Loading...
CC RESOLUTION 5205RESOLUTION NO. 5205 A RESOLUTION APPROVING COMMUNITY BENEFIT PLAN NO. 18-01 AND ENVIRONMENTAL ASSESSMENT NO. EA -1233 TO ALLOW THE CONSTRUCTION OF AN ADDITION THAT EXCEEDS THE PERMITTED BUILDING HEIGHT IN THE SMOKY HOLLOW SPECIFIC PLAN AREA, AND LOCATED AT 140 OREGON STREET. The City Council of the City of EI Segundo does resolve as follows: SECTION 1: The Council finds and declares that: A. On December 14, 2018, Mark Telesz on behalf of Smoky Hollow Industries LLC, filed an application for Community Benefits Plan No. CBP 18-01 and Environmental Assessment No. EA -1233 to allow a 60,000 square -foot addition that exceeds permitted building height in the Smoky Hollow Specific Plan area; B. The application was reviewed by the City's Planning and Building Safety Department for, in part, consistency with the General Plan and conformity with the EI Segundo Municipal Code ("ESMC") and the Smoky Hollow Specific Plan; C, The City reviewed the project's environmental impacts under the California Environmental Quality Act (California Public Resources Code §§ 21000, et seq., CEQA) and the regulations promulgated thereunder (14 California Code of Regulations §§ 15000, et seq., CEQA Guidelines; D. The Planning and Building Safety Department completed its review and scheduled a public hearing regarding the application before this Commission for January 23, 2020; E. On January 23, 2020, the Planning Commission hearing was cancelled and all items scheduled on the agenda were continued to February 13, 2020; F. On February 13, 2020, the Planning Commission held a public hearing to receive public testimony and other evidence regarding the application including, information provided to the Planning Commission by city staff; and, adopted Resolution No. 2882 recommending that the City Council approve the proposed Tier II Community Benefit Plan for the project; G. The City Council held a duly noticed public hearing on March 3, 2020, to review and consider the staff report prepared for the project, receive public testimony, and review all correspondence received on the project; and H. This resolution and its findings are made based upon the evidence presented to the City Council at its March 3, 2020, hearing including the totality of the evidence in the administrative record. SECTION 2: Factual Findings. The City Council finds as follows: A. On September 18, 2018, the City Council approved General Plan Amendment No. GPA 13-01, Zone Change No. ZC 13-01, Zone Text Amendment No. ZTA 13-01 and Environmental Assessment No. EA -1011 for the comprehensive update of the Smoky Hollow Specific Plan. The Smoky Hollow Specific Plan covers 94.3 acres and is located in the northwest quadrant of the City, generally bounded by Standard Street to the west, EI Segundo Boulevard to the south, Pacific Coast Highway to the east and Grand Avenue and Holly Avenue to the north. An Environmental Impact Report (EIR) was prepared pursuant to the requirements of CEQA Guidelines Section 15161. The Specific Plan was analyzed to support a total net increase of 517,094 square feet of building area by 2040. B. The subject site is located in the Smoky Hollow East (SH -E) zone within the Smoky Hollow Specific Plan. C. The surrounding land uses consist of: Aircraft equipment parts, Machine Shop, and Research and Development to the north; Industrial Machine Shop, Warehouse, and Dog Daycare with Overnight Kennel Services to the east; Oil Refinery (Chevron), Parking Lot, and Chevron Park to the south; and Wholesale, Warehouse, Printing, and Industrial Machine Shop to the west. D. The project site is a corner lot with 456.75 feet of frontage on Franklin Avenue, 279 feet of frontage on Oregon Street, and 200.46 feet of frontage on East EI Segundo Boulevard. The site is 191,896 square feet and slopes down toward the southeast. The highest grade level is located near the intersection of Oregon Street and Franklin Avenue, and the lowest grade level drops in elevation by 34 feet near the intersection of Kansas Street and EI Segundo Boulevard. E. The site contains three mid-century Industrial brick buildings with a combined total gross floor area of 76,353 square feet. The current building uses are light industrial with associated accessory general office, research and development, and warehouse. The property was previously owned by Standard Oil until 1957 it was purchased by the current owner in 2015. F. The applicant requests the approval to exceed the permitted building height in the Smoky Hollow Specific Plan area by 20 feet. The "base development standards" for the specific plan listed in Table 2-2 allows a building height of 35 feet and a maximum FAR of 1.0. Pursuant to Table 4-1, projects that include a building height of 50 feet or more, and an FAR greater than 1.5 requires a Tier II Community Benefits Plan approval from the City Council. G. The project is in compliance with the Smoky Hollow East (SH -E) zoning district development standards with the exception to the building height. The proposed building addition will reach a height of 55 feet. H. The Smoky Hollow Specific Plan allows certain deviations from the development standards if the applicant offers, and the City accepts, a community benefit plan. In order to approve the project, the City Council must find the value of the proposed Tier II Community Benefits Plan is adequate in implementing the objectives of the Specific Plan in exchange for the approval of the additional building height for the project. SECTION 3: Environmental Assessment. The project is categorically exempt from further environmental review pursuant to California Code of Regulations, Title 14 ("CEQA guidelines") Section 15332 as a Class 32 exemption (Infill Development) for the following reasons: 1. The City Council certified a Final Environmental Impact Report (FEIR) and a Mitigation Monitoring and Reporting Program (MMRP) on September 18, 2018 for the development of the Smoky Hollow Specific Plan. The Smoky Hollow Specific Plan area was analyzed to allow 517,094 square feet of building area for office, commercial, and industrial uses. No new significant effects previously analyzed in the FEIR will result from a minor increase in building height within the Smoky Hollow Specific Plan area. 2. The General Plan designation for the property is Smoky Hollow Specific Plan and the zoning designation is Smoky Hollow -East, both of which permit the proposed office use. 3. The site is 191,896 square feet, and it is in an urban area, surrounded by: Office, Heavy Industrial, Research and Development, Light Industrial Warehouse, Overnight Kennel Services, Oil Refinery (Chevron), and Parking. 4. The site has no value as a habitat for endangered, rare or threatened species. The site is currently developed with an existing building and an asphalt -paved parking lot and has no landscaped planters or vegetation of any kind. In addition, on September 18, 2018, the City Council certified an Environmental Impact Report (EIR) and a Mitigation Monitoring and Reporting Program (MMRP) for the Smoky Hollow Specific Plan. The project is consistent with the EIR build -out projections and subject to the certified MMRP, which is incorporated as conditions of approval in the draft resolution. The EIR concluded that development in the Plan area would have no impact on special -status species, sensitive habitats, wetlands, or wildlife movement or nursery sites (Chapter 7 —Biological Resources). However, the EIR included Mitigation Measures 7-1 and 7-2 to reduce potential impacts to migratory nesting birds to a less than significant level. Those mitigation measures are incorporated in the draft resolution as conditions of approval. As a result, the project will not have a significant impact on habitat for endangered, rare, or threatened species. f:r a:qu,M ,3c4 11 °„ 5. The project would not result in significant effects relating to traffic, noise, air quality, or water quality. The Smoky Hollow Specific Plan EIR anticipated an additional 517,094 square feet of development in the Plan area, including projects that may exceed the base development density limits, such as the subject project. The subject project would add a net 57,675 square feet, which represents 11 percent of the potential additional development in the Plan area and therefore not result in a substantial increase in traffic. The EIR analyzed the potential traffic impacts in Chapter 18. With regard to Traffic, the EIR included Mitigation Measures 18-1 and 18-2 to reduce impacts to two intersections of Pacific Coast Highway at Grand Avenue and at EI Segundo Boulevard. Additional impacts to 105 freeway on - ramps with local streets and conflict with the Congestion management Program (CMP) were determined to be significant are unavoidable in the EIR and the City Council adopted a statement of overriding considerations for those impacts. In addition, the project is subject to the City's Traffic Mitigation Impact Fee. Therefore, the project's traffic impact is anticipated to be less than significant. The EIR analyzed the potential noise impacts in Chapter 15. The EIR found that noise levels in the plan area would increase due to an increase in traffic generally and would have a significant impact and unavoidable impact. The City Council adopted a statement of overriding considerations for these impacts. Impacts during construction and operation were determined to be less than significant, because projects are expected to comply with the City's General Plan Noise Element policies and the EI Segundo Municipal Code Noise and construction hour limitations. As a result, the project's noise impact is anticipated to be less than significant. The EIR analyzed the potential air quality impacts in Chapter 6. The analysis concluded that development anticipated in the plan area would have less than significant air quality impacts. In addition, the subject project would comply with South Coast Air Quality District rules regarding emissions, the General Plan Air Quality Element Policies, and the ESMC limitations on dust and particulate matter emissions during construction and operations. As a result, the project's air quality impact will be less than significant. The EIR analyzed the potential water quality impacts in Chapter 12. The analysis concluded that development anticipated in the plan area would have less than significant impacts on water quality. The project would comply with the Los Angeles Regional Water Quality Control Board permit regulations, the General Plan Conservation Element policies, and the ESMC limitations on emissions into the City's storm drain system during construction and operation. As a result, the project's water quality impact is anticipated to be less than significant. 