murray, - Vice President Subscribed and sworn to this day of , 20 NOTARY PUBLIC I -C-6 Agreement No. 5944 CALIFORNIA JURAT WITH AFFIANT STATEMENT GOVERNMENT CODE § 8202 x❑ See Attached Document (Notary to cross out lines 1-6 below) ❑ See Statement Below (Lines 1-6 to be completed only by document signer[s], not Notary) Signature of Document Signer No. 1 Signature of Document Signer No. 2 (if any) ........................ A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange ww„ f Alts BLANCHARD 6' COMM .rrecx �pi #2279 50 N i, Notary Public -California ORANGE COUNTY u r0v Comm Expires Nlarch 3,,'i023 2" Seal Place Notary Seal Above Subscribed and sworn to (or affirmed) before me on this 1 day of JUN 20 20 , by Date Month Year (and (2)._..____. ) Name( of Signer) proved to me on the basis of satisfactory evidence to be the person(a) who appeared before me. Signature Signature of Notary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: 02014 National Notary Association • www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5910 BdngWe A_- 40 944 PROPOSAL GUARANTEE BID BOND FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.; PW 20-01 KNOW ALL MEN BY THESE PRESENTS that, Hardy & Harper, Inc. , as BIDDER, and Fidelity and Deposit Company of Maryland as SURETY, are held and firmly bound unto the City of El Segundo, in the penal sum of Ten Percent Prot Arnount Bid DOLLARS (SIL/6), which is ten (10%) percent of the total amount bid by BIDDER to the City of El Segundo for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to the City of El Segundo for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City of El Segundo. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this 2nd day of July 2020 BIDDER* Hardy & Harper, t . '132 Rancho Circle Lo Forest, CA 92630, (714) 444-1851 777 South Figueroa Street, Suite 3900 SURETY* Fidelity aeposit Company of Maryland Los Angeles, CA, 90017, (213) 270-0600 vp Dwight Reilly, Attorney -in -Fact Subscribed and sworn to this day of 1411 N. Batavia St., Suite 201, Orange, CA 92867 (714) 516-1232 20 NOTARY PUBLIC *Provide BIDDER/SURETY name, title, address and telephone number and the name, title, address and telephone number for authorized representative. I -C-7 Agreement No. 5944 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On 07/02/2020 before me, Melissa Ann Vaccaro, Notary Public (insert name and title of the officer) personally appeared Dwiqht Reilly who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Si9 nature M � " ���CC,CVND (Seal) Melissa Ann Vaccaro MELISSA ANN VACCARO COMM. #2241394 Notary Public -California � ORANGE COUNTY a' fw1+F Comm. Expires May 12, 2022 Agreement No. 5944 Bond No. CSBA-14404 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Daniel HUCKABAY, Dwight REILLY, Arturo AYALA, Shaunna ROZELLE OSTROM, Frank MORONES, Ben STONG, Michael D. STONG and R NAPPI, all of Orange, California, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 15th day of January, A.D. 2020. NAwaroil ,, IP aIEAL °C°�._\ low �J 0CAN! r � yew ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND ;dr By: Robert D. Murray Vice President By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 15th day of January, A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly swom, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations, IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. ...... ell y„ r*Ghxw`A, h* Constance A. Dunn, Notary Public My Commission Expires: July 9,2023 '✓P,Ptl Nptg5 qM^�� Agreement No. 5944 "Article V, Section 8, Atiorne,,j-in-Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by waritten Instrument Under the attested corporate seal, appoint anorrieys-in-lhel with audiority to execute bonds, policits. rccognizances, saipaal xciutas. andertaldnas. or other like instruments on behalf of the Company, and may authorize am officer or any stwb attorney-in-fact to aflix ilic corporate seal thereto; and may o,,ifli or %vidiout cause modify ofrevoke any such appointment or authority at any time. CERTIFICATE I, die undersigned, Secretary of the Z1.400-1 AMERICAN INSLqRANCF CCAJPANY, the COI,.ONL,\L AiNIERICAN CASkJAL I'Y AND Sl-"tome URECOMPANY, and the FIDI"I ITY AND DEPOSIT COMP,�,kNY OF MARYLAND, do hereby cer66that the lbrqp"Ting Power ofAttorney is still in fall force and effect on the date ofthis certificatc., and I do hinher certify that Art; - Laws of the Companies is still in force. icie N�', Scetion & Of Elie By Laws Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors ofthe ZURICH AMERICAN INSURANCE COMPANY at a meeting duty called and held on the 15th day ofDecember 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature ofa Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 10th day of May, 1990. RESOLVED: "'Mat the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 2nd day of JUIY 2020 ogseolls SEAL 31T Brian M. Hodges Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION OFT E CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: Zurich Surety Claims 1299 Zurich. Way Schaumburg, IL 60196-1056 800-626-4577 Agreement No. 5944 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On July_ 2. 2020 before me, Date personally appeared Michael Murrav Ashhe Blanchard, Notary Public Here Insert Name and Title of the Officer Name(;^ of Signer(l) who proved to me on the basis of satisfactory evidence to be the person(x) whose name(s) is/aye subscribed to the within instrument and acknowledged to me that he/sO(e/thpey executed the same in his/her/their authorized capacity(iQs), and that by his/har/their signature(i5) on the instrument the person(5a), or the entity upon behalf of which the person(x) acted, executed the instrument. Place Notary Seal Above certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature k Signature of Notary Public OPTIONAL ... Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: .............. _,,,,,_,,,,.— Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 02014 National Notary Association - www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5907 ASHLIE BLAMCHAROr COMM. #2279550 N Notary Public-Califernia 0 ORANGE COUNTYIL My Comm. Expires March 3, 2023�� Place Notary Seal Above certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature k Signature of Notary Public OPTIONAL ... Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: .............. _,,,,,_,,,,.— Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 02014 National Notary Association - www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5907 Agreement No. 5944 CONTRACTOR'S LICENSE DECLARATION (Business and Professions Code Section 7028.15) 1. BIDDER'S Contractor's License Number is: 215952 Class No.: A, C-8 & C12 2. The expiration date of BIDDER'S Contractor License is: 12/31 w 20 21 3. BIDDER acknowledges that Section 7028.15(e) of the Business and Professions Code provides as follows: "A licensed contractor shall not submit a bid to a public agency unless his or her contractor's license number appears clearly on the bid, the license expiration date is stated, and the bid contains a statement that representations herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non-responsive and shall be rejected by the public agency." The undersigned declares, under penalty of perjury, that the representations made by the undersigned in this bid proposal are true and correct. Executed on 07/01 Lake Forest, CA , 20 20, at SigNtata Michael Murray ........................................................ __.... Typed Name Vice President Title Hardy & Harper, Inc. Company Name I -C-8 rt City and State where Declaration signed). Agreement No. 5944 NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ) ss. County of Orange ) Michael Murray , being first duly sworn, deposes and say that he or she is Vice President of Hardy & Harper, Inc. ............ _.... the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Sigrlat� Michael Murr Typed Name Vice Preside Title I -C-9 Hardy & Harper, Inc. Name of Bidder/Company Name 07/01/2020 Date Agreement No. 5944 WORKER'S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) Pursuant to Section 1861 of the Labor Code, the BIDDER, in submitting his/her PROPOSAL, shall sign the following certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work))Fthis contract." Signature of Bidder Title: Business Name: Business Address- Telephone Number: Dated this 1 .................. Michae Murray -' Hardy & Harper, Inc. 32 Rancho Circle Lake Forest, CA ( ) 714-444-1851 day of July 2020 . I -C-10 sident Agreement No. 5944 DESIGNATION OF SUBCONTRACTORS FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: Hardy & Harper, Inc. As detailed in Section 2-3.1 (Page II -B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. Name of Subcontractor Address A jjj , (Number and Street) zq (City, Zip Code) (A 411,11 S•(utor 1 v �� 63 IL C{rre59 Sj E05 1) f, fl, �' .... Sub ............... - - — ,.,,, contractor's Contractor Description of License No., & Portion of DIR Registration Work Estimated No. Subcontracted $ Amount 1616 -7 ID o j CGS 100 (DIR #) 1 ..1 60600 �. _..... �........_...................�.� � -7.7 CO&i5i ( A 10 43 V 116805 Wi N- CcKhoic it- 45 — VRA71,1 cq qt���� �0beoo 153 ' 4vitt s,4,- 931.1 T......_ ...... Conn -13 C* IvIn .104600&1i' (Make copies of this page if add' iptial space is needed) 07/01/2020 atrarc of Bi Date Mic' elMurray - ce President Agreement No. 5944 DESIGNATION OF SUBCONTRACTORS FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: Hardy & Harper, Inc. As detailed in Section 2-3.1 (Page II -B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. Name of Subcontractor Address _W ....... — (Number and Street) (City, Zip Code) Subcontractor's Contractor Description of License No., & Portion of DIR Registration Work Estimated No. Subcontracted $ Amount (CSLB #) (DIR #) (Make copies of this page if additional space is needed) Signature of Bidder Date Agreement No. 5944 REFERENCES Company Name: Hardy & Harper, Inc. The following are the names, addresses, and telephone numbers for public agencies for which BIDDER has performed similar work as the prime contractor or major subcontractor within the past five (5) years: Project Title: Please see attached Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? 2, Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? I -C-12 Agreement No. 5944 3. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? 4. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? I -C-13 Agreement No. 5944 5. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ _._I ................. Date completed: Amount of work done by my/our firm under contract $._._ Did your firm have any financial interest in Project? Bidder may attach additional reference pages if necessary. The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance bonds: Fidelity & Deposit Company of Maryland - 777 S. Figueroa St. Los Angeles, CA 90017 -213-270-0600 Commercial Surety Bond Agency - 1411 N. Batavia St. Orange, CA 92867 - 714-516-1232, I -C-14 Owner/Agency City of Jurupa Valley 8930 Limonite Ave Jurupa Valley, CA 92509 City of Newport Beach 100 Civic Center Drive Newport Beach, CA 92660 PUBLIC WORKS REFERENCES 2017/2019 Contact Mike Myers (951) 332-6464 mmers��'aiururaaua_I Frank Tran (949) 644-3340 ftran cDnewportbeachca.aov City of Rancho Cucamonga Romeo M. David 10500 Civic Center Drive (909) 477-2740 Rancho Cucamonga, CA 91730 Romeo. David Mcitvofrc.us City of Signal Hill 2175 Cherry Ave Signal Hill, CA 90755 City of Laguna Hills 24035 EI Toro Rd puna Hills City of Highland 27215 Base Line Highland, CA 92346 City of Irvine One Civic Center Plaza Irvine, CA 92623 City of Pasadena 100 N. Garfield Ave Pasadena, CA 91109 City of Ontario 303 East B Street Ontario, CA 91764 Anthony Caraveo (562) 989-7352 acaraveon.cit oy fsignalhill.orq, Frank Tran (949) 644-3340 ftran a,newportbeachca.00v John Egan 890-1255 iegan erscinc.com Brian Brown (949) 724-6000 tabrown citvofirvine.orq Tony An (626) 744-7403 Lan@c_itvofr)asadena.net Miguel Sotomayor (909) 395-2108 msotomavor ccDontarioca.aov Agreement No. 5944 Attachment A Project (Amount & Completion Date) T.R.I.P Pavement Rehab. Phase 1 $1,254,012.21 03/17 MacArthur Blvd Pavement Rehabilitation $2„142,045.66 3/17 iRed Hill Park Pedestrian Trail iRenovation Project $171,888.70 3/17 Willow Street Improvement Project $922,100.43 6/17 Arterial Pavement Mngmt. Project Street Rehabilitation $1,375,406.90 6/17 West Highland Bikeways Infrastructure & Pavement Imprv. $2,678,788.77 7/17 Yale Ave Rehabilitation Irvine Center Drive Bid No. 17-1160 $2,453,343.83 7/17 Preventative Maintenance of Street 2016 $945,932.59 8/17 ATP Cycle I Safe Routes to School Sidewalk Imprv. $824,850.88 10/17 City of Inglewood Hunter Nguyen Streets & Alleys Rehabilitation One Manchester Blvd (310) 412-5333 Project Inglewood, CA 90301 hhunter citvofinglewood.or $2„639,330.06 11/17 PUBLIC WORKS REFERENCES 2017/2019 Owner/Agency Contact City of Covina Chris Marcarello 125 E. College (628) 384-5490 Covina, CA 91723 owt.covinaca.aov City of Rancho Palos Verdes Ron Dragoo 30940 Hawthorn Blvd. (310)544-5252 Rancho Palos Verdes, CA 90275 akwolek Wlct c�ov r - City of Downey 11111 Brookshire Ave. Downey, CA 90241 City of Dana point 33282 Golden Lantern Dana Point, Ca 92629 City of Fountain Valley 10200 Slater Ave. Fountain Valley, CA 92708 City of Pomona 505 South Garey Ave. Pomona, CA 91766 City of Lancaster 44933 Fern Ave. Lancaster, CA 93534 City of Tustin 1300 Centennial way Tustin,CA 92780 r ... City of Vernon 4305 S. Santa fe Ave,. Vernon, CA 90058 (City of Diamond Bar 21810 Copley Drive Edwin. Norris (562) 904-7110 enorris downe ca.or Matthew Sinacori (949) 248-3500 msinacori ..danaooint.ora Agreement No. 5944 Attachment A Project (Amount & Completion Date) Grand Ave. Street Rehabilitation Fed Project NO.:STPL-5118(020) $3,030,000.00 5/18 Residential St. Rehab. Project $2,227,000.00 5/18 CIP No. 18-02 Residential St. Pavement Rehab. Project $1,808,000.00 03/19 Arterial Roadway Resurface & Pavement Preservation Project $3,993,000.00 1/18 Fatana Temory Resurface & Rehab. Of Euclid (714)593-4433 Street from Slater Ave. to fatana.Temorvrta""`�fountianvaliev,ora Warner ave. No. TI -271 $1,077,000.00 9/18 Public Works [Major Street Improvements (909)620-2261 pwen ing eeriW( ci.Domona.ca.us $3,839,000.00 8/18 Luis Garibay (661)723-6110 tqgr ibav_Pcitvoflancaster, or Mario Medina (949)394-8955 mmedina@tustinca,ora 2018 Sidewalk, Curb & Gutter Repairs $1,976,000.00 12/18 FY 2017-18 Roadway Rehab. & Sidewalk Repair Project $1,575,125.00 10/18 Daniel Wall Downey Road Improvements (323) 583-8811 x305 PublicWorksBidsa,ci.vernon.ca.us $2,584,000.00 1/17 Jason Williams Residential &Collector Road (909)839-7050 Rehab. Project IDiamond Bar, CA 91765 Agreement No. 5944 PUBLIC WORKS REFERENCES Attachment A 2017/2019 ljwi6Niams( ?diamondbarca.gov $1,551,000.00 12/16 Agreement No. 5944 BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: Hardy & Harper, Inc. Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation. I . Have you ever been disqualified from any government contract? Yes ❑ No X 2. If yes, explain the circumstances: IIID 3. Are you registered in accordance with Labor Code § 1725.5 [Note: failure to register requires the City to reject your bid as nonresponsive]? Yes IN No ❑ /' '.....:: � � . Biddw� Sia nature Michael Murrayice President Name (Please hrxt) I -C-15 Agreement No. 5944 INSURANCE REQUIREMENTS [MUST BE SUBMITTED WITH PROJECT PROPOSAL] FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: Hardy & Harper, Inc. To be awarded this contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: ype of Insurance Limits Commercial general liability: $2,000,000 Business automobile liability: $1,000,000 Workers compensation: Statutory requirement Commercial general liability insurance must meet or exceed the requirements of ISO -CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name the City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance must be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to the City. Insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work perfonned by Contractor for the City. Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. The City requires California Worker's Compensation Coverage with the associated Waiver. Out-of-state coverage will not be accepted in lieu of the California coverage, because the work is being performed in the State of California. By signing this form, the bidder certifies that it has read, understands, and will comply with these insurance requirements if it is selected as the City's consultant. Failure to provide this idi urance, will render the bidder's proposal `nonresponsive." 07/01/2020 .......... Date I -C-16 ................................. Bi�Id`''* Signature Michael Murray - ice President Agreement No. 5944 END PROPOSAL SECTION I -C-17 Agreement No. 5944 CITY OF EL SEGUNDO CONTRACT DOCUMENTS PLANS & SPECIFICATIONS FOR FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 350 MAIN STREET EL SEGUNDO, CA 90245 310-524-2300 https://www.elsegundo. org/government/departments/city-clerk/bid-rfp httDs://www.else�4undo. ori/government/departments/public-works/request-public-works-bid MANDATORY PRE-BID MEETING MONDAY, JUNE 29, 2020 AT 10:00 AM At the northwest corner of the E. Imperial Avenue/California Street Intersection EL SEGUNDO, CA 90245 BIDS DUE TUESDAY, JULY 7, 2020 AT 11:00 AM Agreement No. 5944 BIDS WILL BE RECEIVED UP TO THE HOUR OF 11:00 A.M. TUESDAY, JULY 712020 IN THE OFFICE OF THE CITY CLERK CITY HALL 350 MAIN STREET EL SEGUNDO, CALIFORNIA 90245 AT WHICH TIME THEY WILL BE PUBLICLY OPENED 2 Agreement No. 5944 SPECIAL INSTRUCTIONS TO CONTRACTORS Contractors are required to review section 7-3 of the STANDARD SPECIFICATIONS, pages II -B-25 thru II -B-26 "LIABILITY INSURANCE". ONLY CONTRACTORS ABLE TO OBTAIN AND FURNISH THE REQUIRED COVERAGE AND ENDORSEMENT "ISO" FORMS SHOULD CONSIDER SUBMITTING A BID PACKAGE. The Contractor will be required to apply and obtain an Encroachment Permit from the City Public Works Department as well as any applicable Building/Safety Permit from the City Building Planning and Building Safety Department. The permits will be issued on a "no -fee" basis. The Contractor shall be responsible for calling the Building Safety Division for inspections. All noted deficiencies shall be corrected by the contractor. The project will not be accepted as complete until the contractor obtains a final sign -off from the Department of Planning and Building Safety. Agreement No. 5944 TABLE OF CONTENTS SECTION I — LEGAL A. NOTICE INVITING SEALED BIDS B. BIDDING INSTRUCTIONS 1. DEFINITION 2. BIDDER'S REPRESENTATIONS 3. BIDDING DOCUMENTS 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS 5. PRODUCT SUBSTITUTIONS 6. SUBCONTRACTORS 7. ADDENDA 8. PRE-BID CONFERENCE 9. FORM AND STYLE OF BIDS 10. BID SECURITY 11. MODIFICATION OR WITHDRAWAL OF BID 12. OPENING OF BIDS 13. REJECTION OF BIDS 14. AWARD C. PROPOSAL 1. PROPOSAL, FIRST PAGE 2. BID SCHEDULES a. BASE BID 3. BIDDER'S INFORMATION 4. BIDDER AND NOTARIAL ACKNOWLEDGEMENT 5. PROPOSAL GUARANTEE BID BOND 6. CONTRACTOR'S LICENSE DECLARATION 7. NON -COLLUSION AFFIDAVIT 8. WORKER'S COMPENSATION CERTIFICATION 9. DESIGNATION OF SUBCONTRACTORS 10. REFERENCES 11. BIDDER'S STATEMENT OF PAST DISQUALIFICATIONS 11. INSURANCE REQUIREMENTS D. CITY OF EL SEGUNDO PUBLIC WORKS CONTRACT E. FAITHFUL PERFORMANCE BOND PAGE I -A-1 TO A-3 I -B-1 TO B-8 I -B-1 I -B-1 I -B-2 I -B-2 I -B-3 I -B-3 I -B-3 I -B-3 I -B-4 I -B-5 I -B-6 I -B-6 I -B-6 I -B-6 I -C-1 TO C-17 I -C-1 I -C-3 I -C-3 I -C-4 I -C-6 I -C-7 I -C-8 I -C-9 I -C-10 I -C-11 I -C-34 I -C-15 I -C-16 I -D-1 TO D-5 I -E-1 TO E-3 F. MATERIAL AND LABOR BOND I -F-1 TO F-3 Agreement No. 5944 SECTION II - GENERAL REQUIREMENTS PAGE A. GENERAL SPECIFICATIONS H -A-1 TO A-2 1. REGISTRATION OF CONTRACTORS H -A-1 2. INSURANCE AND CITY BUSINESS LICENSE H -A-1 3. EMERGENCY INFORMATION H -A-1 4. FURNISHING OF WATER H -A-1 5. CALIFORNIA - OCCUPATIONAL SAFETY 1-2 AND HEALTH ADMINISTRATION H -A-1 6. SOUND CONTROL H -A-2 7. AIR POLLUTION CONTROL H -A-2 8. WORKER UNIFORMS H -A-2 B. STANDARD SPECIFICATIONS H -B-1 TO B-34 0-1 STANDARD SPECIFICATIONS H -B-1 0-2 NUMBERING OF SECTIONS H -B-1 0-3 MODIFICATIONS H -B-1 1-2 DEFINITIONS H -B-1 1-2.1 ADDITIONAL DEFINITIONS H -B-1 1-3 ABBREVIATIONS H -B-2 2-0 SCOPE AND CONTROL OF WORK H -B-3 2-1.1 ACCESS TO PROJECT SITE H -B-3 2-1.2 OWNERSHIP AND USE OF CONTRACT H -B-3 DOCUMENTS 2-3 SUBCONTRACTS H -B-3 2-3.1 GENERAL H -B-3 2-3.2 ADDITIONAL RESPONSIBILITY H -B-4 2-4 CONTRACT BONDS H -B-4 2-5 PLANS AND SPECIFICATIONS H -B-5 2-5.1 GENERAL H -B-5 2-5.2 PRECEDENCE OF CONTRACT DOCUMENTS H -B-5 2-5.5 ACCURACY OF PLANS AND SPECIFICATIONS H -B-6 2-8 RIGHT-OF-WAY H -B-6 2-8.1 ADDITIONAL WORK AREAS AND FACILITIES H -B-6 2-9 SURVEYING H -B-6 2-9.3 SURVEY SERVICE H -B-6 2-9.3.1 CONSTRUCTION SURVEYING H -B-6 2-9.3.2 MEASUREMENT AND PAYMENT H -B-7 3-3.2.2 BASIS FOR ESTABLISHING COSTS H -B-7 3-3.2.3 MARK UP H -B-7 11 Agreement No. 5944 SECTION II — GENERAL REQUIREMENTS (Continued) 3-3.3 DAILY REPORTS BY CONTRACTOR 3-4 CHANGED CONDITIONS 3-5 DISPUTED WORK 4-1.3 INSPECTION REQUIREMENTS 4-1.3.1 GENERAL 4-1.3.2 INSPECTION OF MATERIALS NOT PRODUCED LOCALLY 4-1.6 TRADE NAMES OR EQUALS 5-2 PROTECTION 5-2.1 INCORRECT LOCATION OF UTILITIES 5-4 RELOCATION 5-4.1 RESPONSIBILITY OF UTILITY REMOVAL OR RELOCATION 5-5 DELAYS 5-5.1 CALCULATING IDLE TIME 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6-1.1 CONTRACT SCHEDULE 6-1.2 CONTENT OF CONTRACT SCHEDULE 6-1.3 EFFECT OF CONTRACT SCHEDULE 6-1.4 COMMENCEMENT OF CONTRACT TIME 6-4 DEFAULT BY CONTRACTOR 6-4.1 GENERAL 6-4.2 TERMINATION OF CONTRACTOR'S CONTROL OVER THE WORK 6-4.3 SURETY'S ASSUMPTION OF CONTROL 6-6 DELAYS AND EXTENSIONS OF TIME 6-6.1 GENERAL 6-6.2 EXTENSION OF TIME 6-6.3 PAYMENT FOR DELAYS TO CONTRACTOR 6-6.4 WRITTEN NOTICE AND REPORT 6-7.2 WORK DAYS AND WORKING HOURS 6-7.4 NIGHT WORK 6-7.5 WEEKEND AND HOLIDAY WORK 6-8 COMPLETION AND ACCEPTANCE 6-8.1 GENERAL GUARANTY 6-9 LIQUIDATED DAMAGES 6-9.1 FAILURE TO COMPLETE WORK ON TIME 6-11 DISPUTES AND CLAIMS; PROCEDURE 6-11.1 GENERAL 6-11.2 FORM iii PAGE H -B-10 H -B-11 H -B-11 H -B-11 H -B-11 H -B-11 H -B-12 H -B-12 H -B-12 H -B-12 H -B-13 H -B-14 H -B-14 H -B-14 H -B-14 H -B-15 H -B-15 H -B-15 H -B-16 H -B-16 H -B-16 H -B-16 H -B-17 H -B-17 H -B-17 H -B-18 H -B-18 H -B-18 H -B-18 H -B-18 H -B-19 Agreement No. 5944 SECTION II — GENERAL REQUIREMENTS (Continued) 6-11.3 CLAIMS SUBMITTED TO ENGINEER 6-11.4 CLAIMS IS PREREQUISITE TO OTHER REMEDY 6-11.5 DECISION ON CLAIMS 6-11.6 APPEAL OF ENGINEER'S DECISION 6-11.7 MEDIATION 6-11.8 ARBITRATION 6-11.9 WHEN ARBITRATION DECISION BECOMES BINDING 6-11. 1 OAPPEAL TO SUPERIOR COURT; WAIVER OF JURY TRIAL 7-2 LABOR 7-2.3 PREVAILING WAGES 7-2.4 RECORD OF WAGES PAID; INSPECTION 7-3 LIABILITY INSURANCE 7-3.1 GENERAL 7-3.2 INDEMNIFICATION AND DEFENSE 7-5 PERMITS 7-8.1 CLEAN UP AND DUST CONTROL 7-8.1.1 GENERAL 7-8.1.2 WATERING 7-8.6 WATER POLLUTION CONTROL 7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS 7-10 PUBLIC CONVENIENCE AND SAFETY 7-10.1 TRAFFIC AND ACCESS 7-10.2 STREET CLOSURES, DETOURS, BARRICADES 7-10.5 PROTECTION OF THE PUBLIC 7-15 HAZARDOUS MATERIAL 9-2 LUMP SUM WORK 9-3.2 PARTIAL AND FINAL PAYMENTS 9.3.3 DELIVERED MATERIALS 100-1 TERMINATION OF AGENCY LIABILITY 1V PAGE H -B-20 H -B-21 H -B-21 H -B-21 H -B-22 H -B-22 H -B-22 H -B-22 H -B-29 H -B-30 H -B-30 H -B-30 H -B-31 H -B-31 H -B-32 H -B-33 H -B-34 H -B-34 SECTION III — SPECIAL PROVISIONS PAGE III -A-1 THRU V -A-17 Agreement No. 5944 APPENDICES Appendix 1 — City Map Appendix 2 — Typical No Parking Sign — El Segundo Standard ST -18 Appendix 3 — Imperial Avenue Centerline Tie Information Appendix 4 — Pine Avenue Centerline Tie Information Appendix 5 — Project Streets Appendix 6 — Striping Quantities v Agreement No. 5944 NOTICE INVITING SEALED BIDS FOR THE FY 19/20 PAVEMENT REHABILITATION PROJECT IN THE CITY OF EL SEGUNDO PROJECT NO.: PW 20-01 The City of El Segundo is accepting sealed bids in the City Clerk's office, 350 Main Street, El Segundo, California 90245, until 11:00 a.m. on: TUESDAY, JULY 7, 2020 at which time they will be publicly opened. Bids will not be accepted after that time. As described in the Bidding Documents, the bids are for a public works project ("Project") which consists of traffic control, centerline tie surveys, asphalt cold milling, hot mix asphalt paving, manhole adjusting, valve cover adjusting, striping and pavement markings, and related work. The construction shall take place between August 24 and October 16, 2020. Work on the Project must be performed in strict conformity with Specifications No. PW 20-01 as adopted by the El Segundo City Council on June 16, 2020 which is filed with the Public Works Department. Contractors bidding the project shall provide a minimum of five government agency references, preferably municipal, for building similar projects (in terms of scope, size, type, magnitude and complexity), as the prime contractor in the past five (5) years. Bidders shall include references, etc. to demonstrate qualifications. Copies of the Plans, Specifications, Contract Documents and Engineer's estimate are available from the Engineering Division of the Public Works Department, City of El Segundo, 350 Main Street, El Segundo, California, 90245. Plans And Specifications are alternately available electronically via htti)s://www.elseaundo.ora/Government/dei)artments/i)ublic-works/request- public-works-bid A MANDATORY pre-bid meeting is scheduled for Monday, June 29, at 10:00 AM. The meeting will be held at the northwest corner of the E. Imperial Avenue/California Street intersection in El Segundo, CA 90245. Failure to attend the mandatory meeting will disqualify your bid. Appendix 5 shows the project streets. All questions regarding the project are due to httDs://www.else�4undo.ort4/t4ovemment/departments/public-works/request-Dublic- works-bid by Tuesday, June 30, 2020, at 3:00 pm. The terms and conditions for bidding on the Project are described in the attached Bidding Instructions. This project requires payment of State prevailing rates of wages for Los Angeles County. The Agreement No. 5944 contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at www.dir.ca.gov. Note that the Project is subject to compliance monitoring and enforcement by California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code §§ 1725.5 and 1771.4 to be nonresponsive. The contractor to whom the contract is awarded must assist in locating, qualifying, hiring and increasing the skills of minority group employees and applicants for employment, as set forth in Executive Order 11246 and 11375. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. The City of El Segundo hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code ("PCC") § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, any such election will be at Contractor's own expense and will include costs incurred by the City to accommodate the Contractor's request. In entering into a Public Works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor, or Sub -Contractor, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties. Bids must be prepared on the approved Proposal forms in conformance with the Instructions to Bidders and submitted to the City Clerk, 350 Main Street, City of El Segundo, in a sealed I -A-2 Agreement No. 5944 envelope plainly marked on the outside: FY 19/20 PAVEMENT REHABILITATION PROJECT "SEALED BIDS FOR PROJECT NO.: PW 20-01 IN THE CITY OF EL SEGUNDO DO NOT OPEN WITH REGULAR MAIL" The bid must be accompanied by a bid bond, made payable to the City of El Segundo for an amount no less than ten percent (10%) of the amount bid for the base contract. No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the State Business and Professions Code. For these projects, those acceptable classes of license shall be "A" and "C-12". The successful Contractor and his Sub - Contractors will be required to possess the correct license for their project classifications, and valid City Business Licenses from the City of El Segundo. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. Any contract entered into pursuant to this notice shall become effective or enforceable against the City of El Segundo only when the formal written contract has been duly executed by the appropriate officer(s) of the City of El Segundo. DATED this day of 12020. CITY OF EL SEGUNDO, CALIFORNIA Tracy Weaver, City Clerk I -A-3 Agreement No. 5944 BIDDING INSTRUCTIONS 1. DEFINITIONS. Unless provided otherwise, the definitions in the Greenbook, Special Conditions, or other Contract Documents are applicable to all Bidding Documents. 1.1 "Addenda" means written or graphic instruments issued by the City before the Bid Deadline that modify or interpret the Bidding Documents by additions, deletions, clarifications, or corrections. 1.2 "Alternate" means a proposed change in the Work, as described in the Bidding Documents which, if accepted, may result in a change to either the Contract Sum or the Contract Time, or both. 1.3 "Bid Deadline" means the date and time designated in the Notice for Bids as the last date and time for receipt of Bids, as may be revised by Addenda. 1.4 "Bidder" means a person or firm that submits a Bid. 1.5 "Bidding Documents" means the construction documents prepared and issued for bidding purposes including all Addenda. 1.6 "Lump Sum Base Bid" means the sum stated in the Bid for which Bidder offers to perform the Work described in the Bidding Documents, but not including unit price items or Alternates. 1.7 "Unit Price" means an amount stated in the Bid for which Bidder offers to perform the Unit Price Work for a fixed price per unit of measurement. 2. BIDDER'S REPRESENTATIONS. By making its Bid, Bidder represents that: 2.1 Bidder read, understood, and made the Bid pursuant to the requirements in the Bidding Documents. 2.2 Bidder visited the Project site and is familiar with the conditions under which the Work will be performed and the local conditions as related to the Contract Documents. 2.3 The Bid is based upon the materials, equipment, and systems required by the Bidding Documents. 2.4 Bidder and all Subcontractors, regardless of tier, have the appropriate current licenses issued by the State of California Contractor's State License Board for the Work to be performed. If Bidder is a joint venture, the Bidder will have a joint venture license appropriate for the performance of the work, and each member of the joint venture will likewise have the appropriate license. Business and Professions Code § § 7000- 7191 establish licensing requirements for contractors. If a Bidder, that is a specialty contractor, submits a Bid involving 3 or more specialized building trades, the work of which is more than incidental and supplemental to the performance of the Work for which Bidder holds a specialty contractor license, Bidder must also hold either (1) a specialty contractor "C" license in each such trade, (2) a General Engineering contractor "A" license, or (3) a General Building contractor `B" license. This requirement is applicable whether or not Bidder lists a Subcontractor for each such trade. 2.5 If licensure or proper licensure is controverted, then proof of licensure pursuant to Agreement No. 5944 this section must be made by production of a verified certificate of licensure from the Contractors' State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of contractors at all times during the performance of any act or contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2.6 Bidder has the expertise and financial capacity to perform and complete all obligations under the Bidding Documents. 2.7 The person executing the Bid Form is duly authorized and empowered to execute the Bid Form on Bidder's behalf. 2.8 Bidder is aware of and, if awarded the Contract, will comply with Applicable Code Requirements in its performance of the Work. 2.9 The Bidder has paid the City's business license fee(s) 2.10 The Bidder, per SB 854 requirements for public projects, has registered with and paid their annual fee to the California State Department of Industrial Relations. Information about SB 854 and its requirements can be found at this link: http://www.dir.ca.gov/Public-Works/SB854.html 3. BIDDING DOCUMENTS 3.1 Bidders may obtain complete sets of the Bidding Documents from the City's Public Works Department for the sum stated in the Notice for Bids. 3.2 Bidders will use a complete set of Bidding Documents in preparing Bids. 3.3 The City makes copies of the Bidding Documents available, on the above terms, for the sole purpose of obtaining Bids for the Work and does not confer a license or grant permission for any other use of the Bidding Documents. 4. INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS. 4.1 Before submitting its Bid, Bidder will carefully study and compare the various documents comprising the Bidding Documents and compare them with any other work being bid concurrently or presently under construction which relates to the Work for which the Bid is submitted; will examine the Project site, the conditions under which the Work is to be performed, and the local conditions; and will at once report to the City's Representative errors, inconsistencies, or ambiguities discovered. 4.2 Requests for clarification or interpretation of the Bidding Documents will be addressed to the City's Representative. 4.2.1 The release of the bid package begins a quiet period for potential Bidders participating in this project. The City of El Segundo realizes it is critical to provide Bidders with a vehicle to ask questions so that quality responses can be prepared. Questions must be submitted in writing to project managers via the City website: htti)s://www.else"ndo. ora/Government/dei)artments/i)ublic-works/request- vublic-works-bid I -B-2 Agreement No. 5944 Responses to all questions will be provided in writing to all Bidders in accordance with the schedule below. We will not identify companies or individuals that pose questions. Potential bidders must not call City of El Segundo employees to discuss potential projects or ask questions regarding the bid. Questions Due by 3:00 pm, Tuesday, June 30, 2020 Questions Answered by July 6, 2020 4.3 Clarifications, interpretations, corrections, and changes to the Bidding Documents will be made by Addenda. Clarifications, interpretations, corrections, and changes to the Bidding Documents made in any other manner will not be binding and Bidders must not rely upon them. 5. PRODUCT SUBSTITUTIONS. No substitutions will be considered before award of Contract. Substitutions will only be considered after award of the Contract and as provided for in the Contract Documents. 6. SUBCONTRACTORS. 6.1 Each Bidder will list in the Bid Form all first-tier Subcontractors that will perform work, labor or render such services. The Bid Form contains spaces for the following information when listing Subcontractors: (1) Work Activity; (2) name of Subcontractor; (3) city of Subcontractor's business location. Failure to list any of these items on the Bid Form will result in the City treating the Bid as if no Subcontractor was listed for the Work and that Bidder represents to the City that it is fully qualified to perform that portion of the Work and will perform do so. 6.2 Subcontractors listed in the Bid Form will only be substituted after the Bid Deadline with the City's written consent in accordance with California law. 7. ADDENDA. 7.1 Addenda will be in writing and issued only by the City. Addenda will be mailed or delivered to all who are known by the City to have received a complete set of Bidding Documents and who have provided a street address for receipt of Addenda. 7.2 Copies of Addenda will be made available for inspection at the City's Public Works Department. 7.3 The City will issue Addenda so that they are received by prospective Bidders not later than three (3) business days before the Bid Deadline. Addenda that withdraw the request for Bids or postpone the Bid Deadline may be issued anytime before the Bid Deadline. 7.4 Each Bidder is responsible for ensuring that it has received all issued Addenda before issuing a Bid. 8. PRE-BID CONFERENCE. Bidder will attend a Pre -Bid Conference where City will discuss the Bidding Documents, answer questions, accept comments, and conduct a Project site visit. The City requires all Pre -Bid Conference attendees to arrive for the meeting on time and to I -B-3 Agreement No. 5944 sign an attendance list which is used to determine if Bidders meet this requirement. Any Bidder not attending the Pre -Bid Conference in its entirety will be deemed to have not complied with the requirements of the Bidding Documents and its Bid will be rejected. 9. FORM AND STYLE OF BIDS 9.1 Bids will be submitted on the Bid Form included with the Bidding Documents. Bids not submitted on the City's Bid Form will be rejected. 9.2 All blanks on the Bid Form will be filled in legibly in ink or by typewriter. 9.3 Bidder's failure to submit a price for any Alternate or unit price will result in the Bid being considered as nonresponsive. If Alternates are called for and no change in the Lump Sum Base Bid is required, enter "No Change." 9.4 Each Bidder must fill out the "Bidders Statement of Past Contract Disqualifications" form stating any and all instances of contract disqualifications due to a violation of a law or safety regulation. The Bidder must explain the circumstances of each disqualification. The City may reject the bid based on such information. 9.5 Bidder will make no stipulations on the Bid Form nor qualify the Bid in any manner. 9.6 The Bids will be based upon full completion of all the Work as shown on the plans and specifications. It is expressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the Bidder (if awarded the Contract) specifically agrees to construct a completed work ready for the use and in the manner which is intended. In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished must be paid for according to the unit or lump sum price established for such work under the contract, wherever such unit or lump sum price has been established. In the event no prices are named in the contract to cover such changes or alterations, the cost of such changes must be covered as extra work. 9.7 The Bid Form will be signed by a person or persons legally authorized to bind Bidder to a contract. Bidder's Representative will sign and date the Declaration included in the Bid Form. Failure to sign and date the declaration will cause the Bid to be rejected. 9.8 Bids must be submitted in writing on the Proposal forms provided by the City of El Segundo. One (1) set of these Proposal forms is inserted loose herein for use by the bidders. Bidders are required to submit one (1) original set of the proposal forms. All information requested therein must be clearly and legibly set forth in the manner and form indicated. 9.9 Bidders must satisfy themselves by personal examination of the work site, Plans, Specifications, and other contract documents, and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the work must be performed. No bidder shall at any time after submissions of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies found in the Plans, Specifications, or other contract documents shall be called to the attention of the City of El Segundo and clarified prior to the submission ul Agreement No. 5944 of proposals. 10. BID SECURITY 10.1 Each Bid will be accompanied by Bid Security, in the amount of 10% of the Lump Sum Base Bid as security for Bidder's obligation to enter into a Contract with the City on the terms stated in the Bid Form and to furnish all items required by the Bidding Documents. Bid Security will be a Bid Bond on the form provided by the City or a certified check made payable to "City of El Segundo." When a Bond is used for Bid Security, failure to use the City's Bid Bond form will result in the rejection of the Bid. 10.2 If the apparent lowest responsible Bidder fails to sign the Agreement and furnish all items required by the Bidding Documents within the time limits specified in these Instructions to Bidders, the City will disqualify such Bidder and select the next apparent lowest responsible Bidder until all bids have been exhausted or the City may reject all bids. In such an event, the disqualified Bidder will be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the Bid Security, between the amount of the disqualified Bid and the larger amount for which the City procures the Work. 10.3 If a Bid Bond is submitted and an attorney-in-fact executes the Bid Bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the Bid Bond. The surety issuing the Bid Bond will be listed in the latest published State of California, Department of Insurance list of, "Insurers Admitted to Transact Surety Insurance in This State." 10.4 The City will retain Bid Security until the occurrence of one of the following: 10.4.1 All items required by the Bidding Documents have been furnished and the Agreement has been signed by the successful Bidder and the City. 10.4.2 The specified time has elapsed during which Bids may be withdrawn. 10.4.3 All Bids have been rejected. 10.5 The Bid Form, Bid Security, and all other documents required to be submitted with the Bid must be enclosed in a sealed opaque envelope. The envelope must be addressed to the City Clerk. The envelope must be identified with the Bidder's name and address, and identify the Project for which the Bid is submitted, as follows: "SEALED BIDS FOR PW 20-01: FY 19/20 PAVEMENT REHABILITATION PROJECT. DO NOT OPEN WITH REGULAR MAIL." Proposals may be mailed or delivered by messenger. 10.6 Bids will be deposited at the designated location on or before the Bid Deadline. A Bid received after the Bid Deadline will be returned to Bidder unopened. 10.7 Bidder will assume full responsibility for timely delivery at the location designated for receipt of Bids. 10.8 Oral, telephonic, facsimile, or telegraphic Bids are invalid and will not be accepted. 10.9 All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws related to bids for contracts of this nature whether the same is expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and I -B-5 Agreement No. 5944 requirements set forth, contemplated, and referred to in the Plans, Specifications, and other contract documents, and to full compliance therewith. 11. MODIFICATION OR WITHDRAWAL OF BID. 11.11 Before the Bid Deadline, a submitted Bid may be modified or withdrawn. Notice of such action will be given to the City in writing and signed by the Bidder's authorized representative. A change so made will be so worded as not to reveal the amount of the original Bid. 11.12 A withdrawn Bid may be resubmitted up to the Bid Deadline, provided that it then fully complies with the Bidding Requirements. 11.13 Bid Security will be in an amount sufficient for the Bid as modified or resubmitted. 11.14 Bids may not be modified, withdrawn, or canceled within sixty (60) days after the Bid Deadline unless otherwise provided in Supplementary Instructions to Bidders. 11.15 Proposals may not be withdrawn after said Bid Deadline without forfeiture of the proposal guarantee. 11.16 The withdrawal of a proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so. 11.17 No mention shall be made in the proposal of Sales Tax, Use Tax, City Business License, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable. 11.18 No mention shall be made in the proposal of the cost of bonds as all amounts bid will be deemed and held to include any such costs, which may be applicable. 12. OPENING OF BIDS. Bids submitted in the manner required by these instructions and are received on or before the Bid Deadline will be opened publicly. 13. REJECTION OF BIDS. 13.1 The City will have the right to reject all Bids. 13.2 The City will have the right to reject any Bid not accompanied by the required Bid Security or any other item required by the Bidding Documents, or a Bid which is in any other way materially incomplete or irregular. 13.2.1 Unrequested/unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic, or telephonic proposal, modification, or withdrawal will be considered. 13.3 In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime contractor. No proposal will be accepted from a bidder who has I -B-6 Agreement No. 5944 not been licensed in accordance with the provisions of the State Business and Professions Code. 14. AWARD 14.1 The City may retain all bids for a period of sixty (90) days for examination and comparison, and to delete any portion of the work from the contract. 14.2 The City will have the right to waive nonmaterial irregularities in a Bid and to accept the lowest responsive Bid as determined by The City. 14.3 The City will have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents. 14.4 The City will determine the low Bidder on the basis of the sum of the Lump Sum Base Bid plus all unit prices multiplied by their respective estimated quantities as stated in the Bid Form, if any, plus the Contractor Delay Damages multiplied by the "multiplier" as stated in the Bid Form, plus the amounts of all accepted Alternates. 14.4.1 Inclusion of Contractor Delay Damages within the Bid Form is solely for the purpose of determining the low bidder and establishing the City's maximum daily liability as a result of City delays to Contractor, if any, and City has no obligation to pay any daily Contractor Delay Damages except as provided for in these Contract Documents for Compensable Delays. In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Proposal Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 14.5 The City will select the apparent lowest responsive and responsible Bidder and notify such Bidder within thirty (30) days (unless number of days is modified in Supplementary Instructions to Bidders) after the Bid Deadline or reject all bids. Within ten (10) days after receiving the City's notice that Bidder was selected as the apparent lowest responsible Bidder, Bidder will submit to the City all of the following items: 14.5.1 One original of the Agreement signed by Bidder. 14.5.2 One original of the Payment Bond. 14.5.3 One original of the Performance Bond. 14.5.4 Certificates of Insurance on form provided by the City. 14.5.5 Names of all Subcontractors, with their addresses, telephone number, facsimile number, trade on Bidders' company stationery. Evidence, as required by the City, of the reliability and responsibility of the proposed Subcontractors such as statements of experience, statements of financial condition, and references. 14.5.6 Preliminary Contract Schedule. 14.5.7 Selection of Retention Options and Escrow Agreement for Deposit of Securities in Lieu of Retention and Deposit of Retention. If not submitted, the City will withhold retention. 14.5.8 Cost Breakdown. 14.6 Before award of the Contract, the City will notify Bidder in writing, if the City objects to a Subcontractor proposed by Bidder, in which case Bidder will propose a I -B-7 14.7 Agreement No. 5944 substitute acceptable to the City. Failure of the City to object to a proposed Subcontractor before award will not preclude the City from requiring replacement of any Subcontractor based upon information received subsequent to award, information which cannot be properly evaluated before award due to time constraints, or information relating to a failure to comply with the requirements of the Contract. If Bidder submits the original signed Agreements and all other items within ten (10) days after receiving the City's notification, and all such items comply with the requirements of the Bidding Documents, the City will award the Contract to Bidder by signing the Agreement and returning a signed copy of the Agreement to Bidder. If the City consents to the withdrawal of the Bid of the apparent lowest responsible Bidder, or the apparent lowest responsible Bidder fails or refuses to sign the Agreement or submit to the City all of the items required by the Bidding Documents, within ten (10) days after receiving the City's notification, or the City determines that the Bidder is not financially or otherwise qualified to perform the Contract, the City may reject such Bidder's Bid and select the next apparent lowest responsible Bidder, until all bids are exhausted, or reject all Bids. :: Agreement No. 5944 PROPOSAL FOR THE FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Date 20 Company Name: TO THE CITY OF EL SEGUNDO: In accordance with the City of El Segundo's Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and contract documents therefor, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and all other contract documents. Submittal of this bid shall be considered evidence that the BIDDER has satisfied himself regarding the contract documents, access and any other field conditions which may effect bid prices. If this proposal is accepted for award, BIDDER agrees to enter into a contract with the City of El Segundo at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to the City of El Segundo of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY OF EL SEGUNDO RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all apparent expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the City of El Segundo's notice of award of contract to the BIDDER, including sending by U.S. Mail a Public Works Contract for signature by the Awardee, the proceeds of the security accompanying this bid shall become the property of the City of El Segundo and this bid and the acceptance hereof may, at the City of El Segundo's option, be considered null and void. Agreement No. 5944 EOUAL EMPLOYMENT OPPORTUNITY COMPLIANCE BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFFIRMATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION AFFIDAVIT BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the City of El Segundo is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud. I -C-2 Agreement No. 5944 BID SCHEDULE FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: BASE BID ITEMS Item Unit Price Total No. Description Qty Unit M M Mob ilization/Demobilization including traffic 1 control (not to exceed 5% maximum of Total 1 LS Base Bid) 2 Cold mill 2" existing asphalt concrete pavement 144,380 SF 3 Overlay 2" C2 PG 64-10 hot mix asphalt 144,380 SF 4 Adjust sewer and storm drain manhole covers 12 EA to final grade 5 Adjust water valve covers to final grade 29 EA Remove and replace all traffic striping, 6 pavement markings, and pavement markers. 1 LS Thermoplastic to be used for all striping and markings. See Appendix 6. ALTERNATIVE BID ITEM (Determined by the City on an as -needed basis) 7 1 6 -inch deep asphalt repairs 1 1,000 1 SF ALTERNATIVE BID ITEM (Determined by the City on an as -needed basis) Grind and overlay of California Street between Imperial Highway and Cul-de-sac (including California St./Im)erial Ave. intersection) 8 Cold mill 2" existing asphalt concrete pavement 34,986 SF 9 Overlay 2" C2 PG 64-10 hot mix asphalt 34,986 SF 10 Adjust sewer and storm drain manhole covers 2 EA to final grade 11 Adjust water valve covers to final grade 2 EA Remove and replace all traffic striping, 12 pavement markings, and pavement markers. 1 LS Thermoplastic to be used for all striping and markings. See Appendix 6. TOTAL BID = $ TOTAL BID WRITTEN IN WORDS: All work listed on the bid schedule shall be per these specifications and attachments. Prevailing wage rates apply. The City of El Segundo reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of ninety (90) calendar days. I -C-3 Agreement No. 5944 BIDDER'S INFORMATION Company Name: BIDDER certifies that the following information is true and correct: Form of Legal Entity (i.e., individual, partnership, corporation, etc. If corporation, State of Incorporation (i.e., California) Business Address Telephone No. Facsimile No. State Contractor's License No. and Class DIR4 State License Original Date Issued Expiration Date The following are the names, titles, email addresses, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having principal interest in this proposal: The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows: All current and prior DBA's, aliases, and/or fictitious business names for any principal having an interest in this proposal are as follows: I -C-4 Agreement No. 5944 BIDDER'S INFORMATION (CONTINUED) Company Name: Bidder shall list the name of the person who attended the mandatory pre-bid job walk: Name: Title: I -C-5 Agreement No. 5944 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all a forenamed principals this day of 20 BIDDER Subscribed and sworn to this day of 20 NOTARY PUBLIC I -C-6 Agreement No. 5944 PROPOSAL GUARANTEE BID BOND FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 KNOW ALL MEN BY THESE PRESENTS that, , as BIDDER, and , as SURETY, are held and firmly bound unto the City of El Segundo, in the penal sum of DOLLARS ($_), which is ten (10%) percent of the total amount bid by BIDDER to the City of El Segundo for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to the City of El Segundo for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of the City of El Segundo. IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals this day of 20 BIDDER* SURETY* Subscribed and sworn to this day of 20 NOTARY PUBLIC Provide BIDDER/SURETY name, title, address and telephone number and the name, title, address and telephone number for authorized representative. I -C-7 Agreement No. 5944 CONTRACTOR'S LICENSE DECLARATION (Business and Professions Code Section 7028.15) 1. BIDDER'S Contractor's License Number is: Class No.: 2. The expiration date of BIDDER'S Contractor License is: 20 3. BIDDER acknowledges that Section 7028.15(e) of the Business and Professions Code provides as follows: "A licensed contractor shall not submit a bid to a public agency unless his or her contractor's license number appears clearly on the bid, the license expiration date is stated, and the bid contains a statement that representations herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non-responsive and shall be rejected by the public agency." The undersigned declares, under penalty of perjury, that the representations made by the undersigned in this bid proposal are true and correct. Executed on , 20, at Signature Typed Name Title Company Name (insert City and State where Declaration signed). I -C-8 Agreement No. 5944 NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ) ss. County of ) , being first duly sworn, deposes and say that he or she is of the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Signature Typed Name Title I -C-9 Name of Bidder/Company Name Date Agreement No. 5944 WORKER'S COMPENSATION CERTIFICATION Section 1861 OF THE LABOR CODE (Workers' Compensation) Pursuant to Section 1861 of the Labor Code, the BIDDER, in submitting his/her PROPOSAL, shall sign the following certification: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." Signature of Bidder: Title: Business Name: Business Address: Telephone Number: Dated this day of 20 I -C-10 Agreement No. 5944 DESIGNATION OF SUBCONTRACTORS FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: As detailed in Section 2-3.1 (Page II -B-3) of the City Standard Specifications, Bidder certifies that it has listed below all subcontractors who will perform work in excess of one-half of one percent (0.5%) of the total bid price or certifies that the bidder is fully qualified to perform and will perform that portion of the work itself. Name of Subcontractor Address (Number and Street) (City, Zip Code) Subcontractor's Contractor License No., & DIR Registration No. (CSLB 4) (DIR 4) Description of Portion of Work Subcontracted (Make copies of this page if additional space is needed) Signature of Bidder Date I -C-11 Estimated $ Amount REFERENCES Company Name Agreement No. 5944 The following are the names, addresses, and telephone numbers for public agencies for which BIDDER has performed similar work as the prime contractor or major subcontractor within the past five (5) years: 1. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? 2. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? I -C-12 Agreement No. 5944 Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? 4. Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? I -C-13 Agreement No. 5944 Project Title: Location: Name and address of owner Name and current telephone number of person familiar with project: Type of Work: Contract amount: $ Date completed: Amount of work done by my/our firm under contract $ Did your firm have any financial interest in Project? Bidder pray attach additional reference pages if necessary. The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance bonds: I -C-14 Agreement No. 5944 BIDDER'S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation. 1. Have you ever been disqualified from any government contract? Yes ❑ No ❑ 2. If yes, explain the circumstances: 3. Are you registered in accordance with Labor Code § 1725.5 [Note: failure to register requires the City to reject your bid as nonresponsive]? Yes ❑ No ❑ Bidder's Signature Name (Please Print) I -C-15 Agreement No. 5944 INSURANCE REQUIREMENTS [MUST BE SUBMITTED WITH PROJECT PROPOSAL] FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Company Name: To be awarded this contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Limits Commercial general liability: $2,000,000 Business automobile liability: $1,000,000 Workers compensation: Statutory requirement Commercial general liability insurance must meet or exceed the requirements of ISO -CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name the City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance must be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to the City. Insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by Contractor for the City. Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "AML" Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. The City requires California Worker's Compensation Coverage with the associated Waiver. Out-of-state coverage will not be accepted in lieu of the California coverage, because the work is being performed in the State of California. By signing this form, the bidder certifies that it has read, understands, and will comply with these insurance requirements if it is selected as the City's consultant. Failure to provide this insurance will render the bidder's proposal "nonresponsive." Date I -C-16 Bidder's Signature Agreement No. 5944 END PROPOSAL SECTION I -C-17 Agreement No. 5944 PUBLIC WORKS CONTRACT BETWEEN THE CITY OF EL SEGUNDO AND [CONTRACTOR] FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 This CONTRACT is entered into this day of 120 by and between the CITY OF EL SEGUNDO, a general law city and municipal corporation ("the City") and 1. WORK. , ("the Contractor") A. The Contractor will provide all work required by the Contract Documents (the "Work"). The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents. B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents; C. The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents. D. "Contract Documents" means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings. 2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed Dollars ($ ) for the Work in the manner set forth in the Contract Documents. The City may adjust this amount as set forth in the Contract Documents. Agreement No. 5944 3. TIME FOR PERFORMANCE. A. The Contractor will fully complete the Work within twenty-five (25) working days (the "Contract Time.") B. The Contract Time will commence when the City issues a Notice to Proceed. The Contract Documents will supersede any conflicting provisions included on the notice to proceed issued pursuant to this Contract. C. The Contractor may not perform any Work until: The Contractor furnishes proof of insurance as required by the Contract Documents; and ii. The City gives the Contractor a written, signed, and numbered purchase order and notice to proceed. D. By signing this Contract, the Contractor represents to the City that the Contract Time is reasonable for completion of the Work and that the Contractor will complete the Work within the Contract Time. E. Should the Contractor begin the Work before receiving written authorization to proceed, any such Work is at the Contractor's own cost and risk. 4. DISPUTES. Disputes arising from this contract will be determined in accordance with the Contract Documents and Public Contracts Code §§ 10240-10240.13. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third -party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the "Notice" section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third -party claim. 6. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number. 7. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and certificates that may be required in connection with the Work. 8. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the I -D-2 Agreement No. 5944 City's property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City's written notice. 9. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification. 10. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor will act as an independent contractor and will have control of all work and the manner in which is it performed. The Contractor will be free to contract for similar service to be performed for other employers while under contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doing the work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only. 11. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents. 12. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows: The Citv Lifan Xu City Engineer City of El Segundo 350 Main Street, El Segundo, CA 90245 (310) 524-2368 The Contractor Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the I -D-3 Agreement No. 5944 time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 13. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor's or the City's obligations under this Contract. 14. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County. 15. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows: A. This Contract; B. The Standard Specifications; and C. Precedence of documents as determined in the Standard Specifications. 16. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect. 17. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract maybe modified by written amendment. The City's city manager, or designee, may execute any such amendment on the City's behalf. 18. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 19. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph. 20. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract. I -D-4 Agreement No. 5944 21. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents. IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF EL SEGUNDO Scott Mitnick City Manager ATTEST: Tracy Weaver, City Clerk APPROVED AS TO FORM: MARK D. HENSLEY, City Attorney LIZA David H. King, Assistant City Attorney Insurance Reviewed by: I -D-5 Taxpayer ID No. Contractor State License No.: Contractor City Business License No.: Agreement No. 5944 FAITHFUL PERFORMANCE BOND FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Bond No. Bond Fee: and ("PRINCIPAL") a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of DOLLARS, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, FY 19/20 PAVEMENT REHABILITATION PROJECT, SPECIFICATIONS NO. PW 20-01, and the public works contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 20-01, a copy of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. CITY has estimated the required amount of the bond as shown above. 2. PRINCIPAL's work on the Public Project will be done in accordance with CITY's plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor. 3. PRINCIPAL will guarantee its work against any defective work, labor, or Agreement No. 5944 materials on the Public Project for a period of one (1) year following the Public Project's completion and acceptance by CITY. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 20-01 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -E-2 SIGNED AND SEALED this day of PRINCIPAL's PRESIDENT PRINCIPAL's SECRETARY Agreement No. 5944 ,20 SURETY'S PRESIDENT SURETY'S SECRETARY PRINCIPAL's MAILING ADDRESS: SURETY's MAILING ADDRESS: NOTE: (1) ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. (2) Bond shall be effective for one (1) year after acceptance of the job. I -E-3 Agreement No. 5944 LABOR AND MATERIALS BOND FY 19/20 PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 Bond No. Bond Fee: , as principal ("PRINCIPAL") and , a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety ("SURETY"), are held and firmly bound unto the CITY OF EL SEGUNDO ("CITY") in the sum of DOLLARS, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument. This bond is conditioned upon and guarantees payment by PRINCIPAL to contractors, subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL'S subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in FY 19/20 PAVEMENT REHABILITATION PROJECT, SPECIFICATIONS NO. PW 20-01 ("Public Project"), the public works contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default. BOND CONDITIONS 1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. PW 20-01, and the public works contract executed for such Specifications, copies of which is on file with CITY's Engineering Division ("Public Project"). Such performance will be in accordance with CITY's plans and profiles (CITY DRAWING FILE NO. ), which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY's Engineering Division. 2. PRINCIPAL will pay all contractors, subcontractors, and persons renting equipment. 3. PRINCIPAL will pay for all materials and other supplies, for equipment used in, on, for or about the performance of the Public Project, and will pay for all work and labor Agreement No. 5944 thereon. 4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the El Segundo Municipal Code ("ESMC"). 5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. PW 20-01, or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed. 6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference: A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY's representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY's certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted. 7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL's obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect. [SIGNATURES ON FOLLOWING PAGE] I -F-2 SIGNED AND SEALED this day of PRINCIPAL's PRESIDENT PRINCIPAL's SECRETARY PRINCIPAL's MAILING ADDRESS: NOTE: (1) (2) Agreement No. 5944 Rol SURETY'S PRESIDENT SURETY'S SECRETARY SURETY's MAILING ADDRESS: ALL signatures must be acknowledged by a notary public. Return one (1) original to City Clerk's Office. Bond shall be effective for one (1) year after acceptance of the job. I -F-3 Agreement No. 5944 SECTION II - GENERAL REOUIREMENTS CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT GENERAL SPECIFICATIONS 1. REGISTRATION OF CONTRACTORS No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the laws of the State of California relating to licensing of contractors, for the type of work to be performed under this Contract. 2. INSURANCE AND CITY BUSINESS LICENSE Contractor and Sub -Contractors will obtain appropriate insurance and a City Business License before execution of the construction contract. 3. EMERGENCY INFORMATION The names, addresses and telephone numbers of the CONTRACTOR and subcontractors, or their representatives, will be filed with the City Engineer and the City Police Department BEFORE PERFORMING WORK. 4. FURNISHING OF WATER Water necessary for the prosecution of the work as herein specified will be furnished by the City in the following manner: The CONTRACTOR will deposit with the City Water/Wastewater Division the sum of One Thousand Four Hundred Forty -Four Dollars ($1,444.00) to insure against damage to a 21/z" Fire Hydrant water meter which will be furnished and installed by the City at a point convenient to the site of the work. This deposit will be refunded to the CONTRACTOR upon completion of the Project if, after removal and inspection of said meter by the City, it is found to be in satisfactory condition. In event of damage to this meter while under the jurisdiction of the CONTRACTOR, all or any part of said deposit may be retained by the City. An non-refundable Activation Fee of One Hundred Ten Dollars ($110.00) will be charged upon activation of the temporary meter. CALIFORNIA - OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION All work performed under this contract will be done in strict compliance with the Cal -OSHA Rules and Regulations, latest edition. II -A-1 Agreement No. 5944 6. SOUND CONTROL The Contractor will comply with all local sound control and noise level rules, regulations and ordinances that apply to any work performed pursuant to the contract. Each internal combustion engine, used for any purpose on the Project or related to the Project, will be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine will be operated on the Project without said muffler. The use of loud signals will be avoided in favor of light warnings except those required by safety laws for the protection of personnel. 7. AIR POLLUTION CONTROL The Contractor is put on notice that he must abide by all existing rules and regulations of the SCAQMD (South Coast Air Quality Management District), relating to all operations or equipment which discharge visible emissions or solid or liquid particles to the atmosphere. 8. WORKER UNIFORMS All workers under the employment of the Contractor or his/her Sub -Contractor will wear an orange vest or an orange shirt while working in the public right-of-way. II -A-2 Agreement No. 5944 CITY OF EL SEGUNDO PUBLIC WORKS DEPARTMENT GENERAL PROVISIONS 0-0 STANDARD SPECIFICATIONS 0-1 GENERAL Except as modified by these Standard Specifications, the provisions of the latest edition of the "Standard Specifications for Public Works Construction" and its supplements prepared and promulgated by the Southern California Chapters of the American Public Works Association and the Associated General Contractors of America, constitute the Standard Specifications for this project. 0-2 NUMBERING OF SECTIONS The numbering contained within the Standard Specifications of the Contract Documents is intended to correspond with Greenbook numbering. 0-3 MODIFICATIONS To the extent that the provisions of the Contract Documents conflict with the Greenbook, the Contract Documents take precedence. 1-2 DEFINITIONS The following subsection is added to Subsection 1-2 of the Greenbook. 1-2.1 ADDITIONAL DEFINITIONS Acceptance — The date on which the City Council accepts the Work as complete. Architect, Design Engineers, Soils Engineer, Structural Engineers - Advisors employed by the City. Bidder - Any individual, firm, partnership, corporation, or combination thereof, submitting a proposal for the work contemplated, acting directly or through a duly authorized representative. City Council - The body constituting the awarding authority of the City. Compensable Delay -- a delay entitling the Contractor to an adjustment of the Contract Sum and an adjustment of the Contract Time in accordance with this Agreement. II -B-1 Agreement No. 5944 Due Notice - A written notification, given in due time, of a proposed action where such notification is required by the contract to be given a specified interval of time (usually 48 hours or two working days) before the commencement of the contemplated action. Notification may be from Engineer to Contractor or from Contractor to Engineer. Engineer - The City Engineer, or designee, as defined in the Greenbook. Unless otherwise provided, all correspondence and decisions made relative to the contract will be by the City Engineer or his designated representative. Greenbook — The most recent edition of the Standard Specifications for Public Works Construction. PCC — California Public Contract Code. Prompt - The briefest interval of time required for a considered reply, including time required for approval of a governing body. Public Works Director — The City's Public Works Director, or designee. ❑ (Check if applicable) State Standard Specifications - State of California Standard Specifications, dated July 1992, Business and Transportation Agency, Department of Transportation Working Days - A working day is defined as any day, except Saturdays, Sundays, legal holidays and days when work is suspended by the Engineer, as provided in Subsection 6-3 and days determined to be non -working in accordance with Subsection 6-7, "Time of Completion." 1-3 ABBREVIATIONS The following Subsection is added to Subsection 1-3 of the Greenbook. 1-3.1 The following abbreviations are added to Subsection 1-3 of the Greenbook: AAN American Association of Nurserymen AGC Associated General Contractors of America AISC American Institute of Steel Construction APWA American Public Works Association ASME American Society of Mechanical Engineers IEEE Institute of Electric and Electronic Engineers NEC National Electric Code Green Book The most current edition of the Standard Specification for Public Works Construction, and subsequent supplements prepared by Southern California Chapters of AGC and APWA II -B-2 Agreement No. 5944 WATCH Work Area Traffic Control Handbook SPPWC Standard Plans for Public Works Construction by the American Public Works Association current edition and subsequent supplements ASA American Standard Association CITY City of El Segundo SSP State of California Standard Plans, current edition SSS State of California Standard Specifications, current edition SECTION 2 — SCOPE AND CONTROL OF WORK The following subsections 2-1.1 and 2-1.2 are added to the Greenbook. 2-1.1 ACCESS TO PROJECT SITE Not later than the date designated in the current Contract Schedule submitted by the Contractor, the City will provide access to the real property and facilities upon which the Work is to be performed, including access to real property and facilities designated in the Contract Documents for the Contractor's use. 2-1.2 OWNERSHIP AND USE OF CONTRACT DOCUMENTS. The Contract Documents and all copies furnished to or provided by the Contractor are the City's property and may not be used on other work. 2-3 SUBCONTRACTS Subsection 2-3 Subcontractors of Greenbook is deleted in its entirety and replaced with the following subsection. 2-3.1 GENERAL Except as provided in PCC §§ 4100 et. seq., each bidder will file with its bid the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the prime contractor's total bid. Only one subcontractor will be listed for each portion of the work, which portion will be defined in the bid. In each instance, the nature and extent of the work to be sublet will be described. The failure of the Contractor to specify a subcontractor, or the listing of more than one subcontractor for the same portion of the work, constitutes an agreement by the Contractor that it is fully qualified to perform that portion itself and that it will perform that portion itself. II -B-3 Agreement No. 5944 The Contractor must have the City Council's written consent to substitute a subcontractor other than that designated in the original bid, to permit any subcontract to be assigned or transferred, or to allow a subcontract to be performed by other than the original subcontractor. Subcontracting of work for which no subcontractor was designated in the original bid, and which is more than one-half of one percent of the work, will be allowed only in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the City Council setting forth the facts constituting the emergency or necessity. Violation of any of the above provisions will be considered a breach of the Contract, and the City may terminate the Contractor's control over the Work, cancel the contract, or assess the Contractor a penalty of not more than ten percent of the subcontract involved. All persons engaged in the work, including subcontractors and their employees will be considered as employees of the Contractor. The Contractor will be solely responsible for and have control over construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the Work. The City will deal directly with, and make all payments to, the prime Contractor. When subcontracted work is not being prosecuted in a satisfactory manner, the Contractor will be notified to take corrective action. The Engineer may report the facts to the City Council. If the City Council so orders, and on receipt by the Contractor of written instructions from the Engineer, the subcontractor will be removed immediately from the Work. That subcontractor will not again be employed on the Work. If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Contractors' State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of contractors at all times during the performance of any act or contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee. 2-3.2 ADDITIONAL RESPONSIBILITY Add the following to Subsection 2-3.2 Additional Responsibility: The Contractor will submit experience statements for each subcontractor who will perform contract work that amounts to more than ten percent (10%) of the Work. 2-4 CONTRACT BONDS II -B-4 Agreement No. 5944 The following paragraph is added to Subsection 2-4 of the Greenbook. The Faithful Performance Bond and the Labor and Materials Bond must be paid up and in effect for one year after the acceptance of the job by the City in accordance with the guarantee required by Subsection 6-8.1. 2-5 PLANS AND SPECIFICATIONS Subsection 2-5.1 of the Greenbook is replaced by the following subsection. 2-5.1 GENERAL The Contractor will maintain the following at the Work site: One as -built copy of the Plans and Specifications, in good order and marked to record current changes and selections made during construction. As -built plans are to be submitted to the City representative for approval prior to acceptance of the project as complete. 2. The current accepted Contract Schedule. 3. Shop Drawings, Product Data, and Samples. 4. Approved permits from other agencies, including Cal -OSHA permits for trench shoring. 5. All other required submittals. The Plans, Specifications, and other Contract Documents will govern the Work. The Contract Documents are intended to be complementary and cooperative and to describe and provide for a complete project. Anything in the Specifications and not on the Plans, or on the Plans and not in the Specifications, will be as though shown or mentioned in both. Payment for any items on the plans for which there are no specific bid item will be included in the various items of work or in any item to which it is appurtenant. If the Contractor performs any work which it knows or should know involves an error, inconsistency, or omission without notifying and obtaining written consent from the Engineer, the Contractor will be responsible for the resulting losses, including, without limitation, the costs of correcting defective work. 2-5.2 PRECEDENCE OF CONTRACT DOCUMENTS II -B-5 Agreement No. 5944 The following paragraph is added to subsection 2-5.2 of the Greenbook: As the figured dimensions shown on the plans and in the specifications of the Contract may not in every case agree with scaled dimensions, the figured dimensions will be followed in preference to the scaled dimensions, and plans to a large scale will be followed in preference to the plans to a small scale. Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in the Contract, the Contractor will apply to the Engineer for such further explanations as may be necessary, and will conform thereto as part of the Contract so far as may be consistent with the terms thereof. Any items shown on drawings and not mentioned in the specifications will be of like effect as if shown or mentioned in both. 2-5.5 ACCURACY OF PLANS AND SPECIFICATIONS Although it is believed that much of the information pertaining to conditions and existing utilities that may affect the cost of the Work will be shown on the Plans or indicated in the Specifications, the City does not warrant the completeness or accuracy of such information. The Contractor will carefully study and compare each of the Contract Documents with the others and with information furnished by the City and will promptly report in writing to the Engineer any errors, inconsistencies, or omissions in the Contract Documents or inconsistencies with applicable law observed by the Contractor. The Contractor will take field measurements, verify field conditions, perform soil investigations, and carefully compare with the Contract Documents such field measurements, conditions, and other information known to the Contractor before commencing the Work. Errors, inconsistencies, or omissions discovered at any time will be promptly reported in writing to the Engineer. 2-8 RIGHT-OF-WAY The following subsection is added to Subsection 2-8 of the Greenbook. 2-8.1 ADDITIONAL WORK AREAS AND FACILITIES When the Contractor arranges for additional temporary work areas and facilities, the Contractor will provide the City with proof that the additional work areas or facilities have been left in a condition satisfactory to the owner(s) of said work areas or facilities before acceptance of the work. 2-9 SURVEYING Subsection 2-9.3, Survey Service, is deleted in its entirety and replaced by the following subsection: II -B-6 Agreement No. 5944 2-9.3 SURVEY SERVICE 2-9.3.1 CONSTRUCTION SURVEYING The Contractor will provide for all construction surveying required to layout, monitor and complete the work. The surveying will be performed by a Land Surveyor or Civil Engineer authorized to practice land surveying by the State of California. The Project Benchmark is shown on the plans. The Contractor will establish all necessary control lines based on the plans and record information on file with the County of Los Angeles Surveyor and the Engineer. It is the responsibility of the Contractor to protect the survey control as shown on the plans. If the survey control is destroyed or disturbed during construction, the Contractor will provide for resetting them and file appropriate documents with the County of Los Angeles at the direction of the Engineer. Computations, survey notes, and other data used to accomplish the work will be neat, legible and accurate. Copies of all computations, survey notes, and other data (electronic format may be required) will be furnished to the Engineer before beginning work that requires their use. 2-9.3.2 MEASUREMENT AND PAYMENT Construction Survey — Unless a separate bid item is provided, payment will be considered included in the other items of the bid and no additional payment will be made therefore. 3-3.2.2 BASIS FOR ESTABLISHING COSTS Subsection 3-3.2.2 (c), Tool and Equipment Rental is modified where the second and third paragraphs are replaced with "Regardless of ownership, the rates to be used in determining the equipment usage costs will not exceed those listed for the same or similar equipment in the California State Department of Transportation publication of Labor Surcharge and Equipment Rates effective for the period of usage." 3-3.2.3 MARK UP Subsection 3-3.2.3, Mark Up, is deleted in its entirety and replaced by the following subsection: (a) Work by Contractor. The following percentages will be added to the Contractor's costs and will constitute the markup for all overhead and profits. II -B-7 Agreement No. 5944 1) Labor............................................20 2) Materials......................................15 3) Equipment Rental ......................... 15 4) Other Items and Expenditures ...... 15 To the sum of the costs and markups provided for in this subsection, 1 percent will be added as compensation for bonding. No other formula, e.g., the Eichleay or other method, may be used to calculate daily damages for office overhead, profit, or other purported loss. (b) Work by Subcontractors. When all or any part of the extra work is performed by a Subcontractor, the markup established in 3-3.2.3(a) will be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor. (c) In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Bid Form or Contractor's actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents. 3-3.3 DAILY REPORTS BY CONTRACTOR Add the following paragraph to subsection 3-3.3, Daily Reports by Contractor: If disagreement continues regarding extra work, the Contractor may seek compensation in accordance with the Claims procedure. Daily Reports required by this subsection must be made part of the Claim as supporting data for the Claim. 3-4 CHANGED CONDITIONS Subsection 3-4, Changed Conditions, is deleted in its entirety and replaced with the following subsection: If the Contractor encounters concealed or unknown conditions that differ materially from those anticipated or expected ("changed conditions"), the Contractor will immediately notify the Engineer in writing of such changed conditions (upon discovery and before disturbing such changed conditions), as provided in Subsection 6-11, so that the Engineer can determine if such conditions require design details that differ from those design details shown in the Contract Documents. Notwithstanding the thirty (30) day time period set forth in Subsection 6-11.3, the Contractor will be liable to the City for any extra costs incurred as a result of the Contractor's failure to promptly give such notice. Changed conditions will include, without limitation, the following: Agreement No. 5944 Subsurface or latent physical conditions differing materially from those represented in the Contract Documents; 2. Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and 3. Material differing from what is represented in the Contract which the Contractor believes may be hazardous waste as defined in California Health & Safety Code § 25117 that is required to be removed to a Class I, II, or III disposal site in accordance with applicable law. The Engineer will promptly investigate conditions that appear to be changed conditions. The Engineer's decision, and any dispute regarding that decision, will be made in accordance with Section 6-11 except that the Engineer will render a decision promptly. Any information provided pursuant to INFORMATION AVAILABLE TO BIDDERS is subject to the following provisions: The information is made available for the Bidders' convenience and is not a part of the Contract. 2. The City has not determined the accuracy or completeness of such information and all such information is made available to Bidders without any representation or warranty by the City whatsoever as to its accuracy, completeness, or relevancy. 3. Bidders will independently evaluate such information for their use and will be solely responsible for use or interpretation of such information. Any such use or interpretation will not be the basis of any claim against the City. 3-5 DISPUTED WORK Subsection 3-5 is deleted in its entirety and replaced by the following subsection. If the Contractor and the City do not reach agreement on disputed work, the City may direct the Contractor to proceed with the work. Any payment for the disputed work will be determined pursuant to the claims procedures in these Standard Specifications. Although not to be construed as proceeding under extra work provisions, the Contractor will keep and furnish records of disputed work as required by the Contract Documents. 