6. The site can be adequately served by all required utilities and public services. The Smoky Hollow Specific Plan EIR analyzed the potential impacts on utility services in Chapter 19. The analysis concluded that development anticipated in the plan area would have less than significant impacts on utilities, including water, waste ! II JI II'°,pun :; water, and solid waste. As mentioned above, the EIR accounted for all development in the plan area. Therefore, the subject project's impact on utility services is anticipated to be less than significant. The Smoky Hollow Specific Plan EIR analyzed the potential impacts on public services in Chapter 17. The analysis concluded that development anticipated in the plan area would have less than significant impacts on services including Police, Fire, Parks and Recreation, and public schools. The subject project will be constructed in compliance with the latest applicable Fire codes and Police security requirements, which will help limit demand for those services. In addition, the project is subject to the City's Development Impact Mitigation Fees, including Police, Fire, and Parks fees. As a result, the project's public services impact is anticipated to be less than significant. 7, Historic resource assessment: In addition to the above, the Smoky Hollow Specific Plan EIR analyzed the potential impacts on Cultural Resources in the plan area (Chapter 8), including older potentially historic buildings. To address the potential impacts, the Mitigation Monitoring and Reporting Program (MMRP) included Mitigation Monitoring Measure (MM) CULT MM 8-1 that requires an assessment of buildings older than 50 years prior to demolition to determine whether they have potential value as a historic resource for CEQA purposes. Pursuant to Mitigation Monitoring Measure CULT MM 8-1, staff conducted an assessment of the existing building onsite to determine whether the structure meets the criteria for inclusion on a historic register. The assessment, incorporated herein by reference, concluded that the three structures located at the site do not merit inclusion on a historic register and, thus, need not be treated as historic resources under CEQA and may be demolished without any further environmental review. In conclusion, based on the evidence presented above and in the Smoky Hollow Specific Plan EIR the project is exempt from further environmental review. SECTION 4: Community Benefits Findings. After considering the above facts, the Planning Commission finds as follows: A. The proposed additional building height, intensity, or deviation from the development standards would not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. The proposed building height for the project is compatible with the neighborhood in that two-story buildings, tall petroleum storage drums, and 200 -foot tall distillation columns are located in the immediate vicinity. The additional 20 -foot building height is not anticipated to be detrimental, in that the project provides excess on-site parking and bike racks. As a result, the project is not anticipated to have significant off-site parking impacts. The project is located in a developed area which contains all utilities and public infrastructure. Additionally, before the City u..!i 1 1P1 IPpp a ::" a52 S: tl issues building permits for the project, the applicant will submit detailed plans to the City for review for compliance with all applicable Building and Fire safety codes. Therefore, the project overall is not anticipated to be detrimental to the public health, safety, or welfare. B. The proposed community benefit provides exemplary project and/or streetscape design. The Specific Plan contains 32 specific design guidelines in five categories including, building character, open space, landscaping, connectivity, and signage and art. Compliance with at least 17 of the guidelines is required to consider a project exemplary in building and/or streetscape design. The proposed project incorporates 21 of the 32 guidelines. C. The proposed community benefits directly implements objectives of the Specific Plan. 1. Part of the proposed community benefit consists of compliance with the Smoky Hollow design guidelines. Compliance with the guidelines directly implements the Smoky Hollow Design Objectives in Specific Plan Section 2.4.1 as follows: a. The project design helps preserve Smoky Hollow's existing character by incorporating materials and colors that are consistent with existing buildings in the area and with the neighborhood's industrial character. b. The project offers sidewalk oriented entries, in that the ground floor office space has direct access from the public sidewalk, which assists in activating the Oregon Street frontage. c. The project facilitates pedestrian activity and access to all transit modes, in that it incorporates a pedestrian connection from Oregon Street to Franklin Avenue and provides bicycle parking above the minimum requirements along the property frontage, which will enhance access to the property by alternative means. d. The project encourages active and passive design to conserve natural resources, in that its design incorporates floor to ceiling windows on the front elevation and multiple large windows along the north and east elevations, which will provide a lot of natural light in the new building, thereby reducing use of electricity for lighting purposes. In addition, the project will make use of drought tolerant plant species in the landscaped areas, which will reduce the use of water for landscaping. 2. The proposed community benefit plan implements the goals and objectives of Specific Plan Chapter 3 regarding publicly owner rights-of-way and publicly accessible open spaces. The proposed community benefits plan includes public improvements to utilities in the public right-of-way, sidewalks, landscaping adjacent to the street, and open space, which will in turn help integrate cyclists, pedestrians, and transit users for businesses to flourish. D. The value of the proposed community benefits bear a relationship to the value generated by the project. The City contracted Kosmont and Associates, Inc. (Kosmont) to prepare a comprehensive financial report of the proposed Tier II Community Benefits Plan for the project. Staff evaluated the value of the community benefits being offered and the financial gain to the applicant by allowing additional building height of 20 feet. The results are presented in the attached (Exhibit B) worksheet. Although the Planning Commission should evaluate the appropriateness of the community benefits in relation to the applicant's requested exceptions, Commissioners should not make their assessment on monetary value alone. This information was provided in support of Finding B in Tier II that requires the evaluation of these values. Presently the proposed benefits are deemed by Staff to be adequate and we recommend that the Commission, should they agree with Staff's view, consider Finding B in Tier II to be met. E. The proposed community benefits do not principally benefit the project occupants of the project, but rather provide a district or area -wide benefit to the larger Smoky Hollow Plan area. The applicant is providing the following list of items intended to benefit directly the public and not principally the occupants of the project: 1. Public art - large scale public art along the envisioned re -imagined Franklin Avenue inspired by John D. Rockefeller (former property owner). 2. Transformative project - significant investment for an architecturally expressive design that rehabilitates the original 1950s mid-century fagade rather than demolishing. The unique striking design will become a landmark for the neighborhood and possibly the city. The cost for striking architectural elements such as exposed structural steel, large scale balconies and exterior decks, massive mid-century like steel windows and other period materials will build upon the character of the smoky hollow neighborhood and inspire equally striking designs by other developers. 3. Public seating - architectural seating along the sidewalk area within the public right-of-way facing Franklin Avenue and Oregon Street. 4. Public art - large scale motivational public art visible from Pacific Coast Highway on the east face of the garage to encourage leadership and economic development. 5. Preservation and rehabilitation - preservation and rehabilitation of the existing brick facade. 6. Streetscape improvements - new public sidewalk segment adjacent to Oregon Street where there is currently no sidewalk. 7. Mid -block pedestrian passageway - interesting overall massing with a pedestrian and vehicular mid -block passageway from Oregon Street providing mid -block access through the site to a parklet facing Franklin Avenue. I °, 8. Sidewalk widening and utility improvements - removal of 2 existing power poles and associated guy -wires at the sidewalk facing Oregon Street which remove barriers for wheelchair and pedestrian access. Additionally, several low voltage and high voltage overhead lines on Oregon Street and East Franklin Avenue will be removed and placed underground to beautify the streetscape views. 9. Lighting and wayfinding - period appropriate exterior lighting and directional signage for the project will be provided adjacent to the sidewalks facing Franklin Avenue and Oregon Street. Staff evaluated the value of the community benefits being offered and the financial gain to the applicant by allowing additional building height of 20 feet. The results are presented in the attached worksheet. Although the Planning Commission should evaluate the appropriateness of the community benefits in relation to the applicant's requested exceptions, Commissioners should not make their assessment on monetary value alone. This information was provided in support of Finding B in Tier II that requires the evaluation of these values. Presently the proposed benefits are deemed by Staff to be adequate and we recommend that the Commission, should they agree with Staffs view, consider Finding B in Tier II to be met. SECTION 8: Approvals. Subject to the conditions listed on the attached Exhibit "A," which are incorporated into this Resolution by reference, the Planning Commission recommends City Council approval of Environmental Assessment No. EA -1233 and Community Benefits Plan No. CBP 18-01. SECTION 6: Reliance On Record. Each and every one of the findings and determination in this Resolution are based on the competent and substantial evidence, both oral and written, contained in the entire record relating to the project. The findings and determinations constitute the independent findings and determinations of the Planning Commission in all respects and are fully and completely supported by substantial evidence in the record as a whole. SECTION 7: Limitations. The Planning Commission's analysis and evaluation of the project is based on information available at the time of the decision. It is inevitable that in evaluating a project that absolute and perfect knowledge of all possible aspects of the project will not exist. In all instances, best efforts have been made to form accurate assumptions. SECTION 8: Summaries of Information. All summaries of information in the findings, which precede this section, are based on the substantial evidence in the record. The absence of any particular fact from any such summary is not an indication that a particular finding is not based in part on that fact. SECTION 9: This Resolution will remain effective unless superseded by a subsequent resolution. Y S 0 11 Ir. V iI,.) U � SECTION 10: A copy of this Resolution must be mailed to Mark Telesz, and to any other person requesting a copy. SECTION 11: This Resolution is the City Council's final decision and will become effective immediately upon adoption. PASSED, APPROVED AND ADOPTED this 3rd of March, 202 CV, Pirs , Mayor Pro ATTEST: STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) SS CITY OF EL SEGUNDO ) I, Tracy Weaver, City Clerk of the City of EI Segundo, California, do hereby certify that the whole number of members of the City Council of said City is four; that the foregoing Resolution No. 5205 was duly passed and adopted by said City Council, approved and signed by the Mayor Pro Tem, and attested to by the City Clerk, all at a regular meeting of said Council held on the 3rd day of March, 2020, and the same was so passed and adopted by the following vote: AYES: Mayor Pro Tem Pirsztuk, Council Member Pimentel, and Council Member Nicol NOES: None ABSENT: None ABSTAIN: Mayor Boyles Tcar y Weav City Clerk APPROVED AS TO FORM: Mark . Hensley, Ci Corney RESOLUTION NO. 5205 Page 9 of 17 RESOLUTION NO. 5205 Exhibit A CONDITIONS OF APPROVAL In addition to all applicable provisions of the EI Segundo Municipal Code ("ESMC"), Mark Telesz on behalf of Smoky Hollow Industries, LLC agrees to comply with the following provisions as conditions for the City of EI Segundo's approval of Environmental Assessment No. EA -1233 and Community Benefit Plan No. CBP 18-01, ("Project Conditions"): IT on 100�0 IM This approval is for the project as shown on the plans, renderings, and materials board dated -stamped received on October 30, 2019 and on file with the Planning and Building Department. Before the City issues a building permit, the applicant must submit plans, showing that the project substantially complies with the plans and conditions of approval on file with the Planning and Building Safety Department. Any subsequent modification to the approved design must be referred to the Planning and Building Safety Director for a determination regarding the need for Planning Commission review and approval of the proposed modification. 2. All development impact mitigation fees imposed pursuant to ESMC Chapter 15-27 of for the additional building floor area must be paid before the City issues a building permit. 3. Before the City issues building permits, the applicant must submit detailed plans in substantial compliance with the plans approved by the City Council to the Planning and Building Safety Department for review and approval. The submitted plans must comply with the screening requirements in ESMC Section 15-2-8 for mechanical equipment. 4. To avoid impacts to nesting birds, construction activities and construction noise should occur outside the avian nesting season (prior to February 1 or after September 1). If construction and construction noise occurs within the avian nesting season (during the period from February 1 to September 1), areas within 100 feet of a development site shall be thoroughly surveyed for the presence of nests by a qualified biologist no more than five days before commencement of any vegetation removal. If it is determined that the Project Site is occupied by nesting birds covered under the Migratory Bird Treaty Act, condition No. 6 shall apply. 5. If pre -construction nesting bird surveys result in the location of active nests, no grading, vegetation removal, or heavy equipment activity shall take place within an appropriate setback from occupied nests as determined by a qualified biologist. Protective measures (e.g., established setbacks) shall be required to ensure compliance with the Migratory Bird Treaty Act and California Fish and Game Code requirements. The qualified biologist shall serve as a construction monitor during those periods when construction activities occur near active nest areas to ensure that no inadvertent impacts occur. A report of the findings, prepared by a qualified biologist, shall be submitted to the CDFW prior to construction -related activities that have the potential to disturb any active nests during the nesting season. 6. Prior to the commencement of grading or demolition of subsurface structures, a professional archaeologist who meets U.S. Secretary of the Interior's Professional Qualifications and Standards, shall conduct a brief archaeological and paleontological informational session for construction personnel. The training session may consist of an in-person meeting or a written handout describing: (1) how to identify archaeological and paleontological resources that may be encountered during earth -moving activities and (2) the procedures to be followed in such an event, including contact information for the appropriate entities if archaeological or paleontological resources are discovered. 7, In the event that archaeological or paleontological resources are unearthed during ground -disturbing activities, the ground -disturbing activities shall be halted or diverted away from the vicinity of the find so that the find can be evaluated. A buffer area of at least 50 feet shall be established around the find, where construction activities will not be allowed to continue until a qualified archaeologist or paleontologist has examined the newly discovered artifact(s) and has evaluated the area of the find. Work shall be allowed to continue outside the buffer area. If the archaeologist identifies the find as a tribal cultural resource or suspects it to be a tribal cultural resource, the City will contact the Native American Heritage Commission (NAHC) to report the discovery, and will contact local Native American tribal representatives as directed by the NAHC. Should the newly discovered artifact(s) be determined to be a tribal cultural resource, Native American construction monitoring will be initiated. The City shall coordinate with the archaeologist and tribal representative(s) to develop an appropriate treatment plan. • - : & Must provide all the community benefits as stated in Exhibit B (Community Benefits Plan). If the project does not provide a benefit or ceases to provide one, the owner must submit a revised CBP including equivalent replacement benefit of an equal value to the Planning and Building Safety Director for review and approval. The Director may at his discretion refer the revised CBP to the Planning Commission and City Council for review and approval. 