4-1.3 INSPECTION REQUIREMENTS Subsection 4-1.3, Inspection Requirements, is deleted in its entirety and replaced by the following subsections. II -B-9 Agreement No. 5944 4-1.3.1 GENERAL Unless otherwise specified, inspection at the source of production for such materials and fabricated items as bituminous paving mixtures, structural concrete, fabricated metal products, cast metal products, welding, reinforced and unreinforced concrete pipe, application of protective coatings, and similar shop and plant operations is not required. A certificate of compliance, signed by an authorized officer of the producer, certifying compliance with the contract documents will be submitted for all of the following materials: steel pipe, sizes less than 18 inches; vitrified clay pipe; asbestos cement pipe; cast iron pipe; reinforced concrete pipe; non -reinforced concrete pipe; and PVC sewer and water pipe; subject to sampling and testing by City. Standard items of equipment, such as electric motors, conveyors, plumbing fittings and fixtures, lumber, plywood, and so on, are subject to inspection at the job site. All other equipment items will be inspected and tested in accordance with the contract documents. The City does not provide full time inspection. The Contractor will provide 24-hour minimum notice for each inspection required by the work unless other arrangements have been agreed upon, in writing, with the City Engineer. Any inspection required outside of normal working hours and days, including holidays, will be at the Contractor's cost at rates established by the City. 4-1.3.2 INSPECTION OF MATERIALS NOT PRODUCED LOCALLY Contractor purchased materials, fabricated items, and equipment, produced at sources located more than 50 miles outside the corporate limits of the City, and which are specified to be inspected in the Contract Documents, will be inspected by inspectors or testing laboratories arranged for and paid for by City. Report of such inspection must be submitted to the City. If any item inspected fails to meet the specified criteria, the Contractor will pay all costs for reinspection, and such costs may be deducted from payments due to the Contractor. 4-1.6 TRADE NAMES OR EQUALS Whenever any material, product, equipment, or service is specified by brand, trade, or proprietary name, the item so specified will be deemed to be followed by the words "or equal". For the City's consideration of a proposed "equal" item, the Bidder will submit, a minimum of ten (10) calendar days before the date of the bid opening, documentation of the particulars of the proposed "equal item". At a minimum, the submitted documentation will include: II -B-10 Agreement No. 5944 ■ Written request with explanation of why the product should be considered as an equal product. ■ Material specifications. ■ Technical specifications. ■ Test data. ■ Samples. ■ Comparison chart of key specifications of the "equal" item against similar specifications of the specified item. ■ Work locations and reference telephone numbers of at least three (3) locations where the proposed "equal" item has been recently installed under similar conditions. ■ Warranty data. The Bidder will be notified by the Engineer whether or not the proposed "equal" product is acceptable to the City five (5) calendar days before the date of the bid opening. Failure to submit all required documentation and/or submittal of incomplete documents may result in the City's rejection of the proposed "equal" product without further consideration. 5-2 PROTECTION The following subsection is added to Subsection 5-2 of the Greenbook. 5-2.1 INCORRECT LOCATION OF UTILITIES If the Contractor, while performing the Work, discovers utility facilities not identified correctly or not shown in the contract plans or specifications by the City, the Contractor will immediately notify the City and utility owner in writing. 5-4 RELOCATION The following subsection is added to Subsection 5-4 of the Greenbook. 5-4.1 RESPONSIBILITY OF UTILITY REMOVAL OR RELOCATION The City will be responsible to arrange for the removal, repair, or relocation of existing utilities located within the project limits if such utilities are not correctly identified in the contract plans or specifications by the City. The City will have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation. 5-5 DELAYS The following paragraphs are added to Subsection 5-5 of the Greenbook. II -B-11 Agreement No. 5944 Actual loss, as used in this Subsection, will be understood to include no items of expense other than idle time of equipment and necessary payments for idle time of workers, cost of extra moving of equipment, and cost of longer hauls. Compensation for idle time of equipment and idle time of workers will be determined by Subsection 5-5.1 and no markup will be added in either case for overhead and profit. The cost of extra moving of equipment and the cost of longer hauls will be paid for as extra work. The following subsection is added to Subsection 5-5 of the Greenbook. 5-5.1 CALCULATING IDLE TIME Equipment idle time will calculated in accordance with Subsection 3-3.2.2(c) and based upon the actual normal working time during which the delay condition exists, but in no case will exceed 8 hours in any one day. The days for which compensation will be paid will be the calendar days, excluding Saturdays, Sundays and legal holidays, during the existence of the delay. Worker idle time will be calculated in accordance with Subsection 3-3.2.2(a). 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK Section 6-1, Construction Schedule and Commencement of Work, is deleted in its entirety and replaced by the following subsections. Pre -Construction Meeting: After contract award, the City will arrange for a pre -construction meeting to discuss the construction of the project. City will invite utility agencies and the contractor will arrange for all of its sub -contractors to attend the meeting. 6-1.1 CONTRACT SCHEDULE After notification of award and before starting any work, the Contractor will submit a Contract Schedule to the Engineer for review, as required by these Specifications within fifteen (15) days of award. 6-1.2 CONTENT OF CONTRACT SCHEDULE The Contract Schedule, and any updated Contract Schedule, will meet the following requirements: 1. Schedules must be suitable for monitoring progress of the Work. 2. Schedules must provide necessary data about the time for the Engineer's decisions. II -B-12 Agreement No. 5944 3. Schedules must be sufficiently detailed to demonstrate adequate planning for the Work. 4. Schedules must represent a practical plan to complete the Work within the Contract Time. 5. Schedules must show the critical path method for completing the Work. The Engineer's review of the form and general content of the Contract Schedule and any updated Contract Schedules is only for the purpose of determining if the listed requirements are satisfied, nothing more. 6-1.3 EFFECT OF CONTRACT SCHEDULE The Contract Schedule, and any updated Contract Schedules, will represent a practical plan to complete the Work within the Contract Time. Extension of any schedule beyond the Contract Time will not be acceptable. Schedules showing the Work completed in less than the Contract may be acceptable if judged by the Engineer to be practical. Acceptance of such a schedule by the Engineer will not change the Contract Time. The Contract Time, not the Contract Schedule, will control in determining liquidated damages payable by the Contractor and in determining any delay. If a schedule showing the Work completed in less than the Contract Time is accepted, the Contractor will not be entitled to extensions of the Contract Time for Excusable Delays or Compensable Delays or to adjustments of the Contract Sum for Compensable Delays until such delays extend the completion of the Work beyond the expiration of the Contract Time. The Contractor will plan, develop, supervise, control, and coordinate the performance of the Work so that its progress and the sequence and timing of Work activities conform to the current accepted Contract Schedule. The Contractor will continuously obtain from Subcontractors information and data about the planning for and progress of the Work and the delivery of equipment, will coordinate and integrate such information and data into updated Contract Schedules, and will monitor the progress of the Work and the delivery of equipment. The Contractor will act as the expeditor of potential and actual delays, interruptions, hindrances, or disruptions for its own forces and those forces of Subcontractors. The Contractor will cooperate with the Engineer in developing the Contract Schedule and updated Contract Schedules. The Engineer's review and comments about any schedule or scheduling data will not relieve the Contractor from its sole responsibility to plan for, perform, and complete the Work within the Contract Time. Review and comments about any schedule will not transfer responsibility for any schedule to the Engineer or the City nor imply their agreement with (1) any assumption upon which such schedule is based or (2) any matter underlying or contained in such schedule. II -B-13 Agreement No. 5944 The Engineer's failure to discover errors or omissions in schedules that have been reviewed, or to inform the Contractor that the Contractor, Subcontractors, or others are behind schedule, or to direct or enforce procedures for complying with the Contract Schedule will not relieve the Contractor from its sole responsibility to perform and complete the Work within the Contract Time and will not be a cause for an adjustment of the Contract Time or the Contract Sum. The Contractor will perform the Work in accordance with the currently accepted Contract Schedule. 6-1.4 COMMENCEMENT OF CONTRACT TIME The Contract Time will commence when the City issues a Notice to Proceed. The Work will start on the date specified in the Notice to Proceed and within a maximum of fifteen (15) days after the date of the Notice to Proceed, and be diligently prosecuted to completion with the time provided in the Specifications. 6-4 DEFAULT BY CONTRACTOR The language in subsection 6-4 is deleted in its entirety and replaced with the following subsections. 6-4.1 GENERAL Should the Contractor fail to begin delivery of material and equipment, to commence the Work within the time specified, to maintain the rate of delivery of material, to execute the Work in the manner and at such locations as specified, or fail to maintain the Work schedule (as determined by the current accepted Contract Schedule) which will ensure the City's interest, or if the Contractor is not carrying out the intent of the Contract, the City may serve written notice upon the Contractor and the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. 6-4.2 TERMINATION OF CONTRACTOR'S CONTROL OVER THE WORK The City may terminate the Contractor's control over the Work without liability for damages when, in the City's opinion, the Contractor is not complying in good faith, has become insolvent, or has assigned or subcontracted any part of the Work without the City's consent. Should such termination occur, the Contractor will be paid the actual amount due based on Contract Unit Prices or lump sums bid and the quantity and quality of the work completed and in place at the time of termination, less damages caused to the City by the Contractor's action or inaction. In the event of such termination of control, the City may do any one, or combination of, the following: II -B-14 Agreement No. 5944 1. Serve written notice upon the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. In such event the Surety will, within 5 days, assume control and perform the Work as successor to the Contractor; 2. The City may perform the Work itself and deduct the cost thereof from any payment due to the Contractor; 3. The City may replace the Contractor with a different contractor to complete the work and deduct the cost thereof from any payment due to the Contractor. Nothing herein will waive, or serve as a limitation upon, any additional remedy the City may have under these Contract Documents or applicable law. 6-4.3 SURETY'S ASSUMPTION OF CONTROL Should the Surety assume any part of the Work, it will take the Contractor's place in all respects for that part, and will be paid by the City for all work performed by it in accordance with the Contract. If the Surety assumes the entire Contract, all money due the Contractor at the time of its default will be payable to the Surety as the Work progresses, subject to the terms of the Contract. If the Surety does not assume control and perform the Work within 5 days after receiving notice of cancellation, or fails to continue to comply, the City may exclude the Surety from the premises. The City may then take possession of all material and equipment and complete the Work by City's forces, by letting the unfinished work to another contractor, or by a combination of such methods. In any event, the cost of completing the Work will be charged against the Contractor and its Surety and may be deducted from any money due or becoming due from the City. If the sums due under the Contract are insufficient for completion, the Contractor or Surety will pay to the City within 5 days of completion, all costs in excess of the sums due. The provisions of this subsection will be in addition to all other rights and remedies available to the City under applicable law. 6-6 DELAYS AND EXTENSIONS OF TIME Subsections 6-6.1 to 6-6.4 are deleted and replaced with the following subsections. 6-6.1 GENERAL If delays are caused by unforeseen events beyond the control of the Contractor, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor will not be entitled to damages or additional payment due to such delays except as otherwise provided herein. Excusable delay may include: war, earthquakes exceeding 3.5 on the Richter Scale, government regulation, labor disputes outside the II -B-15 Agreement No. 5944 contemplation of the parties, strikes outside the contemplation of the parties, fires, floods, changes to the Work as identified herein, or other specific events that may be further described in the Specifications. Delays to the project caused by labor disputes or strikes involving trades not directly related to the project, or involving trades not affecting the project as a whole will not warrant an extension of time. The City will not grant an extension of time for a delay by the Contractor's inability to obtain materials unless the Contractor furnishes to the Engineer documentary proof. The proof must be provided in a timely manner in accordance with the sequence of the Contractor's operations and accepted construction schedule. Should delays be caused by events other than those included herein, the Engineer may, but is not required to, deem an extension of time to be in the City's best interests. 6-6.2 EXTENSIONS OF TIME If granted, extensions of time will be based upon the effect of delays to the critical path of the Work as determined by the current accepted Contract Schedule. Delays to minor portions of the Work that do not affect the critical path will not be eligible for extensions of time. 6-6.3 PAYMENT FOR DELAYS TO CONTRACTOR Any payment for compensable delay will be based upon actual costs as set forth in Subsection 5-5 excluding, without limitation, what damages, if any, the Contractor may have reasonably avoided. The Contractor understands that this is the sole basis for recovering delay damages and explicitly waives any right to calculate daily damages for office overhead, profit, or other purported loss, using different formulas including, without limitation, the Eichleay Formula. 6-6.4 WRITTEN NOTICE AND REPORT If the Contractor desires payment for a delay or an extension of time, it will give the Engineer written notice of such request not later than the time limit set forth in the Proposal for submitting a claim after the event or occurrence giving rise to a delay claim. Failure to submit a written request within such amount of time will result in the Contractor waiving its delay claim. Any claim for payment or an extension of time must be in the form required by the "Claims" sections of these Specifications. In no event will the City grant the Contractor an extension of time if the delay is within the Contract Time as identified by the Contract Documents. II -B-16 Agreement No. 5944 6-7.2 WORK DAYS AND WORKING HOURS City Hall is open from Monday thru Thursday lam -bpm. It is closed every other Friday and the following holidays: New Year's Day Martin Luther King, Jr. Day President's Day Memorial Day Independence Day Labor Day Veterans' Day Thanksgiving Christmas Eve Christmas New Year's Eve On workdays, Contractor's activities will be confined to the hours between 7:00 a.m. and 4:00 p.m. Please see Section 6-7.5 below for weekend and holiday work restrictions. 6-7.4 NIGHT WORK The following paragraph is added to Section 6-7 of the Greenbook: The City will not permit Work between the hours of 4 p.m. and 7 a.m. of the following day unless specifically provided for in the bid documents or unless the Contractor receives prior written approval. 6-7.5 WEEKEND AND HOLIDAY WORK The Engineer may, but is not required to, allow the Contractor to work on Saturdays, Sundays and City Holidays. 6-8 COMPLETION AND ACCEPTANCE Subsection 6-8 is deleted in its entirety and replaced by the following: The Work will be inspected by the Engineer for acceptance upon the Engineer receiving the Contractor's written assertion that the Work is complete. If, in the Engineer's judgment, the Work is complete and is ready for acceptance, the Engineer will accept the Work on behalf of the City in the manner prescribed by the City. II -B-17 Agreement No. 5944 The Engineer will recommend approval of the Notice of Completion to the City Council. This will be the date when the Contractor is relieved from responsibility to protect the Work. All work will be guaranteed by the Contractor against defective workmanship and materials furnished by the Contractor for a period of 1 year from the date the Work was completed. The Contractor will replace or repair any such defective work in a manner satisfactory to the Engineer, after notice to do so from the Engineer, and within the time specified in the notice. If the Contractor fails to make such replacement or repairs within the time specified in the notice, the City may perform this work and the Contractor's sureties will be liable for the cost thereof. 6-8.1 GENERAL GUARANTY The Contractor will remedy any defects in the work and pay for any damage to other work resulting therefrom, which will appear within a period of one year from the date of final acceptance of the work unless a longer period is specified. The owner will give notice of observed defects with reasonable promptness. 6-9 LIQUIDATED DAMAGES Subsection 6-9, Liquidated Damages, of the Greenbook is deleted in its entirety and replaced by the following subsections. 6-9.1 FAILURE TO COMPLETE WORK ON TIME If all the work called for under the contract is not completed before or upon the expiration of the Contract Time, the City will sustain damage. Since it is and will be impracticable to determine the actual damage which the City will sustain in the event of and by reason of such delay, it is therefore agreed that the Contractor will pay to the City the sum specified in the Proposal for each and every calendar day beyond the time prescribed to complete the work not as a penalty, but as a predetermined liquidated damage. The Contractor agrees to pay such liquidated damages as are herein provided, and in case the same are not paid, agrees that the City may deduct the amount thereof from any money due or that may become due to the Contractor under the contract. Unless otherwise specified, liquidated damages will be $250 per calendar day. 6-11 DISPUTES AND CLAIMS; PROCEDURE 6-11.1 GENERAL Consistent with PCC § 10240.6, "Claim" means a written demand or assertion by the Contractor that seeks an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the II -B-18 Agreement No. 5944 Contract Documents, including a determination of disputes or matters in question between the City and the Contractor arising out of or related to the Contract Documents or the performance of the Work, and claims alleging an unforeseen condition or an act, error, or omission by the City, the Engineer, their agents or employees. "Claim" does not mean, and the Claims procedures herein do not apply, to the following: Claims respecting penalties for forfeitures prescribed by statute or regulations, which a government agency is specifically authorized to administer, settle, or determine. 2. Claims respecting personal injury, death, reimbursement, or other compensation arising out of or resulting from liability for personal injury or death. 3. Claims respecting a latent defect, breach of warranty, or guarantee to repair. 4. Claims respecting stop notices. If a Claim is subject to the Change Order procedures, the Claim arises upon the issuance of a written final decision denying in whole or in part the Contractor's Change Order Request. If a Claim is not subject to the Change Order Procedures, the Claim arises when the Contractor discovers, or reasonably should discover, the condition or event giving rise to the Claim. 6-11.2 FORM A Claim must include the following: A statement that it is a Claim and a request for a decision. 2. A detailed description of the act, error, omission, unforeseen condition, event or other condition giving rise to the Claim. 3. If the Claim is subject to the Change Order procedures, a statement demonstrating that a Change Order Request was timely submitted and denied. 4. A detailed justification for any remedy or relief sought by the Claim, including to the extent applicable, the following: a) If the Claim involves extra work, a detailed cost breakdown claimed. The breakdown must be provided even if the costs claimed have not been incurred when the Claim is submitted. b) To the extent costs have been incurred when the Claim is submitted, the Claim must include actual cost records (including, without limitation, payroll records, material and rental invoices) demonstrating that costs claimed have actually been incurred. C) To the extent costs have not yet been incurred at the time the Claim is II -B-19 Agreement No. 5944 submitted, actual cost records must be submitted on a current basis not less than once a week during any periods costs are incurred. A cost record will be considered current if submitted within 7 days of the date the cost reflected in the record is incurred. At the Engineer's request, claimed extra costs may be subject to further verification procedures (such as having an inspector verify the performance of alleged extra work on a daily basis). 5. If the Claim involves an error or omission in the Contract Documents: a) An affirmative representation that the error or omission was not discovered before submitting a bid for the Contract; and b) A detailed statement demonstrating that the error or omission reasonably should not have been discovered by the Contractor, its Subcontractors and suppliers, before submitting a bid for the Contract. 6. If the Claim involves an extension of the Contract Time, written documentation demonstrating the Contractor's entitlement to a time extension. 7. If the Claim involves an adjustment of the Contract Sum for delay, written documentation demonstrating the Contractor's entitlement to such an adjustment. 8. A personal certification from the Contractor that reads as follows: " I, , BEING THE (MUST BE AN OFFICER) OF (CONTRACTOR NAME), DECLARE UNDER PENALTY OF PERJURY UNDER CALIFORNIA LAW, AND DO PERSONALLY CERTIFY AND ATTEST THAT I HAVE THOROUGHLY REVIEWED THE ATTACHED CLAIM FOR ADDITIONAL COMPENSATION OR EXTENSION OF TIME, AND KNOW ITS CONTENTS, AND SAID CLAIM IS MADE IN GOOD FAITH; THE SUPPORTING DATA IS TRUTHFUL AND ACCURATE; THAT THE AMOUNT REQUESTED ACCURATELY REFLECTS THE CONTRACT ADJUSTMENT FOR WHICH THE CONTRACTOR BELIEVES CITY IS LIABLE; AND, FURTHER, THAT I AM FAMILIAR WITH CALIFORNIA PENAL CODE § 72 AND CALIFORNIA GOVERNMENT CODE § 12650, ET SEQ., PERTAINING TO FALSE CLAIMS, AND FURTHER KNOW AND UNDERSTAND THAT SUBMITTING OR CERTIFYING A FALSE CLAIM MAY LEAD TO FINES, IMPRISONMENT, AND OTHER SEVERE LEGAL CONSEQUENCES." 6-11.3 CLAIMS SUBMITTED TO ENGINEER Within 30 days after the circumstances giving rise to a Claim occur, the Contractor will II -B-20 Agreement No. 5944 submit its Claim to the Engineer for a decision. Regardless of any Claim submittal, or any dispute regarding a Claim, unless otherwise directed by the Engineer, the Contractor will not cause any delay, cessation, or termination of the Work, but will diligently proceed with the performing the Work in accordance with the Contract Documents. Except as otherwise provided, the City will continue to make payments in accordance with the Contract Documents. 6-11.4 CLAIM IS PREREQUISITE TO OTHER REMEDY The Contractor certifies that it is familiar with PCC § 10240.2 and understands and agrees that submitting a Claim in accordance with these Specifications is an express condition precedent to the Contractor's right to otherwise pursue a claim whether through alternative dispute resolution or by litigation. Should the Contractor fail to submit a claim in accordance with these Specifications, including the time limits set forth herein, it will waive any right to a remedy, whether in law or equity, it might otherwise have pursuant to the Contract Documents or applicable law. 6-11.5 DECISION ON CLAIMS The Engineer will promptly review Claims submitted by the Contractor in accordance with these Specifications. Should the Engineer require additional supporting evidence to evaluate the claim, the Engineer will request such additional information in writing. Any such requested data will be furnished not later than 10 days after the Contractor receives the Engineer's request. The Engineer will render a decision not later than 60 days after either receiving the Claim or the deadline for furnishing additional supporting data, whichever is later. If the Engineer fails to render a decision within the time period established herein, then the Claim will be deemed denied. The Engineer's decision will be final and binding unless appealed in accordance with these Specifications. The Engineer's decision on a Claim will include a statement substantially as follows: "This is a decision pursuant to the General Specifications of your contract. If you are dissatisfied with the decision, and have complied with the procedural requirements for asserting claims, you may have the right to alternative dispute resolution or litigation. Should you fail to take appropriate action within 30 days of the date of this decision, the decision will be come final and binding and not subject to further appeal." 6-11.6 APPEAL OF ENGINEER'S DECISION Should the Contractor dispute the Engineer's decision, then the Contractor must appeal that decision to the City's Public Works Director within 30 days of receiving the Engineer's decision. II -B-21 Agreement No. 5944 The Public Works Director will address disputes or claims within 30 calendar days after receiving such request and all necessary supporting data. The Public Works Director's decision on the dispute or claim will be the City's final decision. If the Contractor disputes the Public Works Director's decision, then the Contractor must demand alternative dispute resolution in accordance with this Section and the PCC within 30 days of the City's final decision. 6-11.7 MEDIATION If the City and the Contractor agree, disputes between the parties may be submitted to non-binding mediation. If the parties cannot agree to an alternative form of mediation, then mediation will be administered by the American Arbitration Association ("AAA") under its Construction Industry Mediation Rules, unless the use of such rules are waived by mutual stipulation of both parties. The parties may, but are not required to be, represented by counsel in mediation. The requirement for mediation will not alter or modify the time limitations otherwise provided for claims and no conduct or settlement negotiation during mediation will be considered a waiver of the City's right to assert that claim procedures were not followed. 6-11.8 ARBITRATION If the City and Contractor do not agree to mediation, then a disputes will be submitted to neutral non-binding (except as provided herein) arbitration. Arbitration will be conducted in accordance with PCC § 10240.3. Any decision rendered by an arbitrator will be consistent with PCC § 10240.8. The exclusive venue for any arbitration will be in Los Angeles County. The expenses and fees of the arbitrators and the administrative fees, if any, will be divided among the parties equally. Each party will pay its own counsel fees, witness fees, and other expenses incurred for its own benefit. 6-11.9 WHEN ARBITRATION DECISION BECOMES BINDING The decision rendered by the arbitrator will become binding upon the parties unless appealed to the Los Angeles County Superior Court pursuant to PCC § 10240.12 within 30 days of the decision. If subsequent litigation results in an award to the party appealing the arbitration that is less than or equal to that of the arbitration decision, or if the litigation results in a decision in favor of the nonappealing party, then the party appealing the arbitration will pay the nonappealing party's attorney's fees and court costs. 