9. The applicant must construct the public improvements indicated in the Community Benefits Plan, including, but not limited to, sidewalk, streetscape, landscaping, parking, open space, and other improvements in the public right-of-way. Fire Department Conditions 10. The applicant must comply with the applicable requirements of the 2016 California Building and Fire Codes and the 2015 International Fire Code as adopted by the City of EI Segundo and El Segundo Fire Department Regulations. 11. The applicant must submit and have approved by the Fire Department a Fire/Life Safety Plan, identifying fire safety precautions during demolition and construction, emergency site access during construction, permanent fire department access, fire hydrant locations and any existing or proposed fire sprinkler systems and fire alarm systems prior to issuance of the building permit. General 12. All work in the City's right-of-way or on City -owned and maintained facilities shall require review and approval of the City Engineer or his/her designee. "City Engineer" = City Engineer or his/her designee throughout this document. 13. The applicant shall ensure that encroachment permits are secured from the Public Works Department/Engineering Division before commencing any and all work in the City's public right-of-way (ROW), including lane closures 14. Construction inspection shall be coordinated with the Public Works Inspector and no construction shall deviate from the approved plans without approval of the City Engineer. If plan deviations are necessary, the applicant shall provide a revised plan or details of the proposed change for review and approval of the City Engineer prior to construction. 15, Prior to issuing of the Certificate of Occupancy, the applicant shall ensure installation of all improvements required by the Public Works Department are inspected and approved by the City Engineer. 16. All construction -related parking shall be accommodated on-site. No construction related parking shall be permitted off-site. 17. A grading and drainage plan shall be provided and stamped by a California (CA) State -licensed civil engineer as part of the Building Permit process. 18. A utility plan shall be provided that shows all existing and proposed utility lines and their sizes (sewer, water, gas, storm drain, electrical, etc.), including easements, within 200 feet of the project site boundary. Street Improvements & Traffic Control 19. All new sidewalk, curb & gutter, driveway approaches, and curb ramps shall be constructed per the latest Standard Plans for Public Works Construction (SPPWC) "Greenbook" and City standards. M All existing sidewalk, curb & gutter, driveway approaches, and curb ramps that are broken or not in conformance with the latest SPPWC or City standards shall be removed and constructed per the latest SPPWC and City standards. 21. All unused driveways shall be removed and replaced with full -height curb, gutter and sidewalk per SPPWC standards and City standards. 22, The applicant shall provide a minimum 4' sidewalk clearance around any obstruction in the sidewalk i.e. posts, power poles, etc. 23. The applicant shall provide traffic control plans for all work requiring a lane closure. 24. During construction, it shall be the responsibility of the applicant to provide safe pedestrian traffic control around the site. A pedestrian protection plan shall be submitted to the Public Works Department for review and approval by the City Engineer. This may include but not be limited to signs, flashing lights, barricades and flag persons. Water 25. Any existing water meters, potable water service connections, fire backflow devices and potable water backflow devices must be upgraded to current City Water Division standards. These devices shall be placed or relocated onto private property. 26. The applicant must submit plans for water system upgrades to the City of EI Segundo Public Works Department for review and approval. 27. Any unused water laterals shall be abandoned and properly capped at the City main. The Contractor is to obtain necessary permits and licenses, and provide traffic control plans and shoring plans. Sewer 28. Prior to issuance of a Certificate of Occupancy, the sewer connection fee for this project must be paid to the City of EI Segundo Public Works Department. 29. Any unused sanitary sewer laterals shall be abandoned and properly capped at the City main. The Contractor is to obtain necessary permits and licenses, and provide traffic control plans and shoring plans. Storm Drain 30. The applicant shall remove and replace an existing broken storm drain manhole behind the property. The manhole is broken and open to illicit drainage and needs to be closed to any surface drainage. 31. Hydrologic and hydraulic calculations shall be submitted to size appropriate storm drain facilities to control on-site drainage and mitigate off-site impacts. Refer to the most recent Los Angeles County Hydrology Manual. Instructions and the manual are available at the County website at http://dpw.lacounty.gov/wrd/Publication/index.cfm. Calculations shall be signed by a registered civil engineer. 32. The project shall comply with the National Pollutant Discharge Elimination System (NPDES) requirements and shall provide Best Management Practices (BMPs) for sediment control, construction material control and erosion control. Landscaping & Irrigation 33. All public landscape improvements shall be designed to City standards and approved by the Parks & Recreation Department. 34. Projects involving more than 500 square feet of new landscaping will require a 3 - month Water Audit Report before Final. Waste Management 35. The applicant shall comply with Title 5, Chapter 2 (Garbage and Rubbish), of the EI Segundo Municipal Code. Collection/disposal/storage systems and areas must be provided in the plans that ensure compliance with State and City regulations. Miscellaneous Conditions Mark Telesz on behalf of Smoky Hollow Industries, LLC agrees to indemnify and hold the City harmless from and against any claim, action, damages, costs (including, without limitation, attorney's fees), injuries, or liability, arising from the City's approval of Environmental Assessment No. EA -1233 and Community Benefit Plan CBP No. 18-01. Should the City be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of the City approval of Environmental Assessment No. EA -1233 and Community Benefit Plan CBP No. 18-01, the Applicant and Property Owner agrees to defend the City (at the City's request and with counsel satisfactory to the City) and will indemnify the City for any judgment rendered against it or any sums paid out in settlement or otherwise. For purposes of this section "the City" includes the City of EI Segundo's elected officials, appointed officials, officers, and employees. R ,i_ 1l LJ II II C)11 II `JO, KC 5 By signing this document, Mark Telesz on behalf of Smoky Hollow Industries, LLC certifies that he has read, understood, and agrees to the Project Conditions listed in this document. e"'01 Oark Telesz, Managing Me Smoky Hollow Industries, a Limited Liability Corporation {If Corporation or similar entity, needs two officer signatures or evidence that one signature binds the company) P:\_Planning\Projects\1226-1250\1233 SHSP LLA 1325 E EI Segundo Blvd\1233 SHSP LLA 1325 E EI Segundo Blvd\EA-1233 DA and 55 FT Building Height Request= March 3, 2020\EA 1233 CC Reso 2020 docx RESOLUTION NO. 5205 Page 15 of 17 RESOLUTION NO. 5205 Exhibit B COMMUNITY BENEFIT PLAN Psr iect description: The development project at 140 Oregon Street is subject to the following applications: Community Benefits Plan No. CBP 18-01 and Environmental Assessment No. EA 1233. The development project deviates from the following Smoky Hollow Specific Plan (Specific Plan) development standards in Section 2.3: Building Height. The permitted building height is 35 feet. The proposed building height is 55 feet to the top of the roofline. The above deviation is clearly illustrated in the attached plans. In exchange for the above deviations, the applicant offers the following community benefits pursuant to Specific Plan Section 4.5.2: Consistency with design guidelines above requirements. The development project complies with 21 of the 32 design guidelines in Section 2.4 of the Specific Plan. The following list of items are intended to benefit the directly the Smoky Hollow Specific Plan area and not principally the occupants of the project: A. Public Art - Large scale public art along the envisioned re -imagined franklin avenue inspired by John D. Rockefeller (former property owner). See page 26. B. Transformative Project - Significant investment for an architecturally expressive design that rehabilitates the original 1950s mid-century fagade rather than demolishing. The unique striking design will become a landmark for the neighborhood and possibly the city. The cost for striking architectural elements such as exposed structural steel, large scale balconies and exterior decks, massive mid-century like steel windows and other period materials will build upon the character of the smoky hollow neighborhood and inspire equally striking designs by other developers. C. Public Art - large scale motivational public art visible from PCH on the east face of the garage meant to encourage leadership and business in the area and embrace the city and the neighborhood. D. Preservation and Rehabilitation - preservation and rehabilitation of the existing brick facade and structure. E. Street -space Improvements - new portion of new sidewalk connecting and continuing the public sidewalk along Oregon Street where there is no sidewalk currently. F. Sidewalk widening and utility improvements - removal of 2 existing power poles and associated guy -wires and underground utility low voltage vault at the sidewalk at Oregon street which remove barriers along the sidewalks for increased accessible access. Additionally, several associated low voltage and high voltage overhead lines on Oregon Street and E. Franklin Avenue will also be removed, beautifying the streetscape and improving utilities along the streets. New underground power and low voltage will be provided. The following list of improvements are consistent with the base standards: 1. Removal of a curb cut along Oregon Street. 2. Removal of a curb cut along E. Franklin Avenue. 3. Rooftop amenities which will add vibrancy to the streetscape by showcasing events and activity. 4. Enhanced streetscape landscaping 5. 30-40 feet tall vertical landscaping at the north and south facing garage sheer walls will include large scale publicly visible greenery from EI Segundo Boulevard, Franklin Avenue and Oregon and Kansas Streets. 6. Massing that steps back along E. Franklin and Oregon streets above the first level. 7. Clearly identifiable entries 8. Parking demand provided entirely on-site. The above community benefits are more clearly illustrated in the attached plans, Attachment: 1. Plans dated October 30, 2019 t0.'—JIFF' SHEET NAME — ` Q -EA_-cC`r f0 ;i+ � vtSsTO� ,67iil� 51TF tR ADM=4 F.h4 it �L=aL:c K1cc;r� 1 STANDARD WORKS lw- SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310616 5040 140 STANDARD WORKS OREGON EL SEGUNDO, CALIFORNIA OCTOBER 30.2019 1'=400'-O* PROJECT0 17019 140 OREGON STREET EL SEGUNDO, CA 90245 EXECUTIVE SUMMARY GENERAL OVERVIEW AND GRAND VISION THE `STANDARD WORKS- PROJECT IS A 191,896 SF PARCEL BOUND BY EAST EL SEGUNDO BOULEVARD ON THE SOUTH, EAST FRANKLIN AVENUE ON THE NORTH AND OREGON STREET ON THE WEST. THE GRAND VISION OF THE DEVELOPMENT IS A DESIGN THAT ENF'.ANCES THE EXISTING INDUSTRIAL AESTHETIC OF THE NEIGH13ORH a -D BY PRESERVING ALL MID-CENTURY FACADES AND UTILIZING SIMILAR INDUSTRIAL BUILDING MATERIALS AND TECHNIQUES TO CREATE A COHESIVE ARCHITECTURAL EXPRESSION BETWEEN THE EXISTING AND THE PROPOSED- PRESERVATION OF THE EXISTING 1950'S MID-CENTURY RED BRICK FACADE IS AN OBJECTIVE OF THE DESIGN AND THE SMOKY HOLLOW SPECIFIC PLAN THIS MIX OF UNIQUE OLD AND NEW ECLECTIC BUILDINGS IS ENTICING TO PROSPECTIVE CREATIVE AND KNOWLEDGE-BASED BUSINESSES ACROSS MANY INDUSTRIES THE LIVELY AND PEDESTRIAN FRIENDLY CREATIVE ATMOSPHERE OF STANDARD WORKS WILL CONTRIBUTE TO THE ONGOING SMOKY HOLLOW TRANSFORMATION TO AN INCUBATOR DISTRICT AND MAJOR ECONOMIC FORCE IN THE CITY USE THE CURRENT USES OF ALL EXISTING STRUCTURES IS LIGHT INDUSTRIAL WITH ASSOCIATED ACCESSORY GENERAL OFFICE AND WAREHOUSE THE MAJORITY OF THE EXISTING FLOOR AREA SHALL REMAIN AS CURRENTLY APPROVED- THE PROPOSED NEW FLOOR AREA SHALL BE A COMBINATION OF LIGHT INDUSTRIAL AND TECHNOLOGICAL USES INCLUDING R&D WITH SMALL POTENTIAL FUTURE PORTIONS OF CAFE, RESTAURANT, RETAIL AND OTHER SIMILAR USES TO SUPPORT THE DAYTIME DENSITY OF THE SITE AND THE NEIGHBORHOOD THE DEMAND FOR THESE TYPES OF USES IS GROWING AND THIS PROJECT WILL PROVIDE A RELATIVELY LARGE AREA IN EFFORTS TO MEET THE GOALS OF THE SMOKY HOLLOW EAST TRANSITIONAL LAND USE ZONING ADDITIONALLY THE PROJECT IS REQUESTING A VARIANCE TO ALLOW AN ACCESSORY FITNESS STUDIO ON THE GROUND FLOOR OF THE BUILDING FLOOR AREA AT THE COMPLETION OF THE PROPOSED PROJECT THE SITE WILL REMAIN SIGNIFICANTLY UNDERDEVELOPED WITH THE FLOOR AREA RATIO OF 0 47 WHICH IS MUCH LESS THAN THE BY -RIGHT ALLOWED 1-0 FAR IN THE BASE STANDARDS PARKING THE COMPLETED PROJECT WILL CONTAIN APPROXIMATELY 59 ON GRADE PARKING AND 398 SPACES IN THE PROPOSED PARKING STRUCTURE CURRENTLY UNDER CONSTRUCTION ON THE LOT- THE APPROXIMATE TOTAL OF 457 PARKING SPACES WILL BE MORE THAN ADEQUATE TO SERVE THE TOTAL PROPOSED FLOOR AREA MISCELLANEOUS THE HOURS OF OPERATION FOR THE DEVELOPMENT ARE STANDARD BUSINESS HOURS FIVE DAYS A WEEK WITH OCCASIONAL WEEKEND HOURS THE EXISTING BRICK STRUCTURE of 19,007 SF ON THE NORTH SIDE OF THE PROPERTY SHALL BE ENTIRELY PRESERVED AND REHABILITATED WITH LARGER OPENINGS FOR WINDOWS AND ACCESSIBLE ENTRANCES THE EXISTING NON MID-CENTURY PERIOD BENEFICIAL TILT UP CONCRETE STRUCTURE of 8,204 SF ON THE SOUTHERLY PORTION OF THE PROPERTY WILL BE ENTIRELY DEMOLISHED PLEASE SEE EXISTING SITE PLAN ON SHEET 12 CONCLUSION THE PROPOSED PROJECT DESIGN IS COMPATIBLE AND INTEGRATED WITH, AND NOT DETRIMENTAL TO, THE EXISTING DEVELOPMENT ON ADJACENT AND SURROUNDING NEIGHBORING PROPERTIES AND FURTHERMORE PAYS HOMAGE TO THE NEIGHBORHOOD'S INDUSTRIAL PAST AND ENCOURAGES LOOKING FORWARD TO THE FUTURE OF WHAT THE NEIGHBORHOOD WILL TRANSFORM INTO IN THE NEAR FUTURE COMMUNITY BENEFITS PLAN CONSISTENT WITH TIER II THE DEVELOPMENT REQUESTS THE FOLLOWING DISCRETIONARY APPROVALS WHICH ARE CONSISTENT WITH THE SPECIFIC PLAN: 1 AN INCREASE IN PERMITTED HEIGHT OF 15'-0" FROM 35' TO 50'-0" IN ACCORDANCE WITH TIER II COMMUNITY BENEFITS PLAN REQUESTED VARIANCE 1 PLEASE SEEPAGE 23 -SEEKING AN ADDITIONAL 5'-0" IN BUILDING HEIGHT FROM 50' TO 55'-0", WHICH IS SIMILAR TO THE 10% ADMINISTRATOR'S ADJUSTMENT FOR "MINOR DEVIATIONS" TO ALLOW CREATIVE MEZZANINE FLOOR AREA WITHIN THE BUILDING 2 TO ALLOW AN ACCESSORY FITNESS STUDIO OF 3,931 SQUARE FEET ON THE EAST SIDE OF THE BUILDING AT LEVEL 1 MANY CLASS A TENANTS HAVE REQUESTED THE ABILITY TO ADD AN As C:FS„C,nRY pr.--apCSrrN-mG•- FLOOR AREA AND PARKING CALCULATIONS LIT,lilrMSF: 76,353 SF EXISTING FLOOR AREA ADDITIONAL FLOOR AREA ®PROPOSED TOTAL FLOOR AREA TOTAL FAR BASED ON TIER II (1:1.5) Alm STANDARD WORKS lw SMOKY HOLLOW INDUSTWES, LLC 612E FRANKLIN AVENUE EL SEGUNDO CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30.2019 PRCJECI ,y 17019 VD - i316i 134 STREET -- 14M=I LFHAR GROSS LOT AREA (PRE DEDICATIONS) _ -- - FLOOR AREA ALLOWED (1:1.5) _ FLOM AREA BY USE USE pOSTWG PROPOSM IDUSTUNG PROPOSEDEXISTING INDUSTRIAL a12,5145F — 19,0G7 SF 10,428 SF GENERAL OFFICE 17,135 SF 8,204 SF -_-_- 9,0655F =_ 21,0725F 2L784 SF FLOOR AREA EXLSTING -- 29 649 SF — ,— ...������27 . 211 Sr ........... . ...,.1%493 S€ FLOOR AREA PROPOSED - 134 ---- -- PARXLNG REQUIRED 56 • 212 33 " PROVIDED LIT,lilrMSF: 76,353 SF EXISTING FLOOR AREA ADDITIONAL FLOOR AREA ®PROPOSED TOTAL FLOOR AREA TOTAL FAR BASED ON TIER II (1:1.5) Alm STANDARD WORKS lw SMOKY HOLLOW INDUSTWES, LLC 612E FRANKLIN AVENUE EL SEGUNDO CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30.2019 PRCJECI ,y 17019 SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310616 5040 140 OREGON OCTOBER 30, 2019 PROJECT• 17019 STANDARD WORKS 'w SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310616 5040 140 OREGON OCTOBER 30, 2019 PROJECT/ 17019 STANDARD WORKS 'w SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT t 17019 STANDARD WORKS lw SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT- MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT✓• 17019 ZONING ANALYSIS (SHSP TABLE 2-3) C. LOT STANDARDS I REQUIRED PROVIDED 1 MINIMUM LOT AREA 11,200 SF 191,896 SF 2 MINIMUM LOT FRONTAGE 50' 198' (SHSP TABLE 2-3) D. BUILDING_ DESIGN STANDARDS �1 REQUIRED PROVIDED 1. BUILDING ORIENTATION LOTS ADJOINING FRANKLIN AVENUE EX15TING NON CONFORMING HOWEVER, THE PROJECT FRANKLIN AVENUESHALL PROVIDE A MINIMUM OF ONE PROPOSES A ROLL UP DOOR PRIMARY ENTRY FACING FRANKLIN THAT OPENS TO THE FLOOR AVENUE PRIMARY ENTRY DOORS SHALL LEVEL AS LOW AS POSSIBLE- BE VISIBLE AND ACCESSIBLE FROM THE (SEE NORTH ELEVATION SHEET = PUBLIC SIDEWALK 211 2 BUILDING TRANSPARENCY: FOR NEW BUILDINGS OR NEW ADDITIONS 28% PROVIDED FRANKLIN AVENUE FRONTAGE FRONTING FRANKLIN AVENUE, A MINIMUM (SEE SHEET 21) 15% FACADE TRANSPARENCY SHALL BE - PROVIDED AT THE GROUND LEVEL OR FIRST 12 FEET OF HEIGHT ABOVE GRADE, I WHICHEVER IS LESS, THROUGH THE EVERY 4 AT -GRADE, OPEN - UTILIZATION OF WINDOWS, ENTRIES, OR SIMILAR OPENINGS. m ...... -- (SHSP TABLE 2-3) E. SETBACK STANDARDS REQUIRED PROVIDED 1-FRONTYARD NONE 3 IRRIGATION 2- SIDE YARD (NORTHERLY) _ N/A ( SEE ITEM 4 BELOW SIDE YARD (SOUTHERLY) NONE 67' -11" (TO PL) 3_ REAR YARD (EASTERLY) 1 NONE = 22' - 11" (TO FACE OF I _ ADJACENT BUILDING) 4 SIDE YARD (FRANKLIN AVE-) 1 MIN 0'. MAX 5' = 5' - 0" (TO FACE OF CURB) 5 ADJOINING ALLEY MIN- 10' _ N/A 6 ALL STRUCTURES - COMPLY WITH CORNER, DRIVEWAY, & ` EXISTING NON CONFORMING ALLEY VISIBILITY REQUIREMENTS IN ESMC' SECTIONS 15-2-6 (CORNER CLEARANCE) & € 15-2-11 DRIVEWAY VISIBILITY) -.. ...... _.... - (SHSP TABLE 24) F. OPEN SPACE & LANDSCAPING STANDARDS REQUIRED PROVIDED 1. OPEN SPACE, 10% OF LOT, 191,863 x 0.1 = 19,190 SF - 191,896 SF x 0.1 = 19,189 SF REQUIRED OPEN SPACE MAY = (SEE PAGE 28) BE PROVIDED ON BUILDING _ ROOFTOPS, HOWEVER, AT CITY OF EL SEGUNDO- COUNTY OF LOS ANGELES, STATE OF CALIFORNIA SPECIFIC PLAN: LEAST 50% OF REQUIRED ZONING: ( SH -E (SMOKY HOLLOW EAST) OPEN SPACE SHALL HAVE LIGHT INDUSTRIAL PROPOSED USE: - DIRECT ACCESS FROM THE EXTERIOR DINING / LIGHT INDUSTRIAL / RESEARCH & EXISTING GROUND DEVELOPMENT _ - EL RIATiON - YES, (PORTIONS OF EXISTING FLOOR AREA) 2- SURFACE PARKING LOT - 59 SURFACE PARKING SPACES / 4 = 15 15 PROVIDED LANDSCAPING- ON SITES _ (SEE PAGE 28) LARGER THAN 22,400 SF, A MINIMUM OF 1 TREE SHALL I BE PROVIDED ON SITE FOR I EVERY 4 AT -GRADE, OPEN - TO -THE -SKY SURFACE PARKIt ; SPACES 3 IRRIGATION + ALL LANDSCAPED AREAS, INCLUDING IRRIGATION SHALL BE TREES AT SURFACE PARKING LOTS, PROVIDED AS A DEFERRED SHALL BE PROVIDED WITH APPROPRIATE = SUBMITTAL PERMANENT WATERING FACILITIES. JURISDICTION: CITY OF EL SEGUNDO- COUNTY OF LOS ANGELES, STATE OF CALIFORNIA SPECIFIC PLAN: SMOKY HOLLOW SPECIFIC PLAN ZONING: ( SH -E (SMOKY HOLLOW EAST) PREVIOUS USE: I LIGHT INDUSTRIAL PROPOSED USE: - GENERAL OFFICE / ACCESSORY RETAIL / TAKE OUT RESTAURANT / EXTERIOR DINING / LIGHT INDUSTRIAL / RESEARCH & DEVELOPMENT _ OCCUPANCY CLASSIFICATION: _ B (GENERAL OFFICE, R&D) / A2 (TAKE OUT RESTAURANT) CHANGE OF USE: - YES, (PORTIONS OF EXISTING FLOOR AREA) CONDITIONAL USE PERMIT: NO ZONING MAP ..