6-11.10 APPEAL TO SUPERIOR COURT_ WAIVER OF JURY TRIAL II -B-22 Agreement No. 5944 Should a party timely object to the arbitration decision, it may file a petition with the Los Angeles County Superior Court in accordance with California Code of Civil Procedure ("CCP") §§ 1285, et seq. Notwithstanding the limitations set forth in CCP § 1286.2, the court may vacate, correct, or adjust an arbitration award, and enter judgment in accordance with CCP § 1287.4, for any legal or equitable basis including, without limitation, error of law. The court will apply the substantial evidence standard of review when considering the appeal of an objecting party. BY EXECUTING THESE CONTRACT DOCUMENTS, THE CONTRACTOR AGREES TO HAVE DISPUTES OR CONTROVERSY CONCERNING THE CONSTRUCTION, INTERPRETATION, PERFORMANCE, OR BREACH OF THESE CONTRACT DOCUMENTS, INCLUDING CLAIMS FOR BREACH OF CONTRACT OR ISSUES OF BAD FAITH DECIDED IN ACCORDANCE WITH THIS SECTION 6- 11. BOTH THE CITY AND THE CONTRACTOR WAIVE THEIR RIGHT TO A JURY TRIAL FOR THESE DISPUTES OR ISSUES. 6-11.11 AB 626 CLAIMS PROCESS Claims made by a Contractor for one or more of the following are subject to the claim resolution process set forth in Public Contract Code section 9204: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by the city under a contract for a public works project. (B) Payment by the city of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the city. 7-2 LABOR The following subsections are added to Subsection 7-2 of the Green Book. 7-2.3 PREVAILING WAGES The Contractor will post at appropriate conspicuous points at the site of the project a schedule showing determinations of the Director of Industrial Relations of the prevailing rate of per diem wages. It will be the Contractor's responsibility to obtain copies of the prevailing rate of per diem wages. One source that may be used is the California Department of Industrial Relations website which is currently located at www.dir.ca.gov, or by calling the Prevailing Wage Unit at (415) 703-4774. II -B-23 Agreement No. 5944 Attention is directed to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by the Contractor or any subcontractor. Labor Code § 1777.5 requires the Contractor or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except: a) When employment in the area of coverage by the j oint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or b) When the number of apprentices in training in the area exceeds a ratio of one to five, or C) When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or d) When the Contractor provides evidence that the Contractor employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. The Contractor is required to make contributions to funds established for the administration of apprenticeship programs if the Contractor employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions. The Contractor and any subcontractor will comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex -officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. 7-2.4 RECORD OF WAGES PAID: INSPECTION Every Contractor and subcontractor will keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with the Work. The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement. If requested by the City, the Contractor will provide copies of the records at its cost. II -B-24 Agreement No. 5944 7-3 LIABILITY INSURANCE Subsection 7-3, Liability Insurance, of the Greenbook is deleted in its entirety and replaced by the following subsections. 7-3.1 GENERAL Contractor will procure and maintain for the duration of the contract the following insurance coverages and limits against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work covered by this agreement by the Contractor, its agents, representatives, employees or subcontractors: COVERAGE PER OCCURRENCE Comprehensive General Liability Business Auto Workers' Compensation ISO FORM CL 00 02 01 85 or 88 CA 00 0101 87 COMBINED SINGLE LIMIT $2,000,000 $1,000,000 Statutory Contractor will provide endorsements or other proof of coverage for contractual liability. Combined single limit per occurrence will include coverage for bodily injury, personal injury, and property damage for each accident. If Commercial General Liability Insurance or other form with a general aggregate limit is used, the policy will be endorsed such that the general aggregate limit will apply separately to this contract and a copy of the endorsement provided to the City. Liability policies will contain, or be endorsed to contain the following provisions: GENERAL LIABILITY AND AUTOMOBILE LIABILITY: The City, its officers, officials, employees, agents, and volunteers will be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the Contractor; premises owned, occupied or used by the Contractor; or automobiles owned, leased, hired or borrowed by the Contractor. The coverage will contain no special limitations on the scope or protection afforded to the City, its officers, officials, employees, agents, or volunteers. The Contractor's insurance coverage will be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents, and volunteers will be excess of the Contractor's insurance and will not contribute with it. II -B-25 Agreement No. 5944 The insurer will agree in writing to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. Any failure to comply with reporting provisions of the policies will not affect coverage provided to the City, its officers, officials, employees, agents and volunteers. The Contractor's insurance will apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. WORKERS' COMPENSATION: The insurer will agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. ALL COVERAGES: Each insurance policy required by this subsection will be endorsed to state that coverage will not be suspended, voided, cancelled by either party, reduced in coverage or in limits except after thirty (30) days written notice by certified mail, return receipt requested, has been given to: CITY CLERK City of El Segundo 350 Main Street El Segundo, CA 90245 Notwithstanding the foregoing, the endorsement may state that insurance may be cancelled upon ten (10) day notification for non-payment of premium. The Contractor will provide the City with updated proof of insurance should the Contract Time extend beyond the policy expiration date. All liability insurance will be on an occurrence basis. Insurance on a claims made basis will be rejected. Any deductibles or self-insured retentions will be declared to and approved by City. The insurer will provide an endorsement to City eliminating such deductibles or self-insured retentions as respects the City, its officials, employees, agents, and volunteers. Except for Workers Compensation Insurance, Contractor will furnish to City certificates of insurance and endorsements on forms acceptable to the City's City Attorney, duly authenticated, giving evidence of the insurance coverages required in this contract and other evidence of coverage or copies of policies as may be reasonably required by City from time to time. Endorsements must be supplied on ISO Form No. CG 20 10 1185, or II -B-26 Agreement No. 5944 equivalent. Certificate/endorsement for Workers Compensation Insurance will be furnished on State Comp Fund or other industry standard form. Except for worker's compensation insurance, all insurance required herein will be placed with insurers with a Best's Rating of not less than A:VH. Worker's compensation insurance policies will meet the requirements of California law. All subcontractors employed on the work referred to in this contract will meet the insurance requirements set forth for Contractor. Contractor will furnish certificates of insurance and endorsements for each subcontractor at least five days before the subcontractor entering the job site, or Contractor will furnish City an endorsement including all subcontractors as insureds under its policies. Except as provided in Subsection 6-10, the Contractor will save, keep and hold harmless the City, its officers, officials, employees, agents and volunteers from all damages, costs or expenses in law or equity that may at any time arise or be claimed because of damages to property, or personal injury received by reason of or in the course of performing work, which may be caused by any willful or negligent act or omission by the Contractor or any of the Contractor's employees, or any subcontractor. The City will not be liable for any accident, loss or damage to the work before its completion and acceptance, except as provided in Subsection 6-10. The cost of such insurance will be included in the various items of work in the Contractor's bid and no additional compensation for purchasing insurance or additional coverage needed to meet these requirements will be allowed. In the event that any required insurance is reduced in coverage, cancelled for any reason, voided or suspended, Contractor agrees that City may arrange for insurance coverage as specified, and Contractor further agrees that administrative and premium costs may be deducted from payments due to the Contractor. Contractor will not be allowed to work until alternate coverage is arranged. Coverage will not extend to any indemnity coverage for the active negligence of the additional insured if the agreement to indemnify the additional insured would be invalid under Civil Code § 2782(b). 7-3.2 INDEMNIFICATION AND DEFENSE In addition to the provisions of Subsection 7-3 of the Greenbook as between the City and Contractor, Contractor will take and assume all responsibility for the work as stated herein or shown on the plans. The Contractor will bear all losses and damages directly or indirectly resulting to it, to the City, its officers, employees, and agents, or to others on account of the performance or character of the work, unforeseen difficulties, accidents, traffic control, job site maintenance, or any other causes whatsoever. II -B-27 Agreement No. 5944 The Contractor will assume the defense of and indemnify and save harmless the City of El Segundo, its officers, employees, and agents, from and against any and all claims, losses, damage, expenses and liability of every kind, nature, and description, directly or indirectly arising from the performance of the contract or work, regardless of responsibility for negligence, and from any and all claims, losses, damage, expenses, and liability, howsoever the same may be caused, resulting directly, or indirectly from the nature of the work covered by the contract, regardless of responsibility for negligence, to the fullest extent permitted by law. In accordance with Civil Code § 2782, nothing in this Subsection 7-3.2 or in Subsection 7-3 of the Standard Specifications will require defense or indemnification for death, bodily injury, injury to property, or any other loss, damage or expense arising from the sole negligence or willful misconduct of the City, or its agents, servants or independent contractors who are directly responsible to the City, or for defects in design furnished by such persons. Moreover, nothing in this Subsection 7-3.2 or in Subsection 7-3 will apply to impose on the Contractor, or to relieve the City from, liability for active negligence of the City. The City does not, and will not, waive any rights against the Contractor which it may have by reason of the aforesaid hold harmless agreements because of the acceptance by the City, or deposit with City by Contractor, of any insurance policies described in Subsection 7-3 of the Special Provisions. This hold harmless agreement by the Contractor will apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered by reasons of any of the aforesaid operations of Contractor, or any subcontractor, regardless of whether or not such insurance policies are determined to be applicable to any of such damages or claims for damages. No act by the City, or its representatives in processing or accepting any plans, in releasing any bond, in inspecting or accepting any work, or of any other nature, will in any respect relieve the Contractor or anyone else from any legal responsibility, obligation or liability he might otherwise have. 7-5 PERMITS The following paragraph will be added to Subsection 7-5 of Greenbook: The Contractor will apply for permits required by the City Building Safety Division. These permits will be issued on a "no -fee" basis. However, the Contractor must pay for and obtain all other permits from other governmental and utility agencies necessitated by their operations. All bonding fees, (overweight and oversized vehicle permit fees) inspection permit fees or other fees charged or required for such permits must be paid by the Contractor. These costs will be included in the bid item provided. If no bid item is included, costs will be included in the various items of work, and no additional payment will be allowed. II -B-28 Agreement No. 5944 7-8.1 CLEANUP AND DUST CONTROL Subsection 7-8.1, Cleanup and Dust Control, of the Greenbook is deleted in its entirety and replaced by the following subsections. 7-8.1.1 GENERAL On any construction project requiring trenching within public streets and for which total trenching is in excess of 500 feet, the Contractor will be required to sweep the worksite utilizing a pick-up type street sweeper a minimum of once daily. 7-8.1.2 WATERING Water for the laying of dust caused by Contractor's operations or the passage of traffic through the work will be applied as necessary or as directed by the Engineer. Water for the above or other purposes may be obtained from any approved source. If the Contractor chooses to use a City fire hydrant upon placing a $300 meter deposit and the payment of a $50 service fee, the Engineer will cause a meter to be installed. All water used from the hydrant will be metered and charged to the Contractor at the prevailing rate plus the current daily meter rental rate. The Contractor will be charged a $15 reconnect fee if the Contractor wishes to move the meter to a different hydrant. Costs of water to be used will be included in the cost of various bid items. 7-8.6 WATER POLLUTION CONTROL This section is supplemented by the addition of the following requirements which establish storm water and urban runoff pollution prevention controls. (a) Storm or construction generated water containing sediment such as, construction waste, soil, slurry from concrete/asphalt concrete saw cutting operations, clean up of concrete transit mixers or other pollutants from construction sites and parking areas will be retained or controlled on site and will not be permitted to enter the storm drain system. (b) Temporary sediment filtering systems such as sandbags, silt fences, or gravel berms will be utilized to trap sediment so that only filtered water enters the City's storm drain system. Proper clean up and disposal of settled sediment and the filtering system will be the responsibility of the CONTRACTOR. (c) Discharge of concrete transit mixer wash water on to approved dirt areas (sub - grade area designated for new concrete construction for example) is acceptable. Discharge on to private property, parkway areas, or the street is not permitted. (d) Plastic or other impervious covering will be installed where appropriate to prevent erosion of an otherwise unprotected area, along with any other runoff II -B-29 Agreement No. 5944 control devices deemed appropriate by the City. (e) Excavated soil stored on the site will be covered in a manner that minimizes the amount of sediments running into the storm drain system, street or adjoining properties. (f) No washing of construction or other industrial vehicles and equipment will be allowed adjacent to a construction site. During the rainy season (October 15 to April 15), Contractor will keep at the construction site sufficient materials and labor to install temporary sediment filtering systems and other water pollution prevention control measures. These control measures will be in place and maintained by the Contractor on a daily basis on days when construction is not in progress due to rain. (h) All costs associated with water pollution control will be borne by the Contractor. Any expense incurred by the City to expeditiously respond to storm drain contamination resulting from Contractor's failure to implement water pollution control measures will be charged to the Contractor. 7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS Section 7-9 is supplemented by the following additional requirements: Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectively reduced by the Contractor's operations, such striping or markings will also be considered as existing improvements and the Contractor will replace such improvements. Relocations, repairs, replacements, or re -establishments will be at least equal to the existing improvements and will match such improvements in finish and dimensions unless otherwise specified. 7-10 PUBLIC CONVENIENCE AND SAFETY Section 7-10 is supplemented by the following additional requirements: Unless otherwise specified all traffic control will be performed in accordance with the Work Area Traffic Control Handbook (WATCH) Latest Edition, published by Building News, 3055 Overland Avenue, Los Angeles, CA 90034, telephone 310-474-7771. 7-10.1 TRAFFIC AND ACCESS The Contractor will notify the occupants of all affected properties at least 48 hours prior to any temporary obstruction of access. Vehicular access to property line will be maintained except as required for construction for a reasonable period of time. No II -B-30 Agreement No. 5944 overnight closure of any driveway will be allowed except as permitted by the Engineer. At least one (1) twelve (12) foot wide traffic lane will be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The traffic lanes will be maintained on pavement, and will remain unobstructed. All work requiring that a lane be closed or a lane moved right or left will be noticed to the traveling public by use of City approved lighted arrow boards. Clearances from traffic lanes will be five feet to the edge of any excavation and 2 feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction. One four (4) foot wide paved pedestrian walkway will be maintained in the parkway area on each side of all streets. The clearance from the pedestrian walkway to any traffic lane will be five (5) feet. Pedestrians and vehicles will be protected from all excavations, material storage, and/or obstructions by the placement of an adequate number of lighted barricades (minimum two (2)) at each location, one (1) at each end of the obstruction or excavation), which will have flashing lights during darkness. Barricades will be Type I or Type H per Section 7-3 and lights will be Type A per Section 7-6 of the "Work Area Traffic Control Handbook" (WATCH). 7-10.2 STREET CLOSURES, DETOURS, BARRICADES Street closures will not be allowed except as specifically permitted by the Engineer. The Contractor will prepare any traffic control or detour plans that may be required as directed by the Engineer. Lane transitions will not be sharper than a taper of thirty (30) to one (1). Temporary traffic channelization will be accomplished with barricades or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor will prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed on finish pavement surfaces, which are to remain. Where access to driveway or street crossings need to be maintained, minimum 1 1/4 inch thick steel plating will be used to bridge the trench. All steel plating will have temporary asphalt concrete 1:12 minimum sloped ramps to assist vehicles to cross comfortably over the plates and have a non-skid surface. Plates subject to vehicle high traffic speeds and in residential areas will be secured by welding at the discretion of the Engineer. 7-10.5 PROTECTION OF THE PUBLIC It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor will use foresight and will take such steps and precautions as his operations warrant to protect the public from danger, loss of life or II -B-31 Agreement No. 5944 loss of property, which would result from interruption or contamination of public water supply, interruption of other public service, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the Project which will require that immediate and unusual provisions be made to protect the public from danger or loss of life, or damage to life and property, due directly or indirectly to prosecution of work under this contract. Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor's operations and when, in the opinion of the Engineer, immediate action will be considered necessary in order to protect the public or property due to the Contractor's operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation immediately, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer, may seem reasonable and necessary. The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, will be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. Such remedial measures by the City will not relieve the Contractor from full responsibility for public safety. 7-15 HAZARDOUS MATERIAL The following Subsection will be added to Section 7 of the Greenbook: For any excavation, which extends more than four feet below existing grade, the Contractor will promptly, and before the conditions are disturbed, notify the Engineer, in writing, of 1) any material that the Contractor believes may be hazardous waste, as defined in Health and Safety Code § 25117, which is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law, 2) subsurface or latent physical conditions at the site differing from those indicated, or 3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. After receiving notice from the Contractor, the Engineer will promptly investigate any condition identified by the Contractor as being hazardous. The rights and obligations of the City and the Contractor with regard to such conditions (including, without limitation, the procedures for procuring change orders and filing claims) will be specified by the provisions of Subsection 3-4 (Changed Conditions) of the Greenbook. II -B-32 Agreement No. 5944 If a dispute arises between the City and the Contractor whether the conditions materially differ, involve hazardous waste, or cause a change in the Contractor's cost or time required for performance of the work, the Contractor will not be excused from any scheduled completion date provided for by the contract, but will proceed with all work to be performed under the contract. The Contractor will retain all rights provided by Subsection 3-5, Disputed Work, of the Greenbook. If the Engineer determines that material called to the Engineer's attention by the Contractor is hazardous waste, or if the Engineer otherwise discovers the existence of hazardous waste, the Contractor will be responsible for removal and disposal of the hazardous waste by qualified personnel and appropriate equipment in the manner required by law as directed by the Engineer, subject to the provisions of Section 3 (Changes in Work) of the Greenbook. 9-2 LUMP SUM WORK Subsection 9-2, Lump Sum Work, of the Greenbook is deleted in its entirety and replaced by the following: Items for which quantities are indicated as "Lump Sum," "L. S.," or "Job" will be paid for at the price indicated in the Proposal. Such payment will be full compensation for all costs for labor, equipment, materials and plant necessary to furnish, construct and install the lump sum item of work, complete, in place, and for all necessary appurtenant work, including, but not limited to, all necessary cutting, patching, repair and modification of existing facilities, and clean up of site. Contractor will furnish three copies of a detailed schedule, which breaks down the lump sum work into its component parts and cost for each part, in a form and sufficiently detailed as to satisfy Engineer that it correctly represents a reasonable apportionment of the lump sum. This schedule is subject to approval by Engineer as to both the components into which the lump sum item is broken down, and the proportion of cost attributable to each component. This schedule will be the basis for progress payments for the lump sum work. 9-3.2 PARTIAL AND FINAL PAYMENTS The text of Subsection 9-3.2 of the Standard Specifications is hereby deleted and replaced with the following: The closure date for the purpose of making partial progress payments will be the last working day of each month. The Contractor will prepare the partial payment invoice with measurement of the work performed through the closure date and submit it to the CITY for approval. II -B-33 Agreement No. 5944 When work is complete, the Contractor will determine the final quantities of the work performed and prepare the final progress payment, and submit it to the Engineer for approval. It will take a minimum of thirty-five (35) calendar days from the date of approving the Contractor's invoice to make the payment to the Contractor. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents, or legal release of filed Stop Payment Notices against the Contractor. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as -built conditions. The full five percent (5%) retention will be deducted from all progress payments. The Contractor will make a payment request for the retained amount, for approval by the City, upon field acceptance of the work by the City Engineer. The City Engineer upon field acceptance and receipt of the final as -built plans and any other reports or documents required to be provided by the Contractor will process a recommendation to the City Council for acceptance of the work. Not less than thirty-five (35) calendar days from the City Council acceptance of the work, the Contractor's final payment will be made provided Stop Payment Notices or other claims have not been filed against the Contractor and/or the City by material suppliers, sub -contractors, other governmental agencies, and private property owners. Until these Stop Payment Notices are released and claims are resolved the stop payment/claim amount will be withheld from the final payment. The Contractor, however, may receive interest on the retention for the length of construction, or receive the retention itself as long as the retention is substituted with escrow holder surety or equal value. At the request and expense of the Contractor, surety equivalent to the retention may be deposited with the State Treasurer, or a State or Federally chartered bank, as the escrow agent, who will pay such surety to the Contractor upon satisfactory completion of the contract. Pursuant to PCC § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, that any such election will be at the Contractor's own expense and will include costs incurred by the City to accommodate the Contractor's request. Progress payment paid by the City as contemplated herein, will be contingent upon the Contractor submitting, in addition to any additional documents, an updated Contract Schedule in the form prescribed by these Contract Documents. Failure of the Contractor to submit an acceptable updated Contract Schedule will result in the City withholding partial payment, without liability to the City, until such an acceptable updated Contract Schedule is submitted. Nothing herein will allow the Contractor to suspend or slow II -B-34 Agreement No. 5944 progress of the Work. A City Council resolution established a Project Payment Account, encumbered money in the current budget, and assigned that money to the Project Payment Account which is the sole source of funds available for payment of the Contract Sum. Contractor understands and agrees that Contractor will be paid only from this special fund and if for any reason this fund is not sufficient to pay Contractor, Contractor will not be entitled to payment. The availability of money in this fund, and City's ability to draw from this fund, are conditions precedent to City's obligation to make payments to Contractor. 9-3.3 DELIVERED MATERIALS Materials and equipment delivered or stored, but not incorporated into the work, will not be approved for progress payments. 100-1 TERMINATION OF AGENCY LIABILITY Before receiving final payment, the Contractor will execute a Release on Contract" form which will operate as, and will be a release to the City, the City Council, and each member of the City Council and their agencies, from all claims and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act of neglect of the City of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided in Subsections 9-3 of the Standard Specifications and except for any unsettled claims listed on said form which have been filed in compliance with the requirements for making claims. - END OF SECTION - II -B-35 Agreement No. 5944 SECTION III — SPECIAL PROVISIONS 1-0. GENERAL SCOPE, TIME FOR COMPLETION, AND LOCATION OF WORK 1-1. General Scope of Work: The work to be done consists of furnishing all labor, materials, tools, equipment and incidental for the construction/installation, complete in place, of street cold milling, street resurfacing (asphalt concrete overlay), utility manhole and valve can adjustments, striping, street sweeping, and traffic control as described in the Special Provisions. This project will involve asphalt concrete overlay. One lane of through traffic shall be allowed in the construction area at all times. Existing pavement markers and striping shall be removed for the paving and then re -installed once resurfacing has occurred. Catch basins shall be appropriately protected from construction debris, and existing flow lines to catch basins shall be maintained during and after street resurfacing. Contractor shall implement pedestrian and vehicle traffic control to direct the general public away from the project site before and during construction. All work shall conform to all applicable State, local, regional and Federal codes, ordinances, and regulations as prescribed by the City. 1-2. General Standards and Proiect Specifications 1. All work shall be performed in accordance with the Standard Specifications for Public Works Construction, 2018 or latest edition, including supplements thereto, American Public Works Association, Standard Plans for Public Works Construction, the City of El Segundo Engineering Division's Standard Drawings, unless otherwise shown on the plans, or as specified herein. 2. Strict compliance with State and local safety codes will be enforced. 3. Legible copies of material/weight certification shall be turned over to the inspector on a daily basis. 4. The Engineer's decision shall be final as to interpretation and/or conflict between any of the referenced code, laws, ordinances, specifications and standards contained herein. 1-3. Location of the Work: 1. E. Imperial Avenue from McCarthy Court to California Street. 2. E. Pine Avenue from Arena Street to Center Street. 1-4. Examination of the Job Site The BIDDER shall make a detailed physical inspection of the site and submit any questions whose answers may affect their bid price, to City staff by the deadline III -A-1 Agreement No. 5944 provided, before submitting a proposal. It is understood that BIDDERS have satisfied themselves, before submitting a bid, regarding existing conditions and existing access which may affect bid prices for the proposed work. 1-5. Working Days and Time for Completion: 1. Contractor will begin work on the mutually agreed-upon City of El Segundo's Notice to Proceed date. The work shall be completed within twenty-five (25) working days after the date of commencement. 2. The project shall be constructed in the period between mid-July and September 4. Pine Street paving shall be completed prior to August 11 when the school year will begin. 3. Work hours on E. Imperial Avenue shall be 9:00 am to 3:00 pm on weekdays. 4. Work hours on E. Pine Avenue shall be 7:00 am to 4:00 pm on weekdays. 5. No work shall occur on City holidays, listed in Section H-6-7.2. 111-A-2 Agreement No. 5944 2-0. NOTIFICATIONS The CONTRACTOR will notify all agencies listed here in a minimum of forty-eight (48) hours before start of operation. The following list of names and telephone numbers are intended for the convenience of the CONTRACTOR and the City does not guarantee either the completeness or correctness of this list. OPERATION OFFICE TELEPHONE 1. Start of work, Floriza Rivera, Public Works Staff 310-524-2361 shutdown of work, Beto Moreno, Street Maintenance Supervisor 310-524-2899 or resumption of work after shutdown Lifan Xu, City Engineer 310-524-2368 Mark Watkins, Director of Public Works 310-524-2356 2. Closing of streets El Segundo Police Department** 310-524-2200 El Segundo Fire Department** 310-524-2236 * * The CONTRACTOR will notify the Engineering Division before notifying these offices. The following information is provided for CONTRACTOR'S use to notify agencies if their facilities are affected by CONTRACTOR'S work: 1. Underground Service Alert (all excavation in public right-of-way) 800-227-2600 2. City of El Segundo — Water Division 310-524-2742 3. City of El Segundo - Wastewater Division 4. City of El Segundo - Recreation and Parks 5. Southern California Gas Company 6. Southern California Edison Company (SCE) 7. AT&T 8. Time Warner Communication (Cable) 9. Los Angeles County Sanitation District 10. El Segundo Unified School District 2-1. NO PARKING NOTIFICATIONS 310-524-2754 310-524-2707 310-671-9002 310-417-3366 310-515-4430 310-768-0400 Extension 414 310-699-7411 310-615-2650 The CONTRACTOR shall post City -approved temporary NO PARKING notices a minimum of seventy-two (72) hours before the start of operation. The CONTRACTOR shall promptly notify City staff once posting is completed in order to ensure the 72 - hour requirement has been met. III -A-3 Agreement No. 5944 3-0. INSPECTION Section 4-1.3 on page H -B-9 of these Specifications is supplemented by the following additional requirements: 1. On all questions relating to quantities, the acceptability of material, or work, the execution, progress or sequence of work, and the interpretation of specifications or plans, the decision of the Engineer or City Inspector is final and binding, and shall be precedent to any payment under the contract. 2. All work and materials are subject to inspection and approval of the Engineer or City Inspector. 3. Legible copies of material/weight certification shall be turned over to the City Inspector on a daily basis. 4. Inspection of the work shall not relieve the Contractor of the obligations to fulfill all conditions of the contract. 4-0. USE OF PRIVATE PROPERTY The use of any private property by the Contractor is prohibited. The prohibited uses include, but are not limited to the, Contractor's use of water, electricity or natural gas from the private property, and storage of material or equipment and turning around/ parking of company vehicles on private property. 5-0. STORAGE OF MATERIALS AND EQUIPMENT 1. No material or equipment shall be stored in public right-of-way. 2. The contractor shall be responsible for obtaining a site for storage of material and equipment. The site shall not be within or adjoining the residential areas of the City. Site shall be subject to approval by the City. 3. The sites for stockpiling and batching materials shall be clean and free from objectionable material. 4. The City does not have nor does it guarantee any designated property within the City for storage of materials. 5. If the Contractor finds a private property for storage of his materials, the Contractor shall furnish the City a letter of approval and a letter of release (at the end of the job and cleanup of the storage site) from the property owner for this purpose. III -A-4 Agreement No. 5944 6-0. CENTERLINE TIES AND BOUNDARY MARKERS The Contractor is to verify if there are existing centerline ties or boundary markers in the way of construction and submit such verification to City staff prior to demolition/removal. If they cannot be protected in place, Contractor's state -licensed surveyor is to re-establish them after construction and provide the City with the new centerline tie information at no additional cost to the City. 7-0. QUALITY ASSURANCE Contractors shall exercise due care to assure procurement, storage and placement of materials form site or offsite sources which will comply with the requirements, specifications and standards set out herein. Contractor may, at his discretion, have such tests and inspections as he may desire performed by qualified personnel or independent testing services, for his guidance and control of the work. If required by the City, the contractor shall provide and pay for geotechnical and structural inspection and testing by independent testing service selected by the Contractor and approved by the City. In this regard, a Geotechnical Engineer and Structural Engineer retained by the Contractor will act as the direct representative to perform duties such as inspection of the removal and placement of unsuitable materials, and footings, and the placement and compaction of all fills and backfills within the limits of the Project. The definition of Geotechnical Engineer registered in the State of California in all matters relating to geotechnical work required for the Contract. The definition of Structural Engineer shall include an Engineer registered in the State of California in all matters relating to structural work required for the Contract. Costs for all such inspections and tests will be paid by the Contractor. The Contractor shall bear the cost of retest/re-inspection of work due to non-compliance. III -A-5 Agreement No. 5944 SECTION IV — MEASUREMENT AND PAYMENT 1-0. GENERAL: Proposed Bid prices shall be complete for each bid item. The bid item work below to be measured and paid for shall be carried out in accordance with the Standard Specifications, the proj ect plans, these specifications, as directed by the City Inspector, and in addition any applicable government codes related to the work or named in the descriptions for the bid item. Prior to bidding, the Contractor shall inspect project areas and bring any discrepancies to the City's attention. Bid item prices shall cover the costs for all mobilization, demolition, excavation, site preparation, pavement installation, striping and marker installation, utility cover adjustments, and other construction activities, and demobilization activities required for each item. Bid item costs shall include complete removal and immediate disposal of excavation debris, preparatory removal of vegetation, tree stumps, and tree roots as necessary, temporary paving and public safety measures, and the restoration of landscaping, public and private property damaged during the construction, to the City's satisfaction. Should the contractor request and obtain permission to use admixtures for its own benefit, it shall furnish such admixtures and incorporate them in the mixture at its expense, and NO additional compensation will be allowed. 2-0. BID ITEMS 2-1. Mobilization/Demobilization and Traffic Control (Bid Item 1) The maximum lump sum price bid for this item shall not exceed 5% of the total contract price, payment for which will be made on a percentage -completed basis of the lump sum price named in the Bid Schedule, which price shall constitute full compensation for all labor, equipment, tools, materials and incidentals needed to mobilize and provide traffic control. The scope of work included under Bid Item 1 shall include the items listed under Mobilization and traffic control described in these specifications. All traffic warning signs shall be illuminated or reflectorized when they are used during hours of darkness. All cones, pylons, barricades, or posts used in the diversion of traffic shall be provided with flashers or other satisfactory illumination if in place during hours of darkness. Uneven pavement surfaces shall be temporarily ramped per accepted standards until surfaces are brought to final grade. 2-2. Cold mill 2" existing asphalt concrete pavement (Bid Item 2) Cold -milling shall be paid on a units -completed basis at the contract unit price per unit named in the Bid Schedule, which price shall constitute full compensation for W -A-1 Agreement No. 5944 furnishing all labor, equipment, tools, materials and incidentals needed for doing all work to removal of existing asphalt concrete, including cold planing, dust control, street sweeping, removal, and disposal of asphalt material. The unit price shall also include removal of vegetation as necessary at the curb line in order to accommodate milling and paving equipment. Vegetation removal shall be conducted using only sharp gardening tools such as hedge trimmers. 2-3. Overlav 2" asphalt concrete pavement (Bid Item 3) Overlay shall be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule, for furnishing all labor, equipment, tools, materials and incidentals needed for installation of C2 PG -64-10 asphalt hot mix including tack coat. Included in the bid price are allowances for pavement replacement for items where it is incidental to. No extra compensation will be made should additional paving need to be done due to Contractor's operations. The contract unit price shall include full compensation for establishing proper flowlines, compaction, joining to existing pavement, and finishing activities. 2-4. Adiust sewer and storm drain manhole covers to final grade (Bid Item 4) Manhole adjustment and associated work will be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule, which price shall constitute full compensation for furnishing all labor, equipment, tools, materials and incidentals for adjustment of manholes. Note: contractor shall coordinate with other utility agencies for grade adjustment of any manhole covers other than sewer or storm drain manhole covers. 2-5. Adiust water valve covers to final grade (Bid Item 5) Valve cover adjustment and associated work will be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule, which price shall constitute full compensation for furnishing all labor, equipment, tools, materials and incidentals for adjustment of valve covers. Note: contractor shall coordinate with other utility agencies for grade adjustment of any valve or vault covers other than water valve covers. 2-6. Replace striping, pavement markings, and pavement markers (Bid Item 6) Replacement of various striping, pavement markings, and pavement markers will be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule, and shall include compensation for finishing all labor, equipment, tools, materials and incidentals needed to replace striping, markings, and pavement markers to approved standards and their original positions. Appendix 6 shows the striping and marking items for which a schedule of values will later be requested from the successful contractor. IV -A-2 Agreement No. 5944 3-0 ALTERNATE BID ITEMS 3-1. Six -inch -deep asphalt repairs (Alt. Bid Item 7) Four -inch -deep asphalt repairs in place will be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule. Payment for this item shall include full compensation for 6 -inch -deep asphalt repairs per Section V including sawcutting, asphalt removal, installation of base, PG 64-10 tack coat, installation of C2 PG 64-10 hot mix asphalt, dust control and other related items. The Contractor is advised to inspect the site to see where areas shall be removed and replaced. Asphalt repairs shall take place prior to overlay activities and traffic control shall be per Section V. 3-2. Grind and overlav of California Street between Imperial Hiahwav and Cul-de-sac (including California St./Imperial Ave. intersection) (Alt. Bid Items 8-12) Cold mill 2" existing asphalt concrete pavement (Alt. Bid Item 8) Cold -milling shall be paid on a units -completed basis at the contract unit price per unit named in the Bid Schedule, which price shall constitute full compensation for furnishing all labor, equipment, tools, materials and incidentals needed for doing all work to removal of existing asphalt concrete, including cold planing, dust control, street sweeping, removal, and disposal of asphalt material. The unit price shall also include removal of vegetation as necessary at the curb line in order to accommodate milling and paving equipment. Vegetation removal shall be conducted using only sharp gardening tools such as hedge trimmers. Overlav 2" asphalt concrete pavement (Alt. Bid Item 9) Overlay shall be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule, for furnishing all labor, equipment, tools, materials and incidentals needed for installation of C2 PG -64-10 asphalt hot mix including tack coat. Included in the bid price are allowances for pavement replacement for items where it is incidental to. No extra compensation will be made should additional paving need to be done due to Contractor's operations. The contract unit price shall include full compensation for establishing proper flowlines, compaction, joining to existing pavement, and finishing activities. Adiust sewer and storm drain manhole covers to final grade (Alt. Bid Item 10) Manhole adjustment and associated work will be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule, which price shall constitute full compensation for furnishing all labor, equipment, tools, materials and incidentals for adjustment of manholes. Note: contractor shall coordinate with other utility agencies for grade adjustment of any manhole covers other than sewer or storm drain manhole covers. IV -A-3 Agreement No. 5944 Adiust water valve covers to final grade (Alt. Bid Item 11) Valve cover adjustment and associated work will be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule, which price shall constitute full compensation for furnishing all labor, equipment, tools, materials and incidentals for adjustment of valve covers. Note: contractor shall coordinate with other utility agencies for grade adjustment of any valve or vault covers other than water valve covers. Replace striping, pavement markings, and pavement markers (Alt. Bid Item 12) Replacement of various striping, pavement markings, and pavement markers will be paid for on a units -completed basis at the contract unit price per unit named in the Bid Schedule, and shall include compensation for finishing all labor, equipment, tools, materials and incidentals needed to replace striping, markings, and pavement markers to approved standards and their original positions. Appendix 6 shows the striping and marking items for which a schedule of values will later be requested from the successful contractor. 4-0 PAYMENT OF CHANGE ORDER ITEMS Payment of any change order item shall only occur if the item is added to the project scope through both a change order agreement and, if necessary, an amendment agreement. Contractor shall check with the City Inspector prior to proceeding with any potential change order work. A written Request for Information shall be provided to the City regarding potential change order work. Additional project work of exactly the same type and scope mentioned under the sections listed above shall apply the bid unit price used by the bidder. Costs for work not similar in type and scope to those listed in the sections above shall be agreed upon by the Contractor and City through a change order agreement. Per Section II -3-4, the Contractor shall inform City inspector of any changed conditions. The City Inspector and the Contractor together shall then record the date the changed conditions were found, the nature of the changes, the measurements taken, the time period for any additional labor, and the number and labor classification of those laborers. This information may be required for determining costs. Any additional work similar in scope as described above and approved as project's change order shall be calculated at the Contractor's unit bid cost. Both agreements shall be completed by the Contractor and the City and the original purchase order updated prior to payments occurring for the change order items. A change order agreement greater than 25 percent of the original bid/contract amount also requires the approval of City Council before the purchase order can be updated and any payment processed for the change order. IV -A-4 Agreement No. 5944 5-0 PROGRESS PAYMENTS Lump sum items shall be billed on a percentage completed basis. The City reserves the right to request a schedule of values to be submitted by the contractor for any or all bid items in order to determine payment for work completed. IV -A-5 Agreement No. 5944 SECTION V — TECHNICAL SPECIFICATIONS 1-0. MOBILIZATION Mobilization shall conform to the provisions of Section 9-3.4 of the Standard Specifications. The scope of work under mobilization includes but is not limited to: 1. Obtaining all required permits 2. Moving on to the site of all Contractor's equipment required for operations 3. Providing on-site sanitary facilities 4. Arranging for and erection of Contractor's work and storage yard 5. Posting all OSHA required notices 6. Submittal of Construction Schedule, Contractor Contact List, Centerline Tie Inventory, Survey Marking Inventory, and Notices to City staff for City approval 7. Distribution of a City -approved Notice to Business and Residents at least one week prior to construction. 8. Notification of property owners, businesses, residents, and motorists, using temporary traffic warning and safety signage where construction is or will be occurring. Notification shall be furnished by Contractor and shall be distributed seventy-two (72) hours prior to work in that area. 9. Re -notification of all affected parties for all construction schedule changes 10. Traffic control as required per W.A.T.C.H. manual and CA MUTCD or approved traffic control plans 11. Coordinating with Underground Service Alert (USA) or Dig Alert to mark underground utilities before any excavation 12. Coordination with utility agencies, street sweeper, and waste hauler to avoid conflicts during project activities 13. Steel plating and/or asphalt ramping for excavated trenches and areas of uneven elevations 14. Restoration to existing standard conditions or better, of private and public property damaged during construction 15. NPDES permit compliance 16. Bringing unforeseen field conditions to City staff's attention in a timely manner 17. Demobilization 1-1. Clearing, grubbing, and landscape removal shall take place as necessary for all construction activities to occur, including but not limited to Section 300-1 of the Standard Specifications. If applicable, live tree roots shall be inspected by the Recreation and Parks Department after the surface above them has been removed, to ascertain if tree root barrier installation or full tree removal is necessary. Costs for clearing, grubbing, and landscape/tree root removal shall be included in the bid prices for the different bid items. All such removals shall take place prior to any excavation for construction. Where necessary, the contractor shall replace residential landscaping or sprinklers damaged by construction after construction is complete. 1-2. Underground Service Alert, 1-800-227-2600, shall be contacted and the contractor shall determine the exact location of all utilities prior to beginning excavation and V -A-1 Agreement No. 5944 construction. If conflicts are discovered, the Contractor shall notify the Engineer immediately. A detailed description of the depth and location of utility conflicts in relation to the proposed storm drain facilities shall be provided to City Inspector as well as the applicable utility agency. A list of utility agency and waste hauler contact number is included in the Appendix. 1-3. Demobilization shall include all activities for the Contractor to remove all equipment, on-site sanitary facilities, etc. from the project areas after construction is complete. Demobilization shall also include general cleanup activities and punch list items and specific activities determined by the City Public Works Inspector, to repair or replace any private or public facilities damaged by the construction and to return public right- of-way to the same or better condition as that existing prior to construction. 2-0 NOTIFICATION Due to the nature of this project involving some inconvenience to residents, businesses, and the public, a good public relations program is mandatory and evidence of satisfactory past performance in this area will be required. The City will require the Contractor to distribute two (2) "Public Notice" documents to each business and resident affected by the construction. The Contractor shall submit all required resident and property owner notices to the City at the pre -construction meeting for approval. Notices shall include the project times, dates, working hours, description of project activities, a description of any steps required of owners and residents to ensure safety and successful construction, and shall inform residents of the possible effects of driving through the asphalt and onto their properties before the pavement is set. The first notice shall be distributed ten (10) calendar days prior to the start of any work. The second notice shall be distributed at least forty-eight (48) hours prior to the start of work. The second notice shall be attached to a red information hanger provided by the Contractor and hung on the front door knob of every resident/ business on the project streets. The Contractor shall place delineators and postdated "TEMPORARY NO PARKING" signs on the curb at least 72 hours in advance of the construction, to alert motorists that parking shall not occur at the location and for what length of time. The signs are subject to the approval of the Engineer. (See Appendix for City Standard detail for "Typical Temporary No Parking Sign".) The Contractor shall inform the inspector or City staff every morning of all locations being worked on and all locations being posted for that day for TEMPORARY NO PARKING. The dates and times on the signs shall be site specific and shall cover the minimum time required for "NO PARKING" to facilitate construction. Generic long-term "NO PARKING" time designations are not acceptable. Parking shall not be restricted during any period when construction activity is not scheduled at this particular site. The Contractor shall submit traffic control plans and project schedules to City staff at the project pre -construction meeting. Any changes to plans and schedules must be submitted to staff prior to their occurrence. Traffic control shall adhere to W.A.T.C.H. V -A-2 Agreement No. 5944 manual guidelines. The contractor shall notify motorists of impending detours at least forty-eight hours prior to their occurrence, through the use of traffic control devices. ONCE A SECTION OF STREET HAS BEEN POSTED, FAILURE OF THE CONTRACTOR TO MEET AND COMPLETE THE APPROVED DAILY SCHEDULE DUE TO CONDITIONS UNDER THE CONTRACTORS CONTROL, WILL RESULT IN DAMAGES BEING SUSTAINED BY THE AGENCY. SUCH DAMAGES ARE, AND WILL CONTINUE TO BE, IMPRACTICAL AND EXTREMELY DIFFICULT TO DETERMINE. FOR FAILURE TO MEET AND COMPLETE THE SCHEDULE AFTER POSTING, THE CONTRACTOR SHALL PAY TO THE CITY, OR HAVE WITHELD FROM MONIES DUE, THE SUM OF $200 AS LIQUIDATED DAMAGES FOR EACH DAY OF ADDITIONAL POSTING REQUIRED TO COMPLETE THE PROPOSED WORK. REPOSTING AND NOTIFICATION WILL BE REQUIRED FOR EACH MISSED DAY. SAID POSTING AND NOTIFICATION WILL BE AT THE CONTRACTOR'S EXPENSE. The CONTRACTOR shall be responsible for adequate barricading of the work area and controlling of traffic in the vicinity of the project as specified in Sub- section 7-10 of the General Provisions. Should the CONTRACTOR appear to be neglectful or negligent in furnishing warning and protective devices, the City Engineer may direct attention to the existence of a hazard and the necessary warning and protective measures shall be furnished and installed immediately by the CONTRACTOR at his/her expense. Should the City point out the inadequacy of warning and protective measures, such action on the part of the City Engineer shall not relieve the CONTRACTOR from responsibility for public safety or abrogate his/her obligation to furnish and pay for these devices. If said devices will be placed or are caused to be placed by the City Engineer, the cost of placing such devices shall be the sole responsibility of the CONTRACTOR and shall be paid for the rate of $50/hour for labor and vehicle use, $20/day per barricade and any other costs incurred by the City relative to traffic control. Said costs shall be deducted from the total contract price for the work. Cooperation with concurrent constructions and operations The Contractor shall cooperate with other contractors and the City's personnel performing work in the vicinity, shall conduct its operations in a manner to prevent unnecessary delay or hindrance to their work, and shall coordinate its work with theirs to permit proper and timely completion of all projects in the area. Coordination with affected businesses and residents The Contractor shall respond to any complaints received from a property owner (business or resident) and contact the complainant within one (1) working day. The complaint shall be resolved within two (2) working days from the date on which it was received. V -A-3 Agreement No. 5944 The Contractor shall adjust its schedule in order to allow affected Businesses to operate as regularly scheduled. 3-0 TRASH PICKUP, STREET SWEEPING, AND MAIL DELIVERIES The Contractor shall coordinate with the City waste hauler and the City street sweeper to avoid construction conflicts on days when trash will be collected or streets will be swept on the project streets. If applicable, the contractor must also coordinate with the US Post Office to ensure that mail will be delivered without interruption. The notification to the US Post Office shall be submitted to the City for approval before the notice is sent out. 4-0 STORM DRAIN PROTECTION Nearby catch basin and storm drain openings must be protected with felt and sand bags to ensure there will be no spillage into the City storm drain systems. 5-0 EXCAVATION 5-1 Potholing Prior to Excavation If necessary, potholing of existing utilities should take place at least two weeks prior to the start of any excavation to allow adequate time for the necessary protection, removal and rearrangement of utilities by either the utility owner or the Contractor, as applicable. For work to be performed by a utility owner, the construction schedule shall allow for the time period required by the utility owner for such work. The Contractor shall notify the Engineer in writing of any subsequent changes in the construction schedule which will affect the time available for protection, removal, or rearrangement of utilities, and shall obtain the Engineer's approval of such changes. Backfilling, proper compaction and temporary asphalt replacement shall occur after potholing until full excavation can occur. No additional compensation will be allowed for modifications to trench shoring caused by utility service connections whether or not the utility services are shown on the Plans. 5-2 Grading, excavation and preparation of subgrade shall be done in accordance with, and shall include, all work specified in subsection 300-2, "Unclassified Excavation," and 301-1, "Subgrade Preparation," of the SPPWC, except as modified and supplemented herein. This item shall include all labor, equipment tools, materials and services required to complete all site and subgrade preparation and earthwork public right-of- way reconstruction areas, per City Standards. When a street excavation is made, the existing pavement must be sawcut and removed to clean straight lines, free of irregularities, to a depth sufficient to permit pavement removal without damage to pavement left in place. If a longitudinal pavement joint or edge of pavement is located within three (3) feet of the limit of the excavation, the V -A-4 Agreement No. 5944 Contractor shall remove intervening pavement and replace it after backfilling the trench. Sawcuts shall be either parallel to or perpendicular to the existing curb face. Material excavated in the roadway and not needed for backfill shall be immediately removed and disposed of by the Contractor. Surplus materials shall be properly stored according to Best Management Practices. No surplus materials shall be placed on private property. Changed conditions found during excavation shall be immediately brought to the Inspector's attention and the details of the change recorded by both the Contractor and the Inspector before formwork installation. See also Section H-3-4 and Section IV -4-0. 6-0 REMOVAL OF EXISTING ASPHALT, DUST CONTROL Asphalt concrete demolition and construction shall be per Standard Plans for Public Works Construction, current ADA standards, and City of El Segundo Standards. The Contractor shall inspect all locations called out in the project specifications to determine the extent of the removals needed. Existing asphalt concrete that is broken into pieces to be discarded shall be removed from the project site and properly disposed of the same day. The Contractor shall take care that areas shall be sufficiently watered down during demolition as well as construction for dust control. Complaints from the public regarding dust shall be met by the Contractor with an increase in dust control prevention practices. If necessary, sites shall be swept daily to remove debris. All removed materials shall become the property of the Contractor and shall be legally disposed of by the Contractor's representatives away from the site of work. (Note: there are no authorized dump facilities within the City of El Segundo) Spillage resulting from material hauling operations along or across any public traveled way shall be removed immediately by the Contractor at no expense to the City. 7-0 REPLACEMENT OF DAMAGE TO EXISTING FACILITIES The Contractor shall take care to protect -in-place City and private property not within the scope of this project from any damage. If damaged during demolition or construction, City property and private property shall be replaced in type and kind or better. The Contractor shall guarantee to remedy any defects in the repaired areas within a period of one year from the date of final acceptance of the work unless a longer period is specified. The City staff will give notice of observed defects with reasonable promptness. 7-1 Tie -Out & Re-establish Survev Monuments and Benchmarks In accordance with Section 8771 of the Business and Professional Code, the Contractor will hire a licensed land surveyor to tie out centerline ties, benchmarks, and other V -A-5 Agreement No. 5944 monuments affected by the project prior to commencement of construction. The land surveyor shall file corner records with the City Engineer; and re- establish any such monuments or benchmarks previously damaged or destroyed in the construction area and file corner records with the City of El Segundo Public Works Department after replacement. 8-0. TREE ISSUES For the purposes of this project, a tree stump is defined as the remaining portion of the tree trunk after a tree trunk has been cut and the majority of the felled tree removed. For the purposes of this project, a tree root is defined as the portion of a tree that grows out of a tree trunk and can continue to grow above ground and/or underground, providing the tree with nourishment and support. Tree roots can be any length or diameter. After a tree has been cut down, tree roots continue to extend from the stump. All existing facilities within the scope of this project, if affected by a live tree or tree root uplift, shall be scheduled for demolition and removal before all other areas. Asphalt pavement significantly damaged by tree roots shall be repaired prior to final paving. The Contractor shall coordinate with City staff for Recreation and Parks Department to assess, after removal, if tree root barrier installation or full tree removal is necessary. The Contractor may move on to a construction on a different portion of the project in the interim. The Contractor shall be responsible for removing any remaining tree stump and roots in the parkway, or tree roots in the pavement, as applicable to the project. Any removal necessary for the construction of concrete or asphalt improvements shall be completed before the replacement of the concrete or asphalt. At locations where tree roots are encountered, the Contractor shall cut out tree roots to the full length and width of the new work a minimum of two (2) feet below finish grade. Where tree roots have damaged and uplifted the asphalt to be replaced per these specifications, the contractor shall sawcut beyond the damaged area by a minimum of 6 (six) inches in all applicable directions. Sawcuts shall be parallel or perpendicular to existing curb face. Contractor shall cut all interfering tree roots, and remove and repair the portions of damaged asphalt within the sawcut area. 9-0. TRAFFIC CONTROL Traffic control shall conform in accordance to the latest editions of the Work Area Traffic Control Handbook, the Caltrans' Manual of Traffic Control in Construction and Maintenance Zones, and the standards contained in the "Manual of Uniform Traffic Control Devices (MUTCD)" and the stipulations set forth in this article. Contractors shall maintain one lane of traffic in each direction at all times unless otherwise approved by City staff. V -A-6 Agreement No. 5944 The Contractor shall provide and maintain all signs, barricades, flashers, delineators and other necessary facilities for the protection of the motoring public within the limits of the construction area. The Contractor shall also post proper signs to notify the public regarding detours and conditions of the roadway, all in accordance with the provisions of the Vehicle Code and the current State of California Department of Transportation "Manual of Warning Signs, Lights, and Devices for Use in Performance of Work upon Highways." Portable delineators shall be spaced as necessary for the proper delineation of the traveled way. If the traffic cones or portable delineators are damaged, or are not in an upright position from any cause, said cones or portable delineators shall immediately be replaced or restored to their original location, in an upright position, by the Contractor. The Contractor shall furnish such flagmen as are necessary to give adequate warning to traffic or to the public of any dangerous conditions to be encountered. Flagmen, which on duty, are assigned to give warning to the public that the highway is under construction and of any dangerous conditions to be encountered as a result thereof, shall perform their duties and shall be provided with the necessary equipment in accordance with the current "Instructions to Flagmen" of the Department of Transportation. The equipment shall be furnished and kept clean and in good repair by the Contractor, at his expense. Should the Contractor appear to be neglectful or negligent in furnishing warning and protective measures as above provided, the Engineer may direct attention to the existence of a hazard, and the necessary warning and protective measures shall be furnished and installed by the Contractor, at his expense. Should the Engineer point out the inadequacy of warning and protective measures, such action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate his obligation to furnish and pay for these devices. The Contractor shall conduct his operations so as to provide reasonable access to the adjacent properties and have no greater length or quality of work under construction than he can properly prosecute with a minimum of inconvenience to the public and other contractors engaged on adjacent or related work. When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether empty or loaded, shall in all cases yield to public traffic. Uneven Surfaces Where asphalt or concrete removal has temporarily left potentially unsafe surface elevation differences in either the pedestrian or vehicle traveled way, the contractor shall safely ramp between or detour around the uneven surface areas until they can be permanently brought to the same grade. Warning signs and devices shall be placed at the proper distance in advance of and at the areas to alert the public to the uneven surfaces. V -A-7 Agreement No. 5944 10-0. ASPHALT REPAIRS - PAVEMENT REMOVAL AND REPLACEMENT Asphalt repair shall occur where directed by the City Public Works Inspector and shall join the surrounding existing asphalt to properly direct storm flow to the storm drain system. Asphalt not adjacent to existing curb or gutter and to be repaired shall be saw cut for removal with saw cuts perpendicular or parallel to the existing curb face. Asphalt slot paving, required for all asphalt next to newly poured concrete, shall be at minimum three feet wide. The new paving shall consist of 6 inches of 1/2 -inch- maximum State mix over a 6 -inch base. New asphalt shall be feathered to meet existing asphalt, and shall also meet new concrete at a reasonable height and slope to allow proper drainage. Asphalt shall be 6 inches thick and applied in two lifts over a minimum of 6 inches of crushed aggregate or crushed slag base. Where a series of cuts are made, regardless of the spacing between individual cuts, the series shall be treated as a continuous open trench and the pavement repair shall be continuous across all cuts. All asphalt concrete pavement shall conform to Section 203-6 of the Standard Specifications and as shown on the details in the plans. Asphalt concrete shall be 1/2 - inch -maximum State mix unless otherwise specified. Paving shall occur in lifts, after backfill with and compaction of appropriate materials has occurred. All backfilling and paving shall be to the City Inspector's approval. Paving rollers shall be on the job site before any paving is started. The final height of new paving next to new gutter shall not be more than 1/2 -inch high and shall be at minimum 5" high next to existing curb. The Contractor shall be responsible for bringing to the City's attention any additional asphalt required for proper drainage prior to any placement of new asphalt. If improper asphalt placement occurs detrimentally affecting drainage, the contractor shall remove and replace the asphalt at no further cost to the City. Base material for the reconstruction of the pavement shall be in accordance with Subsection 200-2.2 of the Standard Specifications. A tack coat of PG 64-10 paving asphalt shall be uniformly applied to the surface to be paved. The surface shall be free of water, foreign material, and dust when the tack coat is applied. 11-0. NPDES COMPLIANCE A. Contractor shall thoroughly clean dust and debris resulting from his operations to comply with the "Clean Water Act." Sweeping, wet vacuuming, and/or other approved measures of removing such debris shall be taken during the removal and construction operations. No dust or debris shall be deposited or discharged into the storm drain facilities. The Contractor shall provide and maintain at all times during construction ample means and devices to promptly remove and properly dispose of all water entering the excavations or other parts of the work. No concrete footing shall be laid in water, nor shall water be allowed to rise over them until the concrete or mortar has set at least eight (8) hours. Agreement No. 5944 Disposal of water shall be the sole responsibility of the Contractor. Disposal methods shall conform to the Porter -Cologne Water Quality Control Act of 1974, the Federal Water Pollution Control Act Amendments of 1972, and the California Administrative Code, Title 23, Chapter 3. Contractor shall not discharge or permit to be discharged to any street, channel, river, storm drain, or any appurtenances thereof, any non -rain water or other liquid substance from the project or from operations pertaining to the project site without first securing a valid National Pollutant Discharge Elimination System (NPDES) permit unless the discharge is specifically listed as exempt or conditionally exempt in the most current list issued by the Regional Water Quality Control Board, Los Angeles Region. Contractor shall implement all necessary Best Management Practices (BMPs) to ensure that any conditionally exempt discharge meets all current requirements of the Regional Water Quality Control Board and City. City may prohibit or restrict any discharge if, in its sole discretion, the discharge is polluting, unsafe, or causes a nuisance condition to be created. B. Contractor shall reduce the discharge of pollutants in storm water runoff to the maximum extent practicable by the effective implementation of appropriate BMPs. The following are the minimum requirements: 1. Sediments from areas disturbed by construction shall be retained on site and stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities, or adjacent properties via runoff, vehicle tracking, or wind. 2. Construction -related materials, wastes, spills, or residues shall be retained at the construction site to minimize transport from the work area to streets, drainage facilities or adjoining properties via vehicle tracking, runoff, or wind. 3. Non-stormwater runoff from equipment and vehicle washing shall be contained at project sites. 4. Erosion from slopes and channels shall be controlled by implementing an effective combination of BMPs, such as limiting grading scheduled during the wet season; inspecting graded areas during rain events; planting and maintenance of vegetation on slopes; and covering erosion susceptible slopes. C. The selection, submittal, and adherence to BMPs are the responsibility of the Contractor. The selected BMPs must be submitted to and approved by City prior to performing any operation under this contract which will disturb or expose soil, including, but not limited to: excavation, grading, demolition, clearing and grubbing, pavement removal, etc. D. Construction activity that results in soil disturbances of less than one acre is subject to the General Permit for Storm Water Discharges Associated with Construction Activity (General Permit) if the construction activity is part of a V -A-9 Agreement No. 5944 larger common plan of development that encompasses one or more acres of soil disturbance or if there is significant water quality impairment resulting from the activity. If it is determined that the entire site consists of one acre or greater, the Contractor must file a Notice of Intent (NOI) with the State to comply with the terms of the General Permit, and must provide proof of a Waste Discharge Identification (WDID) Number to the City prior to the issuance of a grading permit. The preparation, submittal and adherence to all NOIs, Storm Water Pollution Prevention Plans (SWPPPs), Wet Weather Erosion Control Plans (WWECPs), and Contractor Self -Inspection Forms are the responsibility of Contractor. D. The City may restrict the continuation of work if it is determined that the Contractor has not met all the NPDES requirements. 12-0. PAVING ACTIVITIES 12-1. Cold Milling In accordance with Section 302-5.2, cold milling from gutter or pavement edge to a depth of 2 inches is required, only on the portions shown on the street to be cold milled. The final cut shall result in a uniform surface conforming to the typical cross section. It is the Contractor responsibility to remove all the thermoplastic pavement markings prior to the cold milling operation. Asphalt to be discarded shall be removed from the project site and properly disposed of the same day. The Contractor shall take care that areas shall be sufficiently watered down during demolition as well as construction for dust control. Spillage resulting from material hauling operations along or across any public traveled way shall be removed immediately by the Contractor at no expense to the City. After cold planing, the Contractor is required at all transverse joints, manholes, and all asphalt areas of uneven elevations caused by the cold milling to immediately taper three (3') feet from the edges with cold mix asphalt concrete until the areas can be permanently filled with hot mix. Temporary ramping, where required by the inspector or City staff for traffic control or other purposes, shall be considered included in the price bid for "Mobilization and Traffic Control", and no additional compensation will be allowed. Asphalt shall be installed the same week that cold milling occurs on the same street, unless there is a rain delay. The contractor shall ensure that a second asphalt company can provide the asphalt materials should there be any reason the primary supplier cannot deliver the materials. If the contractor cannot guarantee that asphalt paving will occur on a street within the required time frame, no cold milling will be allowed to take place on that street until it can be scheduled as described. City streets are not to be left unpaved for more than three working days. V -A-10 Agreement No. 5944 Contractor shall be required to provide documentation that the asphalt material collected from the grinding process is recycled and diverted from the landfill. This documentation maybe in the form of weight slips from a known recycling facility or a verifiable letter from the end-user. Any documentation submitted must contain accurate quantities in either tons or cubic yards. Failure to provide such documentation may be grounds to withhold final payment. Contractor's attention is directed to the condition that if the presence of pavement fabric, petromat, rubberized material or steel reinforcement within the depth to be cold - milled is encountered, Contractor shall inform the inspector or City staff immediately. Pavement fabric, petromat, rubberized material, or steel reinforcement shall be completely removed and disposed of appropriately. At all locations where an overlay pavement is joining or overlaying existing asphalt pavement, the Contractor shall cold mill existing pavement to provide straight neat lines and feather the new pavement to form a smooth transition with the existing pavement. This condition is particularly required as locations where the project joins the existing pavement. The Contractor will also be required to match the existing pavement elevations. The final cap transition between the streets must be smooth and neat in appearance, including the radius points. The Contractor shall thoroughly inspect the work site in advance of the cold milling operations to minimize the risk of striking any metal roadway improvements such as sewer, communications, storm drain manhole covers, water and gas valve covers since these utilities were not marked on plans provided in these specifications. Care shall be exercised not to damage adjacent concrete curbs or gutters. Curb or gutter damaged due to cold milling work shall be replaced as approved by the inspector or City staff at the Contractor's expense. The contractor shall restore any existing area drainage when replacing curb. Residue from grinding shall not be permitted to flow or travel into gutters, onto adjacent street surfaces or parkways. All residues shall be completely removed by street and manual sweeping and properly disposed. No washing of residue into drainage structures will be allowed. All catch basins and curb inlets shall be covered, utilizing the best management practice (BMP) which most appropriately fits the situation, and as approved by the City Engineer. The Contractor shall also make every effort to control all dust created by his operations by utilizing the Best Management Practice approved by the State Water Resource Control Board. 12-2. ASPHALT CONCRETE OVERLAY Work to be performed under this item shall conform to Section 300 of the Standard Specifications and these Special Provisions. Asphalt concrete hot mix, C2 -PG 64-10, shall conform to applicable Subsection 203 of the provisions of Section 200 of the Standard Specification and these Special Provisions. The viscosity grade of paving asphalt shall be PG 64-10. Tack coat shall be PG 64-10. V -A-11 Agreement No. 5944 This work shall consist of furnishing, spreading and compacting a minimum 2" thick asphalt concrete pavement surface course. This work shall also consists of applying paint binder (tack coat) to the existing pavement surface and vertical surfaces to be joined. Joining existing pavement shall be done to the satisfaction of the City Inspector. The finished edge of the new pavement at gutter plate shall be no less than 1/4" and no greater than 3/8" above the existing gutter plate. Where new paving joins existing paving, Contractor shall grind down the existing surfaces twelve (12) inches back from the joint line so there will be sufficient depth to provide a minimum of one (1) inch of asphalt concrete. Join line shall be straight and edges vertical. Contractor shall be responsible for verification of grades prior to installation of asphalt hot mix paving. Contractor shall guarantee positive drainage in all areas. All areas which retain standing water will be corrected as directed and approved by the City at no expense to the City. All properly established sheet flow & flow line slopes and grades shall remain the same after paving as before unless an existing ponding problem is noticed and brought to the inspector or City staff s attention prior to cold milling. After paving has been installed and compacted, Contractor shall spray water over the entire paved area and correct any areas where water collects and does not drain away. The contractor will ensure that the asphalt is ready before allowing traffic through newly paved areas. Subsection 203-6 of the Standard Specifications is supplemented by the following: Asphalt concrete proposed for use on the project, when tested in accordance with Test Method California No. 360 (Method A), shall show a surface abrasion loss not exceeding 15 grams. Subsection 302-5.5, "Distribution and Spreading," of the Standard Specifications is supplemented and amended by the following: Spreading: With approval of the Engineer, the Contractor may be allowed to deposit the asphalt concrete material from bottom dump trucks into a uniformly sized window to pick up the material and convey it into the paving machine by an elevating device (CoCal, Clark Co., or equal). Such paving procedures will be limited to long straight runs. Turn pockets, side street intersections, etc., shall be paved by depositing asphalt concrete material from delivery trucks directly into the paving machine hopper. If approval for the bottom dump operations is given, the Contractor shall furnish a rubber tire skip loader for distribution of any misplaced material. Mechanical Spreading Machine: The spreading machine described in Paragraph 6 shall be a crawler equipped (track laying) type, self-propelled spreading machine except on steep grades or on areas of unstable subgrade. It must be 17 feet wide. V -A-12 Agreement No. 5944 A fully automatic screed will be required for this project. The fully automatic creed shall be a sled, 30 feet in length, on the side of the machine that will receive the next mat of material. A joint maker, ski, etc., placed on the side of the machine to ride on the existing or previously constructed surface or mat of asphalt concrete material may be required by the Engineer or his designee. Rolling operations shall comply with Section 302-5.6. If areas adjacent to speed bumps, dips, and cross gutters or any other asphalt surface are significantly changed after paving so as to impede or otherwise negatively affect driving conditions, those areas shall be corrected by the contractor at no additional cost to the City. Methods of correcting these areas shall be approved by the City Public Works Department prior to their implementation. Contractor shall provide the Public Works Department with a complete set of asphalt tickets for each day of paving. 12-3. MANHOLE, VAULT COVER, AND VALVE COVER ADJUSTMENT Contractor shall complete all City -owned manhole, vault cover, and valve cover frame and cover set adjustments to the new finished grades in accordance with Section 301- 1.6 of the Standard Specifications. Buried manholes, vault covers, and valve covers shall be located with metal detectors prior to grinding, and the appropriate agencies informed by the Contractor's superintendent. The Contractor shall coordinate with all applicable utility companies prior to grinding and paving activities for the possibility of adjusting manhole, vault, and valve covers during paving activities. The remaining utility companies shall be notified of the Contractor's schedule by the Contractor's superintendent in order to allow for raising of their manhole covers, vault covers, and valve covers immediately after paving is completed. The Contractor shall coordinate with the West Basin Municipal Water District (WBMWD) regarding their utility adjustments, prior to beginning any work. Their contact is: Sergio Nunez — Operations Technician sergion@westbasin.org Office: 310-660-6261 Cell: 424-531-5578 12-3.1 Adjust Manhole to Grade In areas where the existing pavement is to be capped with an asphalt overlay, and where the manhole structure meets the following criteria: • The manholes are either flush with the existing pavement, or V -A-13 Agreement No. 5944 • The manholes project less than two inches above the A.C. surface prior to capping. These manholes shall be paved over and later adjusted to grade as specified herein. Before replacing frames and covers, the Contractor shall clean the frames and covers of residual debris from new and old pavement or surface treatments. Asphalt concrete used for paving around manhole shall be Type C2 -PG 64-10 (1/2" sieve size) with 5.6 percent binder. The Contractor shall be responsible for furnishing, placing, and maintaining barricades or other traffic control as necessary to protect the public from any danger due to the work being done. 12-3.2 Adjust County Sanitation District Manhole Covers to Grade When applicable that County Sanitation Districts (CSD) manhole covers must be adjusted to new grade because of re -grading and/or resurfacing over the manholes, the work will be done by CSD in conjunction with the Contractor responsible for the re- grading and/or resurfacing work pursuant to the following procedures: 1) The Contractor shall notify CSD's superintendent of Maintenance at (3 10) 638-1161 a minimum of three (3) working days prior to the start of any work involving CSD manhole covers. 2) If grade over manhole cover is to be lowered: a. The Contractor shall furnish and deliver a temporary steel plate of adequate thickness and size approved by CSD for the manhole. b. The Contractor shall excavate around the manhole to a depth and distance outside of the manhole as required for CSD to remove the manhole frame and cover. c. CSD will remove the manhole frame and cover and the interfering portion of the manhole shaft and place the cover plate over the manhole. d. The Contractor shall store and protect the frame and cover and fill and/or pave over the cover plate to final grade. e. The Contractor shall remove the pavement and/or fill as required for CSD to raise the manhole cover to final grade. Pavement and/or fill shall be removed to a minimum depth of not less than 6 inches below final grade and 12 inches around the manhole if the cover plate is more than 6 inches below final grade. f. CSD will raise the manhole cover and set the frame and cover to final grade. g. The Contractor shall backfill and compact and complete the pavement around the manhole cover. 3) If grade over manhole cover is to be raised: a. The Contractor shall fill and/or pave directly over the manhole frame and cover to final grade. b. Repeat steps e. through g. of Item 2 above except when grade is to be raised more than 2 feet. In such case, the Contractor shall excavate around the V -A-14 Agreement No. 5944 manhole to a depth and distance as determined by and required by CSD to remove and reconstruct the manhole shaft with the required taper. The Contractor shall be responsible for furnishing, placing, and maintaining barricades and lights, and installing temporary asphalt ramping as necessary to protect the public from danger due to the work being performed. 12-3.3 Adjust Water Valve Cover to Grade This item shall specifically include adjusting of water valve cover to the grade after completion of the overlay or reconstruction, in accordance with Subsection 301-1.6 "Adjustments of the Manhole Frame and Cover Sets to Grade," and 302-5.8, "Manholes (and other Structures)," of the SSPWC, except as modified supplemented herein. • The term "Valve Cover" shall be interpreted as including the sleeve, frame and cover set for City water valves. • City -owned valve covers shall be adjusted to grade in a similar manner to manholes. • After the pavement has been completed, the necessary portions of the pavement and base shall be neatly removed, and the valve cover shall be adjusted to the new finished grade as specified in Subsection 302-5.8 of the SSPWC. 12-4. STRIPING AND MARKINGS, PAVEMENT MARKERS Any striping and pavement markers removed or damaged or to be re-striped/touched- up during construction shall be replaced in kind or better. The Contractor prior to start of work shall make an accurate inventory of existing lane striping, crosswalks and pavement markings, including blue fire hydrant markers. Replacement striping shall be thermoplastic. Existing striping that does not fit MUTCD standards could be aerial survey or city boundary markers, and shall be brought to the Inspector's attention prior to any removal. 12-4.1 Temporary Striping Contractor shall place temporary striping after the base course of asphalt pavement has been completed, in the same configuration as the existing permanent striping so that traffic can be returned to normal patterns. This striping shall be considered temporary and is the Contractor's responsibility to place and maintain. Contractor shall place temporary dribble lines within 24 hours after paving, and place permanent striping between five (5) and seven (7) calendar days after paving. 12-4.2 Permanent Striping V -A-15 Agreement No. 5944 At the preconstruction conference, the Contractor shall submit to the City an inventory of existing striping, pavement markings, and reflectorized and raised pavement markers in the project area. Upon approval of the inventory, the Contractor shall reinstall striping, pavement markings, and reflectorized pavement markers in accordance with the approved plan. Any striping and pavement markers removed or damaged during construction shall be replaced in kind or better. Contractor shall use thermoplastic for the re -installation of all project striping and pavement markings. Application of Thermoplastic, Thermoplastic Pavement Markings, words, arrows, crosswalks and limit lines, shall be in accordance with Caltrans Standard Plan Nos. A24A through A24E, unless otherwise noted. Contractor shall install traffic striping, markings, arrows, messages and raised pavement markers, etc. to match pre-existing markings and markers unless directed otherwise in this section of the bid documents. The Contractor shall remove all thermoplastic markings and raised pavement marking before street work. All work and materials shall conform to the requirements of the Caltrans Standard Specifications, latest Edition, and the latest edition of the Caltrans Traffic Manual. Contractor shall furnish and install traffic delineation and markings using paint "Cat Tracking", temporary marking tape, removable reflective tabs, or other approved media on the same working day as existing stripes and legends are lost, including but not limited to bicycle lanes, stop bars, lane lines, to match pre-existing markings. The Contractor is required to complete permanent traffic striping within five (5) working days after final paving has been completed. Reflective tabs should be completely removed and properly discarded once striping has been installed. Markings, such as stop bars and legends, speed limit markings, and symbols that are partially covered or obliterated shall be installed with thermoplastic in their entirety in conformance with Caltrans Specifications. These markings shall be brought to the Public Works Inspector's attention prior to re -installation. Markings and striping on adjacent streets that may need to be touched up after paving; for example, crosswalks that are partially in the paving area, shall be brought to the Public Works Inspector's attention before the striping crew is demobilized. 12-5. SIX-INCH DEEP ASPHALT REPAIRS Asphalt to be repaired shall be saw cut for removal, with sawcut boundaries either parallel or perpendicular to the curb face or property line. Where a series of cuts are made, regardless of the spacing between individual cuts, the series shall be treated as a continuous open trench and the pavement repair shall be continuous across all cuts. Pavement repair shall consist of 6 inches of 1/2 -inch -maximum State mix over a minimum 6 -inch crushed aggregate base. C2 PG 64-10 asphalt and tack coat shall be used. New asphalt shall be feathered to meet existing asphalt, and shall also meet any applicable concrete at a reasonable height and slope to allow proper drainage. V -A-16 Agreement No. 5944 All asphalt concrete pavement shall conform to Section 203-6 of the Standard Specifications and as shown on the details in the plans. Paving shall occur after backfill with and compaction of appropriate materials has occurred to the approval of the City Public Works Inspector. Paving rollers shall be on the job site before any paving is started. The final height of the paving next to new gutter shall not be more than 1/2 -inch high. The Contractor shall be responsible for bringing to the City's attention any additional asphalt required for proper drainage prior to placement of new asphalt. If improper asphalt placement occurs, detrimentally affecting drainage, the contractor shall remove and replace the asphalt at no further cost to the City. Base material for the reconstruction of the pavement shall be in accordance with Subsection 200-2.2 of the Standard Specifications. A tack coat of PG 64-10 paving asphalt shall be uniformly applied to the surface to be paved. The surface shall be free of water, foreign material, and dust when the tack coat is applied. V -A-17 Agreement No. 5944 SECTION VI — APPENDICES 1. City Map 2. Typical No Parking Sign— El Segundo Standard ST -18 3. Imperial Avenue Centerline Tie Information 4. Pine Avenue Centerline Tie Information 5. Project Streets 6. Striping Quantities V -A-18 Agreement No. 5944 APPENDICES 1. City Map 2. Typical No Parking Sign — El Segundo Standard ST -18 3. Imperial Avenue Centerline Tie Information 4. Pine Avenue Centerline Tie Information 5. Project Streets 6. Base Bid Striping Quantities 7. Alternative Striping Quantities Agreement No. 5944 APPENDIX I City Map 3M1V SISI SCC CC .-- aw�,aenl'� �CI���C� 1. � .,..,,.r,,, „f " C 1f9�N �5 Aa�,rlC C w (C� CC SVSNW C CCC-�aU C----� 1D93tl� is CPan LJLaD �If MOV9118 -S MF=l F— [=E!n EF LO I ILIE I z I i - .1 1— -1 L --=j L j UO EE`C " LL� � � CL_ 11 ��I lti a4] 9aN ]COC19F9UM19 HHO I Pll� N, Cit CI _J CsnofoDi�r"� I U) z 0 Agreement No. 5944 APPENDIX 2 Typical No Parking Sign — El Segundo Standard ST- Agreement No. 5944 L. w w w lowsr'M RP Im COLOR LEGEND SIGN SHA -LL BE LIGHT REFLECTIVE AND BE MM RED MADE OF WATER RESISTANT STIFF CARDBOARD WHITE OR OTHER STIFF DURABLE MATERIAL. DESIGN BY: P.B. CITY OF EL SEGUNDO, CALIFORNIA APPROVED BY: DATE: 11 - 7.89 ENGINEERING DIVISION f3T- J � e� a^. a 1 1!-1¢-8q DRAWN BY: Y. B. TYPICAL City Engineer: R.E. 2Ci 8 0 9 Date STANDARD DRAWING NO. DATE: 11. 13. 89 TEMPORARY NO PARKING SIGN TEMPORAF!, Agreement No. 5944 L. w w w lowsr'M RP Im COLOR LEGEND SIGN SHA -LL BE LIGHT REFLECTIVE AND BE MM RED MADE OF WATER RESISTANT STIFF CARDBOARD WHITE OR OTHER STIFF DURABLE MATERIAL. DESIGN BY: P.B. CITY OF EL SEGUNDO, CALIFORNIA APPROVED BY: DATE: 11 - 7.89 ENGINEERING DIVISION f3T- J � e� a^. a 1 1!-1¢-8q DRAWN BY: Y. B. TYPICAL City Engineer: R.E. 2Ci 8 0 9 Date STANDARD DRAWING NO. DATE: 11. 13. 89 TEMPORARY NO PARKING SIGN Agreement No. 5944 APPENDIX 3 Imperial Avenue Centerline Tie Locations Agreement No. 5944 MFOUND SPIKE, NO TAG, NO 77N PER TR -15892 MAP BOOK, 418 PAGES 45 THROUGH 48, DOWN 0.3, LEFT AS FOUND. SET LEAD, TACK, & TAG STAMPED "LS 9106 77E" FLUSH IN TOP OF CURB. F31 FOUND CHISELED "X" IN TOP OF CURB PER EL SEGUNDO CITY FIELD BOOK 8-19. RFOUND SPIKE IN TOP OF CURB PER EL SEGUNDO Cl TY FIELD BOOK 8-19. D-) CURB ~` .� / CURB / IMPERIAL A VENUE N89 58'50"W 934.29' ~ �— TO SHELDON STREET r CURB SCALE: 1 "=20' CITY OF FL SEGUNDO PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION CENTERLINE TIES DATE: 8/6/2019 SCALE: 1"=20' PREPARED BY: CHARLES J. MOORE L. S. 9106 CURB -1 SHEET NO: k�, VL X U co CITY OF FL SEGUNDO PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION CENTERLINE TIES DATE: 8/6/2019 SCALE: 1"=20' PREPARED BY: CHARLES J. MOORE L. S. 9106 CURB -1 SHEET NO: PWFB 0 816 Document Number Agency index REFERENCES R-1 = LOS ANGELES CO. SUR. F.B. 2008:57 NOTE: A FIELD SEARCH WAS PERFORMED FOR ALL RECORD TIE POINTS SHOWN ON R-1, NONE FOUND. ALLEY IMPERIAL HIGHWAY WIT Uj z Uj C.) r Agreement No. 59B-24 ALLEY N.T.S. MONUMENT NOTES FID PUNCHED SPIKE DOWN 0.15, POSSIBLE POSITION OF S & T PER R-1, UNABLE TO VERIFY CENTERLINE POSITION BY RECORD TIES, BEFORE CONSTRUCTION. FD NOTHING AFTER CONSTRUCTION, SET GEAR SPIKE & WASHER STAMPED *LS 5411" FLUSH PER TIES HEREON. 0 SET LEAD, TACK & TAG "LS 5411* IN T.C. T14E PIUMM OF THIS RECORD IS TO DOCS MENT THE PERI)ETUAY)ON OF FOUND MONUMENT(S) PURSUANT TO THE PLS ACT SEMON 8771. NO CLAIM IS MADE REGARDING T14E CORKCTNESS OF THE POSITION(S) OF SAID MONUMO%S), NOR THE DIMENSIONAL RELA71ONSHIP 70 STREET CENTlERLINES OR PROPERTY' BOUNDARIES. 19 -HM -679 BPELSG-2016 Page 2 of 2 Agreement No. 5944 PWFB 0816 607 Index CORNER REORD Agee Document Number City of EL SEGUNDO County of LOS ANGELES : CaNtortria Brief Leges Description CENTER STREET & ALLEY: 160'1 STY OF IMPERIAL HIGHWAY CORNER TYPE COORDINATES (Optional) i N. E. (' ❑ Government Comer Control Elevation [ Meander [ Property Units Metric [ U.S. Sunray Foam I [ Rancho [ other Horizontal Datum I zone Epoch Date VIA Date of Survey 6./1$%19 & 7/3 19 vertical Datum []Complies with Public Resources Code §6#3801-W19 [Complies with Public Resources Coda 6§13890.8902 PLS Ari Ret [ 8765(d) 08771 [ 8778 [ other: Comer/' 0 Left as found [ Established [ Rebuilt Pre -Construction Monument [ Pound and tagged Reestablished [ Referenced Post -Construction Narrative of corner identified and monument as €ound, set, reset, replaced, or removed: 11 See sheet #2 for description (a): SURVEYOR'S STATEMENT This Comer Reoo prepared by me or tinder my direction in conformance wilt► the Prof Surveyors'Act on 919 ..�,. No. 5411 •cp. 9/30/20 P.L.S.�N4:t'�: No, 5411 "�+ r COUNTY SURV YOfrS STATEMENT i4s-1-4/caner Record was received � � +��� NOV 0 8 2019C,:—*:�COTRYAN and exatnin and. Signed, L S, R.C.E. No, o Titka� County Surveyor's Comment ...... f3PELSG 20116 Page i of 2 a Agreement No. 5944 h'N a I Iml ' ..., I J A ... w—., „rr...�.,.. h«..-r ...., w �n .�,,,..-w� '� n,,,u• ,. �,ir,mm �,.r„,rm-.r............. i _....., w.w a.,m, a a.a..e.,w. .r ......e ,.«...... �.. .... ...., I I I I �....... .... ... ......wcuw..,,, �h fl�q ulll�i I I ', i VI V� 1 II �. Ml .n j ” M r '' T 'ry'�'a^ �: „� ,��w� a � �,x�dl�^m'n"�rywn• ^d �V�" i�Imwm�Nmm I'm , anBw ', °W"b I � � p' v errm�rv'I I, ^u Vm+ Iwl .'����Y ���I�,�,�.,, ��^�_,,,,� we ��,�« wYun�B"� ��n m. Agreement No. 5944 APPENDIX 4 Pine Avenue Centerline Tie Locations Agreement No. 54718.6 �I . I I,. II �, .u, "II 11 , ,,ma..... . , I , h 4.r ,ok Aa II " hj V 4 is � � " ", �,., .,� S A•�� � � � I V '�„�, I �'' I X • � 7 / 1 ”"'.� v H' v 1 JNIoII�.IInIII NI III II dtlII NY,�,I�uIn1 �I �ryII MI III�l�"Ir6'IIIIIWVrIyWII�il �IMiP�, VI�Wr�M�WWM1�'�WV�� �11Wn,1� pl "i�VII�Ip�IIG��WIgV� �X d IVYW"101 P" I I III v VIII I r p 6 kill mJ til�I�lutliNiRWVI'IiV luL, IV wl IWJIY�V��I%iw�l^'�W�illjNlu�l'u > II wV VV 4 iI� Il�yi 1^�Id� I N I I lv y ' I rl rry�Illl �lyl q^IU^01 VlPtlll IVI IIN°d IIYI pJN W, � I Vld � p a II INIV 11 � V I Ir ', I I p;1 II I°u ad I "IIII u„I WIC p �I .' , ' I ,r, L' I N,Ir,,INYXI yr I lyl' I I v III II rl!wll JIB' W II X�p,V� I iIUVIIuYII""YI^� `�'I "NIIV��u� VgI�;IgVIf�I�u °Ilu �I��II NI'11"Vl J'I Wllknll flu v V Iln N II Glpµ u � I r mpI mll IN,,�I,IIu,.I h I', I I ,I " ,; I �,.! M .ti„u1111'„I,dll V lu"7t ,JII�, /uIII��IrAtlryl(IYhVI w.,.,II"ra, aV” ,Ir V „IIIJI'I �+° ., N,li,„III v 1�o ,,I�, �I,,,�J I!I,o it I, 4q ,�I�, II 7., ov11l 41 I II,ip �l l�l,ulll ill ilf.ulP�,G I,ra���r MI 11,4WrV WVlll y,. I ,, NVl I"nl�l4 V WIY. I I.. I �„�� a :I,", 1 � I ��.�., IIv �, 'I ' I Y � I � N,u Y I Iu Ids' �"'� � v�u� L,,'V e I' 1 ulv a tilI' „til,"II �, ,,, ell, �tlP . � w u „ ,"�� � � I .. I. I� �, � �I � � I � a,l��� � 01 W� I �. YI� � . u" � V?I p n111111 Iv�Yu.���.,�.IIV 9 0 0 I Agreement No.' - 18.6 44 CO ENG FB 3658-44 SURVEY OF S'/, A PG.9GE Fr 13 NO 1190- C AG SURVEY -BY SO. 1614y-r-AIG72 TRACT NO. 70023 (5 Ll -,3 ,F6Z�" DATE M� lee Ala 7OA/4z-O e, Oc,44.)-lv ecff A665b D. O. Ik Vl*E .11C, -J. 1.1C, VIAI& . ................ .......... ............ 4/0 7- e 44e -L 4eA90 f-l;r4CA-' 7'/-0.9 *r'fr AVIr4141 7AC, IFCS /665 645 ' AMO AZF -PVOWV 7,V41Y 4w A Agreement No. 5944 CORNERRECORD Document r'kirnber City of EL SL OUnty of _Z , "Ll' (' "r S 6, California Brief Legal Description CORNER TYPE. N. COORDINATES (Optional) Govt Corner Control E. Meander Property ❑Zone . . ......... NAD27 0 NAD80 NAD83 Epoch Rancho Other Elev. Date of Survey Vert. Datum: NGVD29 0 NAVD88 D Meas. Units: Metric 0 Imperial 0 Corner - Left as found [11 Found and tagged 0 Established F1 Reestablished M Rebuilt E1 identification and type of corner fOUnd: Evidence used to identify or procedure Used to establish or reestablish the corner: A description of the physical condition of the nionurnent as fOLind and as set or reset: 4,w.. . . . ...... This Corner Recordwas prepared by me or Linder my direction in conformance with the Land Survey, s' t on --- 2 Signed—,Z//XL,' /"'P�r7S.A r R. C, E . No. 77 COUNTY SURVEYOR'S STATEMENT This Corner Record was received and examined and filed Signed , .. ... . ... . Title 82.0029 DrN flev. I U00 �Aorpeh�- 129 f P.L.S. or R.C.E. No, Fri z ' J2 LQ6 m M, m Document Number A.gFeernent No -.-5944 FT m —i M I J) I zr.0 71 7 Tl Lr, 0 z C' �TJ W'F: 0 FFI 21 M -,- -)I 0 f1— I ", F m m z aD F- C'] f. J M 71 uj z 9t B ID > C-' FT m —i M I J) I I, 0 z u 0 a. 2 0 u w u rrw L-ZU.,t Agreement No. 5944 5 IUR V EY C-) F S IP A G IE . ...... TRAIC.,"T NC..),- ................. r,) Al, E 0 M 0 z C z ........... w 0 ET L,u r D), D' cu �zb F"IcIr, �7 Agreement No. 5944 SURVEY OF GEW7sjZ4. g T (E-5 F B NO100_C PAGE E3 SURVEY aySWT;4-MY eNGAE CQKf- TRACT NO. SS23 ( EGUND�) DATE._L2 - 07 — 61 J , N, L. MAiZT4 Nez ENGINGGR: (2c7NIs LD 3, McALPIN, R.GE~ j6CaSS p, iZVINE5 s.W. COZ. LOT 45--S5T LO TkGGGU R.C.5. sr -655 i/ ops � PRO6.) w'Ly. of GuAPo Posr Ln N ,SET SPK. � T. TAGGED KCS IGG55 NISID s542 E. nr^. 10.73 �.w j 1t. 46 r SET 5Pv,4T. swq, � SET SPK. T. TAGGED Z.C. .16�5�— AG6ED ZCE: IGGS ' �0 W 0 LLIV t� LU i�-T3� NOT TO SCALE �?- ' N.V1.81at RY.� LOT i7 TR. 3IDO23 { �WE NUE 0- FD C. NAIL IN LIEU OF SW + T FITS TIES 6-14-02 o ui J (.0 J FD O Q 6-14-02 z '26 X1.9 DI .01 _PINE S. W. & T. GONE 6-14-02 �4 LAND SCi �C Exp. 12-31-04 e\ L No. 5846 AN U-1 CENTERLINE TIES AT SURVEY OF PINE AND ALLEY W/O MARYLAND SURVEY BY P WEILBACHER DATE 06-14-02 Ag C` i 4 L-21.5 NTS FD 6-14-02 Z't,o� AVENUE _y N89'53'42"E 174.94' TO ?2,03, MARYLAND ST. - - ( 6I4O2 2741, FD 6-14-02 • SET L & T LS 5846 6-14-02 NOTE: ALL LEAD & TACK TIES SET WITH TAG RCE 16655 AND ARE SHOWN THUS ■ mill SUBJECT RESETTING CENTERLINE TIES PRIOR TO CONSTRUCTION 0 Agreement No. Lr 2 1.5 CO ENG FB 3658-45C SURVEY OF CE.c/T--'%IVE 7 -/,CS F B NO '2 PAGE -36'-Z SURVEY BY �'�• 6!, ✓ E.vl'--/NEE.P/n/G TRACT NOs"'n?R(EG SEGC/.t/0,)7 DATE --Z1- 7-,'l SBE -✓oB No. K- /026-¢ EN6//+'EER . k A14417 B. M'AGP/N ZGE /6655 Q EASOGo I L. �l�1ART/NEZ N h h z r c{�\,I UW O V U) z 4 0 \ No PTS 11 < m W o W � bl < F O F } < W F W \ N89`5342 �E i �¢ X720 Ir a i ,% ¢� MAF?YLAMO Sr 4 H _............. ..W _.._.. ......._._....__. ....... ..0 U.PE..-�.. .,.._ SWT",•,._ _ __ __�____._....___�__.� __... _ C N j u' No TE : ,41-L Z.,5,4,0 IFTAC, -TIES J'E T `v/Ty TAG RGE /66SS 41vv AR.157 S,yowN TyUs a I 0 z Y U 0 t- in N cna w W i Q F C } z a IL f 0 U w U_ w ul N K } W N f Agreement Nol94,2 1.5 n SURVEY OF CENTERLINE~ -CIES F B NO100-C PAGE "Q SURVEY BYSDEiTU BAY ENCJNGERING CORP TRACT Nn 390'L.3 (EL SEGQNDO� DATE 10-Z -B4 J.w. K-lon-4 D. IZVIN5 ENGINEEZ; TZ05S N. BOLTON) ace 26(20 M - CULLEIJ T C r N= 3.cD023 5 `�! gpu Nf�AtCZ`� 0 SET LEAD � TACK � "r::"� IN Top of-- WALL 0 CONC BL K, WALL v ON PZOD. ALL LEAD � TACI<5 SET LEAD TACK 4 TAG 1 I b P -E TAGGED RCE 26120 iN coNc.cg7c14 BASIN w z I ,� PINE l AVENUE ,�,_ w��pR sET L. T, zr TAG U) I CoNC. DWY. N ryr}y N St=T L.zr7, TAGG'-A.C, w PUMTJ• , 0 GONC, DWY, ,.. z o ' z w h X W F ` !- 0 (~jJ LJJ N I al J IyoT TO SCA,,LE I ,� PINE l AVENUE ,�,_ 0 z x u 0 z a. 2 0 U W U W 0 w W z -1 U. 0 w 0 z a z 1.1 F. W 0 z 0 (3 Agreement No. 5944L-21 SURVEY OF CENTERLINE 'r(PS F 8 NO.100-CPAGFr 405 SURVEY BY 90LIT14 BAY ENEINEENK CORP, TRACT NO 500Z'6 (P—L 29G1NDO) DATF 10-26-184 JX K-10ZG-4 D. IRVINE ENGINEER,; rZO55 N. e>OLTON I R.C.E. 2G I zo V. CULLEN SFC- PkGE 4C)� w Lij O C�/ cumtb lbli, e6�, -y- PINE - `4j 0` A-\ t: N UC 4- PuNc+4 mA?-Ks OW MAA 40LE- FRAME -NOTE, ALL LE&D v,,4_TACK TIES A%r-,E TAGGED TZ.C.G;. IZG120 AND ARE SHOWN 74US M NOT TO SCALE ti -NOTE, ALL LE&D v,,4_TACK TIES A%r-,E TAGGED TZ.C.G;. IZG120 AND ARE SHOWN 74US M NOT TO SCALE M 0 z Y U 0 H a N W a r - C Z a a i 0 U w U w a N W > D N I Agreement No. 59L-21 n SURVEY OF CENTERLINE TIES F B NO.100-CPAGE 4O9 SURVEY BY SOUTH BAY CNGINERING CORP, TRACT NC -11 39023 (EL 5EGUNDO) DATF 10-2,6'84 J.N. i<- l azG-4 ENGINEE(Z; ROSS N. BOL?C�N) R.C.E. ZG120 D. IRVINE 11/1. CULLEN 01�0 m 0— (V (V `n ty, NOT TO SCALE O 2�� /-S27 O.W. tT, 01 Z � C�L/ �N 4 � I I _ NOTE: Ac�L 1✓�AD O ' da TACK TIES ARE _J TAGGED RR.C.E, 26120 AND ARE SHOWW Ti4U5 D —UJ f\,� PINE _AVENUC SEE PAGE 408 w z J IL 0 w x 0 z a z z 0 Agreement No. 591-2 21 SURVEY OF r- 11V�' 7'1-'4r,5' F 8 NOzec--C PAGE 4�(' SURVEY By-,Zqt--eA >,' C—Mr-A- cn,,,-xp TRACT NO 2�0!23 S'4:Gl11,100, - 41_ DATF /O -Z6-94 -'rWG - RO SS 4/ BOG 7-04/ AGS 4,540 f/ 7-14 Ck- 71,-.9 5'� 7- W1 rV r4C- /7C7AE 26120 14AI'C 4):F�E CA SET S,W,&T.-"� 01 Q ,j NOT TO i5c4X Qv A VeA1L1,:F I a z Y U 0 W r Z N J LL ¢ 0 N w W � N ¢ N CN W z 0 a z � p 0 Z U X W W U F > p Ir z N 0 W > M y i Agreement No. 59t -w2 3n SURVEY OF CENTEZLINE TIES F B NO100-[PAGE 412 SURVEY BY 30(M4 My ENGWCERING COR TRACT NO 3023 (ELSEGUNDO) DATE' ►0-26-54- J.N. K-IOZG- 4 D. IRVINE E.NGIMGER: ROSS N. BOLTON, R.C.E.2G120 M• CULLEN UJ NOT TO SCALE C—v G �• Q En 0 Spa 'N� U 77 �J U Z_..., j NOTE'. ALL LEAD ... .......... —ct TACK TIES acRE 74GGED R.C.E. ZG IZO —v AND ArZE 9f40WN TUUS Q J �� PINE _ AVENUE Document Number PWFB 0 81AOency Index REFERENCES R-1 = CITY OF EL SEGUNDO CENTERLINE TIE SHEET L-24 = RECORD DISTANCE PER R-1 = RECORD & CALCULATED DISTANCE PER R-1 - TANGENT OVER = INDICATES VERIFIED MEASURED DISTANCE BY EDM Agreement No. 59L4-24 N.T.S. MONUMENT NOTES FD NOTHING AT MANHOLE, ESTABLISHED PER TIES ON R-1, BEFORE CONSTRUCTION. FD NOTHING AT MANHOLE AFTER CONSTRUCTION, SET 4 — 3' MAG NAIL & WASHER STAMPED NLS 5411" STRADDLERS FLUSH PER TIES HEREON. FD LEAD, TACK & TAG *LS 3587' IN T.C. PER R-1. Fl) LEAD & TACK IN T.C. PER R-1. Fl) LEAD & TACK IN T.C., FITS POSITION OF LEAD, TACK & TAG -LS 3587- PER R-1. BPELSG-2016 Page 2 of 2 w W OC PINE AVENUE CE 19-27' Ir Z W U Agreement No. 59L4-24 N.T.S. MONUMENT NOTES FD NOTHING AT MANHOLE, ESTABLISHED PER TIES ON R-1, BEFORE CONSTRUCTION. FD NOTHING AT MANHOLE AFTER CONSTRUCTION, SET 4 — 3' MAG NAIL & WASHER STAMPED NLS 5411" STRADDLERS FLUSH PER TIES HEREON. FD LEAD, TACK & TAG *LS 3587' IN T.C. PER R-1. Fl) LEAD & TACK IN T.C. PER R-1. Fl) LEAD & TACK IN T.C., FITS POSITION OF LEAD, TACK & TAG -LS 3587- PER R-1. BPELSG-2016 Page 2 of 2 Agreement No. 5944 PWFB 0816 58 CORNER RECORD Agencyindex Document Number City of EL SEGUNDO County of LOS ANGELES , California Brief Legal Description CENTER STREET do PINE AVENUE CORNER TYPE COORDINATES (Optional) I N. E. ❑ Govemment Gomer 11 Control Elevation tA —.......,�. -- — ❑ Meander ❑ Property Units Metric ❑ U.S. Survey Foot ❑ Rancho Other Horizontal Datum Zone —Epoch Date Date of Survey 6/21 /19 do 8/294L9 vertical Datum ❑Complies with Public Resources Code SSSBOI-8819 ❑Complies with Public Resources Code §§889D4WM PLS Act Ref: ❑ 8785(d) 8771 ❑ 8773 ❑ other. Corner/ ❑ Left as found [j Established ❑ Rebid!# re -Construction Monument: ❑ Found and tagged Reestablished ❑ Referenced Post -Construction Narrmattve of comer identified and monument as found, set, reset, replaced, or removed: See sheen #2 for description (a): SURVEYOR% STATEMENT This Comer Record as prepared by me or under my direction in conformance with Q the Prrs d Surveyors' Acct on 8,/30/19 `' No. 5411 � Sign P.L.S. -, No. 5411 � Exn. 9/30/20 C�` COUNTY SURVEYOR'S STATEMENT This Corner Record was received SW I Q LAND and examin and led NOV 08 2019 ��� fCURT R A4 Signed- L.S r R.C.E. No. r 70 Title `n LS 6388 CAQ County Surveyor's Comment BPELSG 2018 Page 7 oft i Agreement No. 5944 APPENDIX 5 Project Locations �'S' II,, � p u il, wo I 0) @ CL 0 U) 2 I nrwi�mwui wain ' z tl,J.re U i I @ 0 Z m Nw y y VJ i" wd! m c y J V IMY U O U PC E �'S' II,, � p u il, wo I 0) @ CL 0 0 0 I LL ti 0 Cl) IV N; A Yln,.,0 M ntJl,u Lr) U) 2 0 z tl,J.re U ` m co (9 O U y y VJ i" wd! m c y E ¢ m o IMY U O U PC E yoa=io m �=oo °- o� cts r 000m �gQ _ 5E _ Z _ � o 0 U o y J) Z to>tsW E Ouo"moQ 0 0 I LL ti 0 Cl) IV N; A Yln,.,0 M ntJl,u Lr) Agreement No. 5944 APPENDIX 6 Striping Quanitities Agreement No. 5944 BASE BID STRIPING QUANTITIES Notes: All striping shall be thermoplastic; contractor to verify quantities prior to bidding Double yellow striping quantity reflects total length of 2 yellow stripes plus 1 black stripe Crosswalk striping quantities reflect both top and bottom crosswalk stripe measurements Successful contractor shall provide striping schedule of values at pre -construction meeting DESCRIPTION QTY UNIT STOP pavement marking 9 EA STOP bar/limit line 180 LF STOP AHEAD marking 1 EA 25 marking 1 EA Double yellow striping 5,664 LF White crosswalk striping 217 LF Yellow crosswalk striping 78 LF Diagonal white parking lines 600 LF ADA diagonal parking stall 2 EA Blue fire hydrant marker 9 EA UNIT COST ($) TOTAL ($) Agreement No. 5944 ALTERNATIVE BID STRIPING QUANTITIES California St. from E. Imperial Hwy to cul-de-sac Notes: All striping shall be thermoplastic; contractor to verify quantities prior to bidding Double yellow striping quantity reflects total length of 2 yellow stripes plus 1 black stripe Crosswalk striping quantities reflect both top and bottom crosswalk stripe measurements Successful contractor shall provide alt. striping schedule of values at pre -construction meeting DESCRIPTION QTY UNIT STOP pavement marking 2 EA STOP bar/limit line 46 LF STOP AHEAD marking 495 EA Double yellow striping 2,592 LF White crosswalk striping 150 LF Blue fire hydrant marker 1 EA UNIT COST ($) TOTAL ($) Agreement No. 5944 July 1, 2020 ADDENDUM NO. 1 to THE CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS for PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 ATTENTION BIDDERS: The following additions, modifications, and clarifications to the specifications shall be included in, and become a part of, any contract which may be executed for the above project in the City of El Segundo: 1. The bid due date and time are still Tuesday, July 7, at 11:00 am 2. Please see this project's attached Supplement to Addendum 1 for contractor questions, the City's responses to them, and additional information provided during the job walk. 3. Please note the changes to the bid opening procedure listed in the Supplement. As evidence that the BIDDER has read this Addendum, the BIDDER must acknowledge same in the space provided below and submit this Addendum with the Bid Proposal. Failure to provide such acknowledgement shall render the bid as non-responsive and subject to rejection. Signature: Print Company Name: Page 1 of 1 Date: 350 Main Street, El Segundo, CA 90245-3895 (310) 524-2300 Fax (310) 640-0489 Agreement No. 5944 CITY OF EL SEGUNDO PAVEMENT REHABILITATION PROJECT PROJECT NO.: PW 20-01 ADDENDUM NO. 1 SUPPLEMENT DATE: July 1, 2020 TO: All Prospective Bidders The following questions have been raised regarding this bid. The response to each question is provided here and made available to all prospective bidders. Further, a summary of requirements discussed in Council Chambers at the pre-bid meeting are listed on Page 3. The information and clarification provided in this Addendum shall be considered as incorporated into the specifications for the above -referenced project. All other portions of Contract Documents and previous Addenda not specifically mentioned in this Addendum remain in force. Question 1: Does the 25 working days include construction days for the alternative California Street sections? Answer: No. An additional five (5) working days will be added to the contract time if the California Street alternative bid item is approved. Question 2: On Pine Avenue, is the area with diagonal parking part of the project scope? Answer: Yes. Grinding, paving, re -striping, etc. in the area with diagonal street parking is included as part of the E. Pine Avenue project scope. Question 3: What are the work hours for the three streets again? Answer: E. Imperial Avenue: 9:00 am to 3:00 pm E. Pine Avenue: 9: 7:00 am to 4:00 pm (Alternative California Street bid item): 9:00 am to 3:00 pm Question 4: What is the speed limit on eastbound E. Imperial Highway? Answer: 50 mph. A traffic control plan will be required for all street sections and, if approved, for California Street. Question 5: What school is near Pine Avenue? Answer: Agreement No. 5944 Center Street Elementary School, on Center Street and E. Mariposa Avenue, is one block north of E. Pine Avenue. August 26, 2020 is scheduled as the first day of school this year. The school's contact information is listed below. www.centerstreetschool. ori 700 Center St, El Segundo, CA 90245 (310) 615-2676 2. El Segundo Middle School, on Center Street and E. Holly Avenue, is one block south of E. Pine Avenue. Historically the school has re -opened on the second Tuesday in August. The school's contact information is listed below. www. else �4undomiddleschool.om 332 Center St, El Segundo, CA 90245 (310) 615-2690 JULY 7, 2020 CHANGES TO THE BID OPENING PROCEDURE: City Hall is located at 350 Main Street, El Segundo, CA 90245. At this time it is uncertain which City Hall entry points will be accessible to the public when the building re -opens next week. Given that, please follow the procedure below for next Tuesday's bid opening: Each bidder's representative is required to wear a mask and maintain a 6 -foot distance when interacting with City staff and others, and when they are inside the building. 2. Instead of the City Clerk's Office, the bid opening will be held either in the City Hall Council Chambers or in the foyer in front of the Council Chambers. These areas are accessible through the double automatic doors on the west end (Main Street side) of the City Hall Building. The double doors will be unlocked and opened 15 minutes prior to the bid opening. Bidders are more than welcome to submit their bid by the US postal service or other carrier service. However, the bidder is responsible for verifvina their bid has been received in the Citv Clerk's Office prior to the bid opening. The City Hall number is 310-524-2300. 2 Agreement No. 5944 4. Bidders can also choose to submit bids in person. The City Clerk's Office will open the doors 15 minutes before the bid opening and will accept bids at that time. Please plan to be there early enough so that your bid may be received well before 11:00 am, in case there are multiple bidders there to do the same thing. 5. The City Clerk's Office will collect bid packages and record them on a log sheet. Having submitted their bid, bidders will wait outside the double doors in the quad until the bid opening. 6. Bid packages will either be opened in the Council Chambers or in the foyer. Bid amounts will be recorded on the log sheet and the log sheet will be signed by representatives from the City Clerk's Office and the Public Works Department. 7. The Public Works Department will email the bid log sheet to all planholders shortly after the bid opening.