- Figure 2-1: Zoning Districts (SHSP TABLE 2-2) A. ALLOWABLE GROSS FLOOR AREA ALLOWED PROVIDED BASE ALLOWED 1:0 = 191,896 x 1 0 = 191,863 SF 29,649 SF (1325 E. EL SEGUNOO) COMMUNITY BENEFITS TIER II. 1 5 = 191,896 x 1 5 = 287,844 SF 19,493 SF (1320 E. FRANKLIN) B4.§N SF(140OREGON) 1134.028 SF (0.47 PAR) B. HEIGHT STANDARDS ALLOWED I PROVIDED BASE ZONING 35 -0 - COMMUNITY BENEFITS TIER II ADDITIONAL 15'= 50'-0" j1 REQUESTED VARIENCE ADDITIONAL 5'= 50'-0" + 5'-0" = 55'-0" f 54'-11" (SEE SHEET 24) HEIGHT EXCEPTIONS ELEVATOR SHAFT HOUSING IS EXEMPT FROM HEIGHT REQUIREMENTS PARAPET HEIGHT MAY EXCEED MAXIMUM BUILDING HEIGHT BY 5'-0" STANDARD WORKS ilw-- SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310616 5040 140 OREGON OCTOBER 30, 2019 12'= 1 -0' PROJECT- 17019 c�ll�a+alr.�t�. PROJECT LOCATION (SHSP TABLE 2-2) A. ALLOWABLE GROSS FLOOR AREA ALLOWED PROVIDED BASE ALLOWED 1:0 = 191,896 x 1 0 = 191,863 SF 29,649 SF (1325 E. EL SEGUNOO) COMMUNITY BENEFITS TIER II. 1 5 = 191,896 x 1 5 = 287,844 SF 19,493 SF (1320 E. FRANKLIN) B4.§N SF(140OREGON) 1134.028 SF (0.47 PAR) B. HEIGHT STANDARDS ALLOWED I PROVIDED BASE ZONING 35 -0 - COMMUNITY BENEFITS TIER II ADDITIONAL 15'= 50'-0" j1 REQUESTED VARIENCE ADDITIONAL 5'= 50'-0" + 5'-0" = 55'-0" f 54'-11" (SEE SHEET 24) HEIGHT EXCEPTIONS ELEVATOR SHAFT HOUSING IS EXEMPT FROM HEIGHT REQUIREMENTS PARAPET HEIGHT MAY EXCEED MAXIMUM BUILDING HEIGHT BY 5'-0" STANDARD WORKS ilw-- SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310616 5040 140 OREGON OCTOBER 30, 2019 12'= 1 -0' PROJECT- 17019 ZONING ANALYSIS (SHSP TABLE 2-6) H. PRIVATE PARKING STANDARDS REQUIRED PROVIDED 1- NEW CONSTRUCTION & 1 (2-5/ 1,000 GROSS SF) CHANGE OF OCCUPANCY CHANGE OF USE: 27,211 SIF ._ (/ 400 = 68 SPACES 2 ADDITIONS TO BUILDINGS (2 5 / 1,000 GROSS SF) NEW CONSTRUCTION: 57,675 SF / 400 = 144 SUB -TOTAL REQUIRED 1 66 + 144 = 212 SPACES 1 457 SPACES NOTE: ALSO SEE ZONING 1325 E- EL SEGUNDO BLVD. = 56' ANALYSIS CHART ON PAGE ` THAN 25 FT IN WIDTH EXCEPT WHERE FOR EXISTING PARKING = 1320-133 E- FRANKLIN AVE = 33' REQUIREMENTS FOR 1325 E EU_ SEGUNDO BUILDING AN D FOR SAFETY PURPOSES 1320-1330E FRANKLIN AVE BUILDING TOTAL REQUIRED ' 212 + 56 + 33 = 301 SPACES 3. TANDEM PARKING TANDEM SPACES SHALL HAVE A MAXIMUM I N/A (NONE PROPOSED) AREA < 50,000 SF LENGTH OF 40 FEET (PARKING FOR 2 _ VEHICLES MAXIMUM) - 4 BICYCLE PARKING (CONSISTENT WITH SECTION 5 106 4 OF i ALL LONG TERM AND a 50,000 SF AND/OR REQUIRED FOR THE THE 2016 CALIFORNIA GREEN BUILDING SHORT TERM BICYCLE (STANDARDS CODE: = PARKING IS PROVIDED IN NEW PROJECTS ANTICIPATED TO GENERATE VISITOR TRAFFIC SHALL PROVIDE ONE 2—BIKE CAPACITY RACK FOR 5% OF NEW VISITOR MOTORIZED VEHICLE PARKING SPACES BEING ADDED, WITH A MINIMUM OF ONE 2—BIKE CAPACITY RACK ADDITIONS OR ALTERATIONS THAT ADD 9 OR FEWER VISITOR VEHICLE PARKING SPACES ARE EXCLUDED NEW BUILDINGS WITH 10 OR MORE TENANT—OCCUPANTS OR ADDITIONS OR ALTERATIONS THAT ADD 10 OR MORE TENANT VEHICLE PARKING SPACES SHALL PROVIDE SECURE BICYCLE PARKING FOR 5% OF THE TENANT VEHICLE PARKING SPACES BEING ADDED, WITH A MINIMUM OF ONE SECURE BICYCLE PARKING SPACE ACCEPTABLE PARKING FACILITIES SHALL BE CONVENIENT FROM THE STREET AND SHALL MEET ONE OF THE FOLLOWING: SECURE AND ACCESSIBLE AREAS IN THE GARAGE PERMITTED SEPARATELY A COVERED, LOCKABLE ENCLOSURES WITH PERMANENTLY ANCHORED RACKS ` FOR BICYCLES; B. LOCKABLE BICYCLE ROOMS WITH `PERMANENTLY ANCHORED RACKS; OR C LOCKABLE, PERMANENTLY ANCHORED _BICYCLE LOCKERS. 5 OTHER PARKING AREA !_REFER TO ESMC SECTION 15-15-1 ! PROVIDED DEVELOPMENT STANDARDS THROUGH 15-15-5 (SHSP TABLE 2-5) G. ACCESS, LOADING AND TRASH STANDARDS REQUIRED PROVIDED 1 VEHICULAR ACCESS A LOTS ADJOINING AN ALLEY ARE PROHIBITED FROM PROVIDING CURB N/A (NO ALLEY) CUTS ALONG STREET FRONTAGES B FOR LOTS NOT ADJOINING AN ALLEY, A MAXIMUM OF 1 CURB CUT IS ALLOWED PROVIDED, SEE SITE PLAN FOR EACH 150 FT OF LOT FRONTAGE ALONG A PUBLIC STREET C NEW CURB CUTS ALONG FRANKLIN NO NEW CURB CUTS PROPOSED AVENUE ARE PROHIBITED ON FRANKLIN AVENUE D- CURB CUTS SHALL NOT BE MORE THAN 25 FT IN WIDTH EXCEPT WHERE N/A REQUIRED BY THE CITY TO BE LARGERAlm FOR SAFETY PURPOSES - STANDARD 2- LOADING A NOT REQUIRED IF GROSS BUILDING SEE B BELOW WORKS AREA < 50,000 SF _ B REQUIRED IF GROSS BUILDING AREA a 50,000 SF AND/OR REQUIRED FOR THE FOLLOWING USES WHEN THE USE = PROVIDED, SEE EXCEEDS 2,500 SF IN SIZE: RESTAURANT ! LEVEL 01 SHEET 16 OR OTHER FOOD SALES AND SERVICE C ON—SITE LOADING AREAS SHALL BE AT LEAST 18 FT LONG AND 10 FT WIDE FOR _ PROVIDED, SEE LOTS ADJOINING AN ALLEY, LOADING _ LEVEL 01 SHEET 16 AREAS SHALL ADJOIN OR HAVE ACCESS FROM THE ALLEY LOADING SPACES MAY ENCROACH INTO ANY REQUIRED ALLEY SETBACK 3 REFUSE COLLECTION _ A REFUSE COLLECTION SERVICE SHALL FULLY SCREENED 200 SF BE CONTRACTED WITH AN APPROVED TRASH & RECYCLING AREA LOCAL SERVICE PROVIDER REFUSE BEING CONSTRUCTED AS A COLLECTION AREAS SHALL PART OF THE GARAGE BE SCREENED PER ESMC SECTION 15-2-8 D B. ON LOTS ADJOINING AN ALLEY, N/A (NO ALLEY) s REFUSE COLLECTION STORAGE AREAS SHALL BE ORIENTED TO AND ACCESSED I s FROMTHEALLEY, F 200 SF TRASH & RECYCLING, FULLY ENCLOSED ` 3 2 SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 12' = V—D PROJECT. _ a 1019 EXISTING AERIAL PLAN 1" = 160'-0" STANDARD WORKS 1w SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELES2 OFFICE 310 616 5040 140 OREGON OCTOBER 30.2019 1' = 160'-0' PROJECT h 17019 NORTHEAST SOUTHEAST NORTHWEST SOUTHWEST ---------®®® APROXIMATE OUTLINE OF PROPOSED BUILDING STANDARD WORKS lw SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 9020.5 COFTTACT: MARK TELESZ OFFICE 310616 5040 140 OREGON OCTOBER 30.2019 12' = 1'-0' PROJECT019 FO PN MH PER PVVFB81CV 81 ACC ASE,=OF�EORT FRAIKLI AND FI -4 OF LOT 13-1. €3LK 123, R7 I� @ wwE (A) - - -- - - s s --244 W (I4) _ 2- - �2 CONI CONC. --- STREET SEfAENT _ WAU Dwy ..... _ _ _ �R--_ = __ _ _ _ L OL uyi _ - _ -4i _ - iTpi—i9 - p 81.2if9 ,ON RET€ _ - _ OREGON STREET - SUMP - 9.80 4 £g. SLID- t..0: PP.i'. CONC,L ING -132; & 132 19 (131.59) DOCK l8 - .' EL 3_ NG. STAIRS 1 19 - _ (131 51) _ a 2,3 _' ____ - 31- ` _--.21- Q EB j. 4Y_ I f=- - z — 19 211' j �77 V. 232-3& (C) f ASPHALT / „--, C P CI_w1 F m STANDARD WORKS iw SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 6' = 1'-0' PROJECTS -- _17019 LSC ­ 232-3& (C) f ASPHALT / „--, C P CI_w1 F m STANDARD WORKS iw SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 6' = 1'-0' PROJECTS -- _17019 REMOVING EXISTING CURB CUTS ON EAST FRANKILING AVE AND OREGON STREET IN ACCORDANCE WITH SMOKY HOLLOW SPECIFIC PLAN FNORTH BUILDING TO BE ENTIRELY PRSERVED & REHABILITATED [-ARCHITECTURALLY I INSIGNIFICANT SOUTH BUILDING TO BE DEMOLISHED ;DIAGRAM SUMMARY: 1 2 EXISTING CURB CUTS ARE BEING ELIMINATED 2 1 EXISTING CURB CUT IS BEING RELOCATED ;3 SEVERAL OVERHEAD POWER LINES ARE BEING ELIMINATED I i :4 1 EXISTING UTILITY POLE IS BEING ELIMINATED SITE PLAN - EXISTING /111 1' = 40'-(Y' 0. 20' 40. 80, IEASLFMANIUIN AVE 7- (E) CURBCUT TO BE REMOVED 77-77:� k v v STANDARD (E) LOW VOLTAGE-,- % WORKS UTILITY POLE TO BE REMOVED NORTH BUILDING' SHALL BE ENTIRELY ra z PRESET VED SF 0 0 19117 E3 m LU 0 SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 ®v CONTACT, MARK TELESZ OFFICE 3106165040 (E) CURBCUT To BE REMOVED fE I LOW VOLTAC-L --TILJTY POLE TO BE REMOVED 140 (E) CURBCUT TO SOUTH BUILDING OREGON BE REMOVED SHALL BE ENTIRELY DEMOLISHED (E)OVERHEAD 8,204 &F UTILITY TO BE REMOVED, TYP OCTOBER 30, 2019 1*=40'-0' PROJEETi 17019 ;DIAGRAM SUMMARY: 1 2 EXISTING CURB CUTS ARE BEING ELIMINATED 2 1 EXISTING CURB CUT IS BEING RELOCATED ;3 SEVERAL OVERHEAD POWER LINES ARE BEING ELIMINATED I i :4 1 EXISTING UTILITY POLE IS BEING ELIMINATED SITE PLAN - EXISTING /111 1' = 40'-(Y' 0. 20' 40. 80, n ROOF - FLOOR AREA U 1"=60'-O" LEVEL 03 - MEZZ 9,688 SF --� C::1 I LEVEL 03 - MF77 - FLOOR AREA - 1" = 60'_0" LEVEL 03 21,784 SF n LEVEL 03 - FLOOR AREA U 1" = 60'-0" LEVEL 02 - MEZZ 9,149 SF I F I I I I LEVEL 02 - ME - FLOOR AREA 3 1„ = 60,-0„ LEVEL 02 21,022 SF F I I I I I I I a: I I I I � I �_ - - - - - J n LEVEL 02 - FLOOR AREA L J 1" = 60'-0" LEVEL 01 NORTH 18,715 SF I I I I - i � I � I I I I I I I L�st----J I_ -- �J LEVEL 01 SOUTH 4,529 SF LEVEL 01 - FLOOR AREA +1' 1" = 60'=0., FLOOR AREA SCHEDULE NAME AREA I LEVEL 01 NORTH _ 18,715 SF I LEVEL 01 SOUTH 4,529 SF LEVEL 02 _ 21,022 SF LEVEL 02 - MEZZ 9,149 SF LEVEL 03 21,784 SF _ LEVEL 03 - MEZZ 9,688 SF Grand ;pial 84,686 SF I FLOOR AREA (GROSS): The area included within the surrounding exterior walls of a building or portion thereof, exclusive of garages, vent shafts and courts The floor area of a building, or portion thereof, not provided with surrounding exterior walls shall be the usable area under the horizontal projection of the roof or floor above STANDARD SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO. CA 90245 CONTACT; MARK TELESZ OFFICE 310 616 5040 140 OREGON PROJECT VV, -., 17019 EAST FRANKLIN AVE R7 145 KANSAS ST 1320-1330 E SATCO FRANKLIN AVE 771 r4 1l 136140142 OREGON ST- j. — -------------------- 7& -1---- \—TRASH & RECYCLING AREA -PEOESTRIA PASSAGEWAY 310E FRANKLIN AVE 1 L 4 "LE L PARKING GARAGE; 396 SPACES co < w 7w z Lof - 0 Ie 1325 E FRANKLIN AVE!_ 11301 E FRANKLIN AVE 11475 E FRANKLIN AVE rl EAST EL SEGUNDO BLVD i N SITE PLAN - PROPOSED 1`=60'-0` ol 30' 60, 120' L) STANDARD WORKS i w - SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TEUESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30,2019 1- 60 -E PROJECT' _-17019 E1 LEVEL 01 1 _ 30'-0" Z 0 0 0 0 E FRANKLIN AVE i ham_ - - _ -- F1TNESSESTUDIO jl -- I PAl , -_- - 4z (POTENTIAL FUTURE ICER _ FOOD -TO -GO) 72 - -'ROTI= THE DIMISING WALLS -S1=-.N-i=N TENANT SPACES ARE FOR =_ N _DIAGRnMIVIATIC PURPOSES ONLY 0' 15' 30' 60 - STANDARD WORKS SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 9020.5 CONTACT: MARK TELESZ OFFICE 310 616 50E0- 140 OREGON OCTOBER 30, 2019 1'=30-0- 17019 '=30-0'17019 LEVEL 02 MF77 11, = 30'-0" NOTE: THE DIMISING WALLS BETWEEN TENANT SPACES ARE FOR ,DIAGRAMMATIC PURPOSES ONLY N 11 ol 15' 30, Im-m win NOTE: THE DIMISING WALLS BETWEEN TENANT SPACES ARE FOR DIAGRAMMATIC PURPOSES ONLY I N LEVEL 02 1" = 39-0" 0. 15, 30' 10 � SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5340 140 OREGON OCTOBER 30.2019 1-30-0' —IL019 ------------ -- STANDARD WORKS XT Im-m win NOTE: THE DIMISING WALLS BETWEEN TENANT SPACES ARE FOR DIAGRAMMATIC PURPOSES ONLY I N LEVEL 02 1" = 39-0" 0. 15, 30' 10 � SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5340 140 OREGON OCTOBER 30.2019 1-30-0' —IL019 NOTE: THE DIMISING WALLS (BETWEEN TENANT SPACES ARE FOR ' DIAGRAMMATIC PURPOSES ONLY N 0' 1 5' 30' 60' - LEVEL 03 1" a 30'-0" 3# LME DENOTES MEZZANINE STANDARD - STRUCTURE ABOVE WORKS - -NOTE: THE DIMISING WALLS BETWEEN TENANT SPACES ARE FOR DIAGRAMMATIC PURPOSES ONLY N 0' 15' 30' 60` u SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO. CA 90245 CONTACT. MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30.2019 1'=30'-O' PROJECT ✓ 17019 -LANDSCAPING, TYP STANDARD Ll j WORKS SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE ROOF ELSEGUNDO CA90245 CONTACT' MAR TLESZ DECK 6165040 OFFICE 31 0 _J 140 OREGON OCTOBER 30. 2019 1/32- = l. -O. PROJECTS N ROOF 1132" = 1 --G° 0. 15' 30' T. -P. �J 214'-8" TOPG LA TO- 200' 8" _ROOD_ - s ����_;• LEVEL 03 MEZZ,s- v 176'-6" o; - tV N 7 LEVEL 03 166'-4"j �> LEVEL 02 MEZZ -� �J 156'-2" N' sof n LEVEL 02 146' -0.. a VEL 07 1 I EFRANKLIN AVE - N V WEST ELEVATION (OREGON STREET ELEVATION) ti imp- -A]RD FORMED - CLEAR i_SPANDREL AC -s COW-RETELstl:- DARK GRAY POWDER COAT• • ; t'-; ... L;'_.i .„ (E) BRICK FINI GLAZING SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLINAVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310616 SO40 140 OREGON OCTOBER 30, 20194. hdICafed PROJECT*W019 TOP 200' L( OWl s� TOE 8" ROOF 0. 1'-6` IN LEVEL 03 M= t1 176'- 6" ll L VEL 0 y - f4- 6ri LEVEL 02 MEZZ /1 LEVEL 2-- 46_ DATUM Au 7 13' - _ _ LEVEL 01 n 131'131' - 6" 1 --466SFJ 1,622SIF =28% 15%= OKI - - - (THE TRANSPARANCY IS NEARLY DOUBLE THE MINIMUM REQUIRED PERSHSP) FRANKLIN AVENUE TRANSPARENTCY DIAGRAM NORTH• aw ARCHff a -CONCr 'ETE a - POWDER , C. - MED T- 1 - BRICK SHGLAZING .R.L r. C-ONCRETF STANDARD WORKS - 1 w SMOKY HOLLOVY INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 20194s IDOkOffid PROJECT + 17019 OREGON ST y$.t �"iE-4 FL.S 3T- CRit1-1 won SOUTH ELEVATiON nom -mmma�r VIRACON GLASS 114' ARVMGN =GRAY POWDERCOAT WOOD PLANKS CMU BLOCKm (E) BRICK STANDARD WORKS I w - SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30.2019As Indlcaled PROJECT t -4 — 17019 TOP200' _ - 8"L(Oy 2-1 N � { v LEVEL039F€Z_Z-0_-i ='o N N i O N _ O ( �--F � - I'\ " 1 L V`EL 02 F2 - o iti _ N ---- - v 15I, _ 2,. LEVEL 02 �; �� DATAJM � 139'•9` LEVEL 01 n - 131'6" 1 CMU BLOCKm (E) BRICK STANDARD WORKS I w - SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30.2019As Indlcaled PROJECT t -4 — 17019 T.0 P. /l 214'--8" -V TOP L( OW) n 200'200' - 8" lF, it =8" - LEVEL 03 MEZZ L1 n6'-6.6° _ LE 1WS 4° LEVEL 02 MEZZ n 156- 22" 1 I EVE L 02 '- Y 146 0 DA M 131` - 9- MLIN AVE LEVEL 01 L\ 13131' - 6- 6"-V EAST ELEVATION 0 gem AW WPM oo\ o - ;#T_1 D _2 MT-2GLAZING FtAHSA CONCRETE '=zs-'I CMU-'fCMU BLOCK 4? -1 (E) BRICK STANDARD WORKS lw- SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30.20194s Indlcaled PROJECTt 17019 HEIGHT JUSTIFICATION DIAGRAM & STATEMENT TO._ 214'- W z NOTE: THE REQUESTED— T ADJUSTMENT IS 4-11 -OC LEVEL 03 MEZZ 1' -6" Q�LEVEL 03 -4" E�EL 02IEZZ & '-2- �Io , LEVEL 02 p Qok1.31 6 LEIJELO!�— ELEVATOR L VATOR PIT . . . . . . � - 6" El w 0 THE DIAGRAM ABOVE AND THE FOLLOWING IS A LIST OF JUSTIFICATIONS FOR THE REQUESTED 4'-1 1 OF ADDITIONAL FEET IN BUILDING HEIGHT: 1. THE INCREASE IN HEIGHT FACILITATES THE PRESERVATION OF THE EXISTING INDUSTRIAL FACADES, WHICH IS A STRONG DESIRE OF THE SMOKY HOLLOW SPECIFIC PLAN INSTEAD OF DEMOLISHING THE EXISTING STRUCTURE WHICH WOULD NOT REQUIRE THE ADDITIONAL HEIGHT REQUESTED BECUASE THE EXISTING DOCK HEIGHT SLAB OF THE FIRST LEVEL IS MAINTAINED IN EFFORTS TO PRESERVE THE FACADES IN LIEU OF DEMOLISHING THE EXISTING BUILDING AND LOWERING THE FIRST FLOOR SLAB ELEVATION, 2 IN THE EXECUTIVE SUMMARY AND FLOOR AREA CALCULATIONS ON PAGE 02 OF THIS DOCUMENT THE FLOOR AREA SUMMARY CHART SHOWS THAT AT THE CURRENT FAR OF 0.5 THE SITE WILL NOT BE ABLE TO ACHIEVE THE BY -RIGHT ALLOWED FLOOR AREA IN ACCORDANCE WITH THE BASE STANDARDS OF 1 -0, AND CERTAINLY NOTTHAT OF THE ALLOWED FAR OF 1.5 IN ACCORDANCE WITH TIER 1 COMMUNITY BENEFITS PLAN. THE MAXIMUM TOTAL FLOOR AREA OF THE ENTIRE DEVELOPMENT WILL BE 05 WHICH IS SIGNIFICANTLY LESS THAN WHAT IS ALLOWED WITHOUT THE REQUESTED MINOR INCREASE IN HEIGHT. THE INCREASE IN HEIGHT AND THE INCREASE IN FLOOR AREA IN THE SPECIFIC PLAN WERE ALWAYS TIED TOGETHER THEREFORE TO ACHIEVE ANY ADDITIONAL FLOOR AREA IN THE SPECIFIC PLAN AREA A HEIGHT INCREASE IS ALSO AN ABSOLUTE REQUIREMENT AND WITHOUT THE INCREASE THE MEZZANINE LEVELS WOULD NOT BE POSSIBLE DUE TO CODE MINIMUM HEIGHT CLEARANCES IN WHICH CASE THE DEVELOPMENT WOULD BE SIGNIFICANTLY SHY OF THE BY -RIGHT ALLOWED FLOOR AREA FOR THE SITE WHICH WOULD BE BELOW AN FAR OF 0.5. 3- THIS PROPERTY IS ONE OF ONLY A FEW PROPERTIES IN THE SPECIFIC PLAN AREA THAT IS LARGE ENOUGH TO ACCOMMODATE ONE OF THE LARGEST PERCENTAGES OF FLOOR AREA IN THE SPECIFIC PLAN AND WITHOUT THIS HEIGHT THE SPECIFIC PLAN AREA WILL NOT BE ABLE TO UTILIZE A LARGE PERCENTAGE OF THE ADDITIONAL FLOOR AREA ENVISIONED BY THE CITY. EVEN WITH THIS HEIGHT INCREASE THE FLOOR AREA WILL BE FAR LESS T -1 -LAN THE 1.0 THAT IS ALLOWED BY RtGK-, 4. THE PROPOSED MEZZANINES AT LEVELS 2 AND 3 PROVIDE ACCESSORY FLOOR AREA INCLUDING RESTROOMS, KITCHENETTES AND REST AREAS WHICH ARE HIGHLY DESIRABLE IN THE CREATIVE OFFICE LANDSCAPE ALLOWING FOP UN -INTERRUPTED USABLE FLOOR AREA 00 THE PRIMARY LEVELS AND ACCESSORY USES ON THE MEZZANINE LEVELS. THE MEZZANINE LEVELS ARE LIMITED BY THE BUILDING CODE IN SIZE TO 50% OF ITS PRIMARY LEVEL THEREFORE, THEY DO NOT GROSSLY ADD FLOOR AREA OR MUCH DENSITY AS THEY ARE PRIMARILY ACCESSORY USES ON THE MEZZANINES. 5. SUCCESSFUL CREATIVE OFFICE DESIGN HAS BEEN ENTIRELY REDEFINED IN THE PAST DECADE. TALL OPEN SPACES WITH LARGE WINDOWS ALLOWING FOR NATURAL LIGHT TO REACH THE DEPTHS OF THE FLOOR IS CRITICAL FOR AN INSPIRING AND CREATIVE OFFICE ENVIRONMENT. COUPLED WITH THESE DESIGN FEATURES A MEZZANINE IS ALSO A LARGE PART OF THE CREATIVE ENVIRONMENT ALLOWING FOR THE SEPARATION OF ACCESSORY USES FROM THE MAIN FLOOR LIKE RESTROOMS AND KITCHENETTES AS WELL AS PROVIDING A VISUAL INTEREST IN TALL OPEN SPACES- MEZZANINES ALSO SERVE AS AREAS FOR IMPROMPTU GATHERING AND REFLECTIVE SPACES AND ADD A LOT OF VALUE TO POTENTIAL CREATIVE OFFICE TENANTS IN MANY RESPECTS, A DESIGN AS THE ONE PROPOSED HEREIN WITHOUT MEZZANINES WOULD BE A GREATLY MISSED OPPORTUNITY TO ATTRACT CLASS A TENANTS TO THE CITY. 6. THE MINIMUM OCCUPIED HEIGHT PER THE BUILDING CODE IS T-0" AND AS YOU CAN SEE FROM THE DIAGRAM ABOVE WE ARE PROPOSING JUST A FEW INCHES MORE PER LEVEL TO ALLOW FOR SPRINKLERS, LIGHTING, DUCTING ET CETERA THE REQUESTED INCREASE IS NOT GROSSLY ADD TO THE MINIMUM HEIGHT REQUIREMENT, RATHER ITS JUST ENOUGH TO ALLOW FOR USABLE SPACE THAT MEETS THE MINIMUM HEIGHT REQUIREMENTS OF THE BUILDING CODE. 1 STANDARD WORKS 'w umo. LIP 2221 S BARRY AVE, SUITE 200 LOS ANGELES, CA 90064 CON'rACT'. LEE SEGA 310 748.5777 SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TEUESZ OFFICE 310 616 5040 136 140 142 OREGON =W==== NOV 26. 2018 1116' = 1`0' PROJECT 17019 SMOKY HOLLOW SPECIFIC PLAN (SECTION 4) -.......... ..........., PROPOSED COMMUNITY BENEFIT AMENITIES (BEYOND THE BASE STANDARDS THAT DO NOT PRINCIPALLY BENEFIT THE PROJECT) A PUBLIC ART- LARGE SCALE PUBLIC ART ALONG THE ENVISIONED RE -IMAGINED FRANKLIN AVENUE INSPIRED BY JOHN D. ROCKEFELLER (FORMER PROPERTY CRAM. -ER) B TRANSFORMATIVE PROJECT -SIGNIFICANT INVESTIVIENI FOR AN ARCHITECTURALLY EXPRESSIVE DESIGN THAT REHABILITATES THE ORIGINAL 1950S MID-CENTURY FACADE RATHER THAN DEMOLISHING THE UNIQUE STRIKING DESIGN WILL BECOME A LANDMARK FOR THE NEIGHBORHOOD AND POSSIBLY THE CITY THE COST FOR STRIKING ARCHITECTURAL ELEMENTS SUCH AS EXPOSED STRUCTURAL STEEL, LARGE SCALE BALCONIES AND EXTERIOR DECKS, MASSIVE MID-CENTURY LIKE STEEL WINDOWS AND OTHER PERIOD MATERIALS WILL BUILD UPON THE CHARACTER OF THE SMOKY HOLLOW NEIGHBORHOOD AND INSPIRE EQUALLY STRIKING DESIGNS BY OTHER DEVELOPERS C PUBLIC SEATING - ARCHITECTURAL SEATING ALONG THE RIGHT-OF-WAY D PUBLIC ART - LARGE SCALE MOTIVATIONAL PUBLIC ART VISIBLE FROM PCH ON THE EAST FACE OF THE GARAGE MEANT TO ENCOURAGE LEADERSHIP AND BUSINESS IN THE AREA AND EMBRACE THE CITY AND THE NEIGHBORHOOD E PRESERVATION AND REHABILITATION - PRESERVATION AND REHABILITATION OF THE EXISTING BRICK FACADE AND STRUCTURE - F STREETSPACE IMPROVEMENTS - NEW PORTION OF NEW SIDEWALK CONNECTING AND CONTINUING THE PUBLIC SIDEWALK ALONG OREGON STREET WHERE THERE IS NO SIDEWALK CURRENTLY G MID -BLOCK PEDESTRIAN PASSAGEWAY - INTERESTING OVERALL MASSING WITH A PEDESTRIAN AND VEHICULAR MID -BLOCK PASSAGEWAY THROUGH THE BUILDING CREATING A FREE AND OPEN MID -BLOCK ACCESS THROUGH THE SITE TO THE POCKET PARK BEYOND_ H SIDEWALK WIDENING AND UTILITY IMPROVEMENTS - REMOVAL OF 2 EXISTING POWER POLES AND ASSOCIATED GUY -WIRES AT THE SIDEWALK AT OREGON STREET WHICH REMOVE BARRIERS ALONG THE SIDEWALKS FOR INCREASED ACCESSIBLE ACCESS ADDITIONALLY, SEVERAL ASSOCIATED LOW VOLTAGE AND HIGH VOLTAGE OVERHEAD LINES ON OREGON STREET AND E FRANKLIN AVENUE WILL ALSO BE REMOVED, BEAUTIFYING THE STREETSCAPE AND IMPROVING UTILITIES ALONG THE STREETS NEW UNDERGROUND POWER AND LOW VOLTAGE WILL BE PROVIDED (CONSISTENT WITH THE BASE STANDARDS) REMOVAL OF A CURB CUT ALONG OREGON STREET REMOVAL OF A CURB CUT ALONG E FRANKLIN AVENUE_ PROMINENT CORNER CAFE WITH MAXIMUM B EXTERIOR SEATING ROOFTOP AMENITIES WHICH WILL ADD VIBRANCY TO THE STREETSCAPE BY SHOWCASING EVENTS AND ACTIVITY. ENHANCED STREETSCAPE LANDSCAPING 30A0 FEET TALL VERTICAL LANDSCAPING AT THE NORTH AND SOUTH FACING GARAGE SHEER WALLS WILL INCLUDE LARGE SCALE PUBLICLY VISIBLE GREENERY FROM EL SEGUNDO BOULEVARD, FRANKLIN AVENUE AND OREGON AND KANSAS STREETS - MASSING THAT STEPS BACK ALONG E FRANKLIN AND OREGON STREETS ABOVE THE FIRST LEVEL CLEARLY IDENTIFIABLE ENTRIES PARKING DEMAND PROVIDED ENTIRELY ON-SITE ITEMS ABOVE CORRESPOND TO COMMUNITY BENEFITS DIAGRAMS ON SHEET 25 TRANSFORMATIVE PROJECT • CREATIVE IDEAS AND FURTHER SUPPORT THE SPECIFIC VISION OF SMOKY HOLLOW- • CATALYZE FUTURE CHANGE • ADDRESS KEY ISSUES SUCH AS PARKING AND MOBILITY WITH A COMPREHENSIVE SOLUTION TO PARKING • FACILITATE DEVELOPMENT OF CREATIVE OFFICE AND FLEXIBLE RESEARCH SPACE • PROMOTE ARTISTIC INDUSTRIAL VIBE WITH A RELAXED BEACH COMMUNITY FEEL • CREATE AN INTERESTING DESTINATION NEW INFRASTRUCTURE FOR FIBER OPTIC NETWORK THAT MAINTAINS THE DESIRABILITY OF THE AREA TO CREATIVE AND TECH -BASED BUSINESSES THE PROPOSED PROJECT MEETS EVERY ONE OF THE CHARACTERISTICS OF A "TRANSFORMATIVE PROJECT" AND EXCEED THESE BASE STANDARDS BY RAISING THE BAR FOR EACH CHARACTERISTIC WITH THE PROPOSED VERY EXPRESSIVE ARCHITECTURAL DESIGN. STANDARD WORKS lw SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 12'=l' -O' PROJECT!17019 COMMUNITY BENEFITS DIAGRAM _Ai PUBLIC ART ON E FRANKLIN 0 • STRIKING ARCHITECTURE I -_ C _ PUBLIC SEATING - IS LARGE SCALE INSPIRATIONAL PUBLIC ART 3 • E _ PRESERVATION OF EXISTING 1950s FACADES d all -7 47- ~p _ - - - A -2 _ ` 6 { - EAST FRANKLIN AVE IF 4k 1 NLC R _ N.I.0 rIG I F- N N � Q N 1 t NIC I NIC I - - 7 N.I.C. F I L c EAST EL SEGUNDO BLVD 3, SITE PLAN - PROPOSED LIGHTING PLAN 1 1 = O._01 F NEW SIDEWALK I G MID -BLOCK PASSAGEWAY STANDARD SMOKY HOLLOW KVDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT -.M KTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 1' = B0-0- PROJFCT- --_' -- 17019 PUBLIC ART CONCEPT: JOHN D. ROCKEFELLER'S STANDARD OIL WAS THE PREVIOUS OWNER OF THIS PROPERTY, TO HARNESS THIS HISTORY AND PROVIDE PUBLIC ART, WE PROPOSE A MURAL WITH ONE OF JDR'S QUOTES: "DON'T BE AFRAID TO GIVE UP THE GOOD TO GO FOR THE GREAT." CONCEPT 1: CONCEPT 2: ART DETAIL: - JPA T JDR Pant b .Frnd to 0- "p the good to So For tf.'rant _ IpR -Jm Dont 6e afrad lagm Wthe good b go for tk grew ,DR STANDARD WORKS iw SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT* 17019 SMOKY HOLLOW SPECIFIC PLAN (SECTION (SHSP TABLE 2-4) F1 & F2. LANDSCAPING REQUIRED REQUIRED PROVIDED _ t MIN 10% OF LOT AREA 191,896 SF x.1 = 19,186 1 HORIZONTAL LANDSCAPING AT GRADE 5,883 SF 2- VERTICAL LANDCAPING 5,032 SF 3- ROOFTOP OPEN SPACE AREA 6,800 SF 4 ROOFTOP LANDSCAPING AREA 1,618 SF 19,333 SF s VA 145 KANSAS ST - r \: 1320-1330 E. -.�_,� SATCO - _ Epi 7y jj4jI i I FRANKLIN AVE - a It 1310E FRANKLIN AVE ; 14 LEVEL PARKING GARAGE, 396 SPACES j j I j 11325 E. FRANKLIN AVEI 1 I I € 1 11301 E- FRANKLIN AVE_ --- ....... --- 1475E FRANKLIN AVE 0 , LANDSCAPING AREA PLAN _ I _ (SHSP TABLE 2-4) F3. TREES REQUIRED PROVIDED 1:4 ON GRADE PARKING -E LOT 1 = 27 27 ON GRADE PARKING i3 4 = 15 REQUIRED LOT 1 = 6 LOT 1 = 28 TOTAL 27 ON GRADE [ 15 TREES PROVIDED STANDARD WORKS lw_ SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30,2019M Indicated PROJECT- - -.. rp 17019 STANDARD WORKS lw- SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT* 17019 STANDARD WORKS 1w SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT!17019 AMIL STANDARD WORKS lw- SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO. CA90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT♦ 17019 STANDARD WORKS lw- SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90295 CONTACT: MARK TELESZ OFFICE 310 616 5090 140 OREGON OCTOBER 30, 2019 ` PROJECT- 17019 Adlk STANDARD WORKS ,w SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT' 17019 STANDARD WORKS mw SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO. CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT Y 17 019 STANDARD WORKS lw- SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO. CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30.2019 PROJECT- 17019 Adak STANDARD WORKS lw- SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310616 5040 140 OREGON OCTOBER30,2019 g PROJECT' 17019 STANDARD WORKS I w - SMOKY HOLLOW INDUSTRIES, LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 PROJECT* 17019 ACCESS POINTS FROM — 2ND FLOOR, TYP. 3 + 2 GARAGE DOORS OUTDOOR CONFERENCE ROOMS 3 LOCATIONS, TYP g IoI ``iT- - II ROOF PAVING INTEGRALCOLOR TOPPING SLAB / - SCORED iI 2ND FLOOR PEDESTAL PAVING MOVEABLE SHADE --- UMBRELLAS UMBRELLAS TREES IN SQUARE PLANTERS 36" - 42" H 2ND FLOOR BALCONYINSET -1 b - i — I OUTLINE OF 2ND FLOOR n BALCONY BELOW, SEE" - INSET - GAME AREA TYP. 12" HIGH PEDESTRIAN WALKWAY UNDER RAMP PLANTER AREAS E OUTLINE OF ENTRY PARKINGRAMP OVERHEAD a W `•��� 1 y Z O U' K r 0 FRANKLIN AVENUE Adlk STANDARD WORKS lw_ I SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30.2019 12' = 1'-0' PROJEGT�4 �- ��17019 MATERIALS Driveable Grass, Pocket.parkPaviq BIKE AMENITIES OVER STRUCTURE PLANTING Tree planters FURNITURE Colorful metal and wood commerdal pieces to complementcustom items LAND -1 -- �_- tAe65i R94 Eft E��i(;:Tu a: STANDARD WORKS I - W__ SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 12'= 1'-0' PROJECT* 17019 Agonisfiexuosa PeppermintWillow Evergreen 25'- 35'H x 15'-30'W MshitWoniarobusfa Mexican Fan Palm Evergreen to 100° H x 10'W 61,91,111 Giniiyo bgobaAummn Gog Autumn Gold Maidenhaifliee Dedduous40'Hx30'W golden fall color (ormus(oggygrid Smoke Tree Dedduous10'_15'Hx10'-19'W Boutelo w gradlis 'Blond Amb Mon' Blond Ambition Grama Grass Evergreen/ I' -2'H xW red bloom spring - summer tonwndra longifohaTreeze' DwaifMatRush Evergreen/ 2'- 3'H x Z -4V red bloom spring - summer hfu19en5ffgia(qpJ11dn5'Lendcd Regal Mist Pink Mulhy Grass Evergreen/ 4'11 x3 W pink flowers late summer- fall Pasporum'Solver Sheed Silver Sheen Kohuhu Evergreen/ 12'H x 6'W (opromw repeas'Pac& S unse r Pacific Sunset Mirror Plant Evergreen/ 5'H x3'W red foliage Rhaphlokpis unibefWaVinc,' DwarfTeddol-lawftm Evergreen/4'- 6H) 2' -TW white flowers sprint HesperalbeTrakeight5' Brakelights Red Yucca Evergreen 12'-3'HxW red bloom spring - summer Nassellatenui5sinw Mexican Feather Grass Evergreen X411 xW golden summer- fall AsdeMs(urassovka'Silky Deep Red' Red Butterflyweed Evergreen/3'-TW3V red -orange flowers Summer - attracts butterflies IAND', � , SMOKYT OLLOWINDUSTRIES,LLC 612E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARKTELESZ OFFICE 310 616 5040 OCTOBER 30, 2019 12'=I' -O' PROJECTf — 1LO19 W.-lultv.-Ito I SOUTH FACING / SUNNY fteriusibmis. MINESEWISTERIA NORTH FACING /SHADY Stephanolisfforibundo, MADAGASCAR JASMliNE Evergreen, 15-30 ft D&klus buccinawid, BLOOD RED TRUMPET VINE Evergreen, 20-30 ft Lonkerahiftrandiana,GANT BURMESE HONEYSLIQ(UE Evergwn,30ft Akhiaqumata, 01OCOLATE VINE Deciduous, Qlmbirg Semi-Everqreen,1530ft ,#ebiaquiwtq, GIOCOLATE VINE Semi-Evergreen,15-30 ft [AND ---RS L A R0 S C API A !CPIYFCTIJAE STANDARD WORKS 'w SMOKY HOLLOW INDUSTRIES, LLC 612 E FRANKLIN AVENUE EL SEGUNDO, CA 90245 CONTACT: MARK TEUESZ OFFICE 310 616 5040 140 OREGON OCTOBER 30, 2019 12- 1`0' PROJECT_